Kept in AbeyanceP51700002078

Project Information

RERA Certificate No.
P51700002078
Registration No.
REA51700008196
Developer
Pushpak Enterprises
Project Bank
HDFC BANK
Proposed Possession
2018-03-31
Revised Possession
2021-12-30
Extended Possession
1900-01-01
Buildings
3
Project Area
1976.60 sq.m
Total FSI
2963.55
MahaRERA QR
Vighneshwar Residency
MahaRERA — P51700002078
Scan to verify on MahaRERA portal

Wing-wise Details

🅿️Closed Parking14
📅Completion1900-01-01
🅿️Closed Parking14
📅Completion1900-01-01
📅Completion1900-01-01

Apartment Configurations

Vighneshwar Residency A

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK38.21413
25%
1 BHK38.46862
75%
I BHK39.53404
0%
IRK27.5844
50%

Vighneshwar Residency B

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK32.21422
50%
1 BHK37.5413
25%
1 BHK38.75404
0%
1 BHK38.88404
0%
1 BHK39.2413
25%
1 BHK39.24404
0%

Vighneshwar Residency C

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK36.85101
0%
1 BHK37.75404
0%
1 BHK38.3422
50%
1 BHK38.83101
0%
1 BHK39.7404
0%
1 BHK39.77413
25%
1 BHK40.25404
0%
1 BHK40.59110
100%
1 RK27.52101
0%
1RK24.22101
0%
1RK24.31505
0%

Construction Progress

Vighneshwar Residency A

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing20%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure0%

Vighneshwar Residency B

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises30%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.42%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

Vighneshwar Residency C

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.42%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
CallWhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.