📞 +91 98200 30685✉️
RERA: A51800043517

Sun City Phase I

by Sunrise Developers
Kept in AbeyanceP51700025155

Project Information

RERA Certificate No.
P51700025155
Registration No.
REA51700070962
Developer
Sunrise Developers
Project Bank
ANDHRA BANK
Proposed Possession
2026-03-15
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Buildings
4
Project Area
18665.00 sq.m
Total FSI
14251.46
MahaRERA QR
Sun City Phase I
MahaRERA — P51700025155
Scan to verify on MahaRERA portal

Wing-wise Details

🚗Open Parking27
🅿️Closed Parking27
📅Completion2025-03-15
🚗Open Parking30
🅿️Closed Parking31
📅Completion2024-09-15
🚗Open Parking14
🅿️Closed Parking24
📅Completion2023-09-15
🚗Open Parking35
🅿️Closed Parking35
📅Completion2025-03-15

Apartment Configurations

Sun Divine D Wing

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK34.26606
0%
1 BHK34.27606
0%
1 BHK37.95505
0%
1 BHK37.97404
0%
2 BHK44.8612012
0%
2 BHK45.8510010
0%
2 BHK48.4810010
0%
2 BHK49.7812012
0%

Sun Orbit C Wing

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1.5 BHK39.1412012
0%
1.5 BHK42.7211011
0%
2 BHK48.4918018
0%
2 BHK49.8918018
0%
3 BHK68.39606
0%
3 BHK72.91606
0%

Sun Prime A Wing

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK31.88606
0%
1 BHK32.29808
0%
1 BHK32.82606
0%
1 BHK34.2808
0%
1 BHK34.8316016
0%
1 BHK36.5303
0%
1 BHK36.51909
0%

Sun Shine B Wing

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK37.52606
0%
1 BHK39.47505
0%
1.5 BHK39.1412012
0%
1.5 BHK42.7212012
0%
2 BHK48.4624024
0%
2 BHK49.8824024
0%

Construction Progress

Sun Divine D Wing

Excavation0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

Sun Orbit C Wing

Excavation0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

Sun Prime A Wing

Excavation0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

Sun Shine B Wing

Excavation0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
CallWhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.