Project Information

RERA Certificate No.
P51700050118
Registration No.
REA51700130747
Registration Date
2023-03-15
Developer
Raj Homes Partnership
Architect
Mr Dinanath Despande
Project Bank
KOTAK MAHINDRA BANK LIMITED
Proposed Possession
2026-12-31
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Total Units
193
Units Sold
88 (46%)
Buildings
2
Project Area
836.86 sq.m
Total FSI
14977.46
Approved FSI
13791.24
MahaRERA QR
127 Raj Homes B And C Wing
MahaRERA — P51700050118
Scan to verify on MahaRERA portal

Wing-wise Details

šŸ—ļøProposed Floors19
āœ…Sanctioned19
ā¬‡ļøBasements1
šŸ…æļøClosed Parking68
šŸ“…Completion2026-12-31
šŸ—ļøProposed Floors19
āœ…Sanctioned19
ā¬‡ļøBasements1
šŸ…æļøClosed Parking150
šŸ“…Completion2026-12-31

Apartment Configurations

B Wing

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK41.75653332
51%
2 BHK60.7134232
6%

C Wing

TypeCarpet (sq.ft)TotalBookedAvailableStatus
2 BHK60.71621250
19%
2 BHK61.0932527
16%

None

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1Bhk41.75000
0%
2Bhk60.709999084472656000
0%
2Bhk61.09000015258789000
0%

Construction Progress

B WING

Basement (if any)100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure25%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

B Wing

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure25%

C Wing

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises50%
Overall Percentage of Completion of the work done For the entire Building /Wing45%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

RERA Registered Amenities

āœ…Aggregate area of recreational Open Space
āœ…Community Buildings
āœ…Electrical Meter Room, Sub-Station, Receiving Station
āœ…Energy management
āœ…Fire Protection And Fire Safety Requirements30%
āœ…Landscaping & Tree Planting
⬜Open Parking
āœ…Sewerage (Chamber, Lines, Septic Tank , STP)40%
āœ…Solid Waste Management And Disposal
āœ…Storm Water Drains
⬜Street Lighting
āœ…Treatment And Disposal Of Sewage And Sullage Water40%
āœ…Water Conservation, Rain water Harvesting40%
āœ…Water Supply
CallWhatsApp
āœ‰ļø

Get in Touch

Our team will connect with you shortly

+91
šŸ”’ Your details are secure with us
⚔ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.
šŸ‘‹ Looking for the right project? Let me help you find it!
šŸ—ļø
MPE Project Advisor
ā— Online now