📞 +91 98200 30685✉️
RERA: A51800043517

Panom Park Phase 1 Wing A B C And C Extension

by Panom Developers Llp Partnership
Certificate SignedP51800005027

Project Information

RERA Certificate No.
P51800005027
Registration No.
REA51800013653
Registration Date
2017-08-09
Developer
Panom Developers Llp Partnership
Architect
Arun Kumar Dube
Project Bank
DBS BANK INDIA LIMITED
Proposed Possession
2019-12-31
Revised Possession
2019-12-31
Extended Possession
1900-01-01
Units Sold
0
Buildings
5
Project Area
2593.05 sq.m
Total FSI
7622.17
Approved FSI
5672.17
MahaRERA QR
Panom Park Phase 1 Wing A B C And C Extension
MahaRERA — P51800005027
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors8
Sanctioned8
📅Completion1900-01-01
🏗️Proposed Floors13
Sanctioned13
⬇️Basements1
📅Completion2019-12-31
🏗️Proposed Floors13
Sanctioned13
⬇️Basements1
📅Completion2019-12-31
🏗️Proposed Floors12
Sanctioned12
📅Completion2019-12-31
🏗️Proposed Floors4
Sanctioned4
📅Completion2019-12-31

Apartment Configurations

None

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 Bhk25.5000
0%
1 Bhk25.700000762939453000
0%
1 Bhk25.8700008392334000
0%
1 Bhk25.8799991607666000
0%
1 Bhk38.959999084472656000
0%
1 Bhk39.22999954223633000
0%
1Bhk39.7400016784668000
0%
Office20.899999618530273000
0%
Proposed Resi Or Com1950.0000
0%
Residential Cum Comm26.0000
0%
Shop7.090000152587891000
0%
Shop7.53000020980835000
0%
Shop10.079999923706055000
0%
Shop11.729999542236328000
0%
Shop11.800000190734863000
0%
Shop14.720000267028809000
0%
Shop20.899999618530273000
0%
Shop21.219999313354492000
0%
Shop25.209999084472656000
0%

Panom Park C Extension Vertical

TypeCarpet (sq.ft)TotalBookedAvailableStatus
PROPOSED RESI OR COM1950.0000
0%

Panom Park Wing A

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK38.9611110
100%
1 BHK39.2311110
100%
1 BHK39.7411110
100%
OFFICE20.9110
100%
SHOP7.09110
100%
SHOP7.53110
100%
SHOP10.08110
100%
SHOP11.8110
100%
SHOP14.72110
100%

Panom Park Wing C Extension H

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK25.5330
100%
1 BHK25.7330
100%
1 BHK25.87330
100%
1 BHK25.88220
100%
RESIDENTIAL CUM COMM26.0110
100%
SHOP11.73110
100%
SHOP20.9110
100%
SHOP21.22101
0%
SHOP25.21101
0%

Construction Progress

PANOM PARK C EXTENSION VERTICAL

Basement (if any)100%

Panom Park C Extension Vertical

Excavation100%

PANOM PARK C EXTENSION VERTICAL

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Panom Park C Extension Vertical

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

PANOM PARK C EXTENSION VERTICAL

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Panom Park C Extension Vertical

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%

PANOM PARK C EXTENSION VERTICAL

Plinth100%
Podiums (if any) 0%

Panom Park C Extension Vertical

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

PANOM PARK C EXTENSION VERTICAL

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Panom Park C Extension Vertical

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

PANOM PARK C EXTENSION VERTICAL

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Panom Park C Extension Vertical

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

PANOM PARK WING A

Basement (if any)100%

Panom Park Wing A

Excavation100%

PANOM PARK WING A

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Panom Park Wing A

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

PANOM PARK WING A

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Panom Park Wing A

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%

PANOM PARK WING A

Plinth100%
Podiums (if any) 0%

Panom Park Wing A

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

PANOM PARK WING A

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Panom Park Wing A

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

PANOM PARK WING A

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Panom Park Wing A

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

PANOM PARK WING B

Basement (if any)100%

Panom Park Wing B

Excavation100%

PANOM PARK WING B

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Panom Park Wing B

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

PANOM PARK WING B

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Panom Park Wing B

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%

PANOM PARK WING B

Plinth100%
Podiums (if any) 0%

Panom Park Wing B

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

PANOM PARK WING B

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Panom Park Wing B

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

PANOM PARK WING B

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Panom Park Wing B

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

PANOM PARK WING C

Basement (if any)100%

Panom Park Wing C

Excavation100%

PANOM PARK WING C

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Panom Park Wing C

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

PANOM PARK WING C

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Panom Park Wing C

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%

PANOM PARK WING C

Plinth100%
Podiums (if any) 0%

Panom Park Wing C

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

PANOM PARK WING C

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Panom Park Wing C

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

PANOM PARK WING C

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Panom Park Wing C

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

PANOM PARK WING C EXTENSION H

Basement (if any)100%

Panom Park Wing C Extension H

Excavation100%

PANOM PARK WING C EXTENSION H

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Panom Park Wing C Extension H

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

PANOM PARK WING C EXTENSION H

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Panom Park Wing C Extension H

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%

PANOM PARK WING C EXTENSION H

Plinth100%
Podiums (if any) 0%

Panom Park Wing C Extension H

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

PANOM PARK WING C EXTENSION H

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Panom Park Wing C Extension H

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

PANOM PARK WING C EXTENSION H

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Panom Park Wing C Extension H

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space100%
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station100%
Energy management100%
Fire Protection And Fire Safety Requirements100%
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)100%
Solid Waste Management And Disposal100%
Storm Water Drains100%
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting100%
Water Supply100%
CallWhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.