Project Information

RERA Certificate No.
P51800007149
Registration No.
REA51800018661
Developer
Sumer Radius Realty Pvt Ltd
Architect
Girish Chaudhari
Project Bank
Yes Bank ltd
Proposed Possession
2022-12-31
Revised Possession
2024-12-30
Extended Possession
1900-01-01
Buildings
6
Project Area
19339.24 sq.m
Total FSI
108952.42
Approved FSI
79284.05
Litigations
⚠️ Yes
MahaRERA QR
Avenue 54
MahaRERA — P51800007149
Scan to verify on MahaRERA portal

Wing-wise Details

🅿️Closed Parking63
📅Completion2023-12-31
⬇️Basements4
🅿️Closed Parking263
📅Completion2023-12-31
⬇️Basements4
🅿️Closed Parking197
📅Completion2023-12-31
⬇️Basements4
🅿️Closed Parking372
📅Completion2023-12-31
⬇️Basements4
🅿️Closed Parking372
📅Completion2023-12-31
⬇️Basements4
🅿️Closed Parking200
📅Completion2023-12-31

Apartment Configurations

Tower 1A

TypeCarpet (sq.ft)TotalBookedAvailableStatus
6 BHK344.8712012
0%

Tower 1B

TypeCarpet (sq.ft)TotalBookedAvailableStatus
4 BHK A194.14101
0%
4 BHK B194.02101
0%
4 BHK C194.0834133
3%
4 BHK D193.8333231
6%

Tower 1C

TypeCarpet (sq.ft)TotalBookedAvailableStatus
4 BHK M196.8101
0%
4.5 BHK225.95101
0%
5.5 BHK A265.2118117
61%

Tower 2

TypeCarpet (sq.ft)TotalBookedAvailableStatus
3 BHK A131.5729218
72%
3 BHK B131.57110
100%
3 BHK C131.57110
100%
4 BHK E203.93202
0%
4 BHK F207.58101
0%
4 BHK G195.21291613
55%
4 BHK H195.21110
100%
4 BHK I195.21110
100%
5 BHK227.52362610
72%

Tower 3

TypeCarpet (sq.ft)TotalBookedAvailableStatus
3 BHK A131.57291910
66%
3 BHK B131.57101
0%
3 BHK C131.57101
0%
4 BHK E203.93202
0%
4 BHK F207.58101
0%
4 BHK G195.21291316
45%
4 BHK H195.21101
0%
4 BHK I195.21110
100%
5 BHK227.52362511
69%

Construction Progress

Tower 1A

Excavation0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

Tower 1B

Excavation5%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

Tower 1C

Excavation5%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

Tower 2

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises1%
Overall Percentage of Completion of the work done For the entire Building /Wing38%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.47%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure32%

Tower 3

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.19%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth75%
X number of Podiums0%
X number of Slabs of Super Structure0%

Tower 4

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing10%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

RERA Registered Amenities

Aggregate area of recreational Open Space
AMPHI THEATRE TIERED SEATING
CLIMBING WALL
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
FOUNTAIN PLAY
Landscaping & Tree Planting
MULTIPURPOSE LAWN
MULTIPURPOSE PATH
Open Parking
OUTDOOR KIDS PLAY AREA WITH PLAY EQUIPMENTS
REFLEXOLOGY PATH
SCULPTURE
SENIOR CITIZEN AREA
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
CallWhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.