📞 +91 98200 30685✉️
RERA: A51800043517

Shree Siddhivinayak Park C1,C2,C3

by Satyashiv Developers
Kept in AbeyanceP51700024653

Project Information

RERA Certificate No.
P51700024653
Developer
Satyashiv Developers
Project Bank
ICICI BANKLIMITED
Proposed Possession
2026-12-30
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Buildings
3
Project Area
2920.32 sq.m
Total FSI
2920.32
MahaRERA QR
Shree Siddhivinayak Park C1,C2,C3
MahaRERA — P51700024653
Scan to verify on MahaRERA portal

Wing-wise Details

📅Completion2025-12-31
📅Completion2025-12-31
📅Completion2025-12-31

Apartment Configurations

Shree Siddhivinayak Park C1

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK35.38101
0%
1 BHK35.52101
0%
1 BHK35.91101
0%
1 BHK36.62716
14%
1 BHK40.12707
0%
1 BHK40.21734
43%
1 BHK41.03707
0%
2 BHK46.1101
0%
2 BHK60.06707
0%

Shree Siddhivinayak Park C2

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK34.53110
100%
1 BHK34.57110
100%
1 BHK35.63431
75%
1 BHK35.67440
100%
1 BHK36.84440
100%
1 BHK38.07110
100%
2 BHK45.67110
100%
2 BHK52.42440
100%

Shree Siddhivinayak Park C3

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK34.37110
100%
1 BHK35.32440
100%
1 BHK35.8110
100%
1 BHK37.05440
100%
1 BHK37.5440
100%

Construction Progress

Shree Siddhivinayak Park C1

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

Shree Siddhivinayak Park C2

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

Shree Siddhivinayak Park C3

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space100%
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station100%
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting100%
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)100%
Solid Waste Management And Disposal
Storm Water Drains100%
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
CallWhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.