Project Information

RERA Certificate No.
P51800005179
Registration No.
REA51800016398
Developer
Mount Blanc Real Estate Llp
Project Bank
KOTAK MAHINDRA BANK
Proposed Possession
2017-12-31
Revised Possession
2018-06-30
Extended Possession
2019-12-31
Buildings
2
Project Area
1564.69 sq.m
Total FSI
7309.16
Approved FSI
1071.51
MahaRERA QR
16 Mount Blanc
MahaRERA — P51800005179
Scan to verify on MahaRERA portal

Wing-wise Details

🅿️Closed Parking1
📅Completion1900-01-01
🅿️Closed Parking1
📅Completion1900-01-01

Apartment Configurations

16 Mount Blanc - A Wing

Type Carpet (sq.ft) Total Booked Available Status
1.1 OR 2BHK 55.51 47 45 2
96%
COMMERCIAL 51.58 2 2 0
100%

16 Mount Blanc - B Wing

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 68.63 12 5 7
42%
2 BHK 75.57 11 11 0
100%
3 BHK 89.39 12 6 6
50%
3 BHK 98.76 12 8 4
67%
4 BHK 114.46 1 1 0
100%

Construction Progress

16 Mount Blanc - A Wing

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises50%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing65%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

16 Mount Blanc - B Wing

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises70%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises50%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.62%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing60%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure62%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal 100%
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.