S N Sahayog Chsl

by Umang Construction Co
Kept in AbeyanceP51800008921

Project Information

RERA Certificate No.
P51800008921
Registration No.
REA51800012179
Developer
Umang Construction Co
Project Bank
Bank of Baroda
Proposed Possession
2018-03-31
Revised Possession
2022-03-30
Extended Possession
2024-10-15
Buildings
2
Project Area
1005.02 sq.m
Total FSI
4752.90
Approved FSI
850.00
MahaRERA QR
S N Sahayog Chsl
MahaRERA — P51800008921
Scan to verify on MahaRERA portal

Wing-wise Details

🅿️Closed Parking33
📅Completion2021-03-31
📅Completion2022-03-30

Apartment Configurations

S N Sahayog Chsl Phase 1

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK39.0416124
75%
1 BHK39.5230300
100%
1 BHK44.0112102
83%
2 BHK57.5512120
100%
2 BHK57.661284
67%
3 BHK71.18110
100%

S N Sahayog Chsl Phase 2

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK39.041266
50%
1 BHK41.01211
50%
2 BHK52.59110
100%
2 BHK57.59110
100%
2 BHK58.97110
100%

Construction Progress

S N Sahayog Chsl Phase 1

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing100%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

S N Sahayog Chsl Phase 2

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing100%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station100%
Energy management
Fire Protection And Fire Safety Requirements100%
Landscaping & Tree Planting100%
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)100%
Solid Waste Management And Disposal
Storm Water Drains100%
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply100%
CallWhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.