📞 +91 98200 30685✉️
RERA: A51800043517

EV 23 MALIBU WEST

by EV HOMES CONSTRUCTIONS PVT LTD Company
Certificate SignedP51700078094

Project Information

RERA Certificate No.
P51700078094
Registration No.
REA51700165678
Registration Date
2024-11-25
Developer
EV HOMES CONSTRUCTIONS PVT LTD Company
Project Bank
ICICI BANK LIMITED
Proposed Possession
2029-12-31
Units Sold
0
Project Area
2457.00 sq.m
Total FSI
14065.72
Approved FSI
12065.72
MahaRERA QR
EV 23 MALIBU WEST
MahaRERA — P51700078094
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors30
Sanctioned30
🏠Habitable24
⬇️Basements3
🚗Open Parking85
🅿️Closed Parking82
📅Completion2029-12-31
🏗️Proposed Floors21
Sanctioned21
🏠Habitable16
⬇️Basements3
🚗Open Parking85
🅿️Closed Parking82
📅Completion2029-12-31

Apartment Configurations

None

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1Bhk37.290000915527344000
0%
2Bhk49.45000076293945000
0%
2Bhk50.36000061035156000
0%
2Bhk55.529998779296875000
0%
2Bhk57.83000183105469000
0%
3Bhk71.2699966430664000
0%
3Bhk77.30000305175781000
0%
Cidco 2 Bhk50.36000061035156000
0%
Nmmc 1 Bhk37.290000915527344000
0%
Rehab 1 Bhk29.739999771118164000
0%
Rehab 1 Bhk29.829999923706055000
0%
Rehab 2 Bhk43.119998931884766000
0%
Rehab 2 Bhk44.81999969482422000
0%

Building 1

TypeCarpet (sq.ft)TotalBookedAvailableStatus
2 BHK55.53303
0%
2 BHK57.8324024
0%
3 BHK71.2721021
0%
3 BHK77.324024
0%

Building 2

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK37.29505
0%
2 BHK49.45202
0%
2 BHK50.36505
0%
CIDCO 2 BHK50.36101
0%
NMMC 1 BHK37.29101
0%
REHAB 1 BHK29.7430030
0%
REHAB 1 BHK29.8310010
0%
REHAB 2 BHK43.1230030
0%
REHAB 2 BHK44.8210010
0%

Construction Progress

Building 1

Basement (if any)0%
Excavation75%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Plinth0%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

Building 2

Basement (if any)0%
Excavation75%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Plinth0%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
CallWhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.