The Chakravarti Ashok Chsl

by Orbit Ventures &Amp; Co.
Kept in AbeyanceP51800004225

Project Information

RERA Certificate No.
P51800004225
Registration No.
REA51800011801
Developer
Orbit Ventures &Amp; Co.
Project Bank
KOTAK MAHINDRA BANK
Proposed Possession
2022-12-31
Revised Possession
2024-12-30
Extended Possession
1900-01-01
Buildings
5
Project Area
7633.10 sq.m
Total FSI
22345.00
Approved FSI
15000.00
MahaRERA QR
The Chakravarti Ashok Chsl
MahaRERA — P51800004225
Scan to verify on MahaRERA portal

Wing-wise Details

⬇️Basements1
🅿️Closed Parking1
📅Completion2023-12-31
⬇️Basements1
🅿️Closed Parking1
📅Completion2023-12-31
⬇️Basements1
🅿️Closed Parking1
📅Completion2023-12-31
⬇️Basements1
🅿️Closed Parking1
📅Completion2023-12-31
⬇️Basements1
🅿️Closed Parking1
📅Completion2023-12-31

Apartment Configurations

Chakravarti Ashok Chsl Building No 2 A Wing

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK82.7211110
9%
2 BHK85.01129
18%
2 BHK100.9612111
8%
3 BHK86.9613013
0%
SHOP49.68101
0%
SHOP80.3101
0%
SHOP91.88101
0%

Chakravarti Ashok Chsl Building No 2 B Wing

TypeCarpet (sq.ft)TotalBookedAvailableStatus
2 BHK79.31129
18%
2 BHK82.7211110
9%
2 BHK85.9513013
0%
3 BHK100.2613013
0%

The Chakravarti Ashok Chsl Building No 2 C Wing

TypeCarpet (sq.ft)TotalBookedAvailableStatus
2 BHK66.13945
44%
2 BHK74.311037
30%
2 BHK81.5212012
0%
3 BHK105.313013
0%

The Chakravarti Ashok Chsl Building No 5

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK46.4438137
3%
1 BHK46.6113013
0%

The Chakravarti Ashok Chsl Builing No 2 D Wing

TypeCarpet (sq.ft)TotalBookedAvailableStatus
3 BHK88.46606
0%
3 BHK97.34202
0%

Construction Progress

Chakravarti Ashok Chsl Building No 2 A Wing

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth75%
X number of Podiums0%
X number of Slabs of Super Structure0%

Chakravarti Ashok Chsl Building No 2 B Wing

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing20%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure0%

The Chakravarti Ashok Chsl Building No 2 C Wing

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure25%

The Chakravarti Ashok Chsl Building No 5

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing41%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure10%

The Chakravarti Ashok Chsl Builing No 2 D Wing

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises7%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure50%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains50%
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
CallWhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.