Project Information

RERA Certificate No.
P51700009588
Registration No.
REA51700010444
Developer
Unique Builders &Amp; Developers
Project Bank
CENTRAL BANK OF INDIA
Proposed Possession
2020-12-31
Revised Possession
2021-06-30
Extended Possession
2022-12-30
Buildings
2
Project Area
3225.00 sq.m
Total FSI
2733.05
MahaRERA QR
Twins Tower
MahaRERA — P51700009588
Scan to verify on MahaRERA portal

Wing-wise Details

🅿️Closed Parking8
📅Completion2020-12-31
🅿️Closed Parking17
📅Completion2020-12-31

Apartment Configurations

B1

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK FLAT32.6235341
97%
2 BHK FLAT44.63770
100%
SHOP6.86220
100%
SHOP6.98220
100%
SHOP8.26220
100%
SHOP8.85330
100%

B2

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK32.6230282
93%

Construction Progress

B1

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate80%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing88%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

B2

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate40%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises80%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises75%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.95%
Stilt Floor90%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing92%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space65%
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station70%
Energy management
Fire Protection And Fire Safety Requirements90%
Landscaping & Tree Planting80%
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)85%
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting75%
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting50%
Water Supply68%
CallWhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.