📞 +91 98200 30685✉️
RERA: A51800043517

Mass U-Foria

by Grace Mass Housing Corporation
Kept in AbeyanceP51800012393

Project Information

RERA Certificate No.
P51800012393
Registration No.
REA51800020496
Developer
Grace Mass Housing Corporation
Project Bank
UNION BANK OF INDIA
Proposed Possession
2022-12-31
Revised Possession
2024-12-30
Extended Possession
1900-01-01
Buildings
2
Project Area
3315.90 sq.m
Total FSI
8937.77
MahaRERA QR
Mass U-Foria
MahaRERA — P51800012393
Scan to verify on MahaRERA portal

Wing-wise Details

🅿️Closed Parking27
📅Completion1900-01-01
🅿️Closed Parking27
📅Completion2023-12-31

Apartment Configurations

Mass U Foria Rehab

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 KBH50.040040
0%

Mass U-Foria

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK26.71321
67%
1 BHK26.76312
33%
1 BHK26.85321
67%
1 BHK26.89321
67%
1 BHK26.95202
0%
1 BHK26.96303
0%
1 BHK26.97817
12%
1 BHK27.09330
100%
1 BHK27.2312
33%
1 BHK27.27651
83%
1 BHK27.63321
67%
1 BHK35.63404
0%
1 BHK40.1560852
13%
1 BHK42.34716
14%
1 BHK50.040040
0%
2 BHK52.84716
14%
2 BHK56.711486
57%

Construction Progress

Mass U Foria Rehab

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing10%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

Mass U-Foria

Excavation60%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate30%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises30%
Overall Percentage of Completion of the work done For the entire Building /Wing32%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises10%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.30%
Stilt Floor50%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing30%
X number of Basement(s) and Plinth50%
X number of Podiums0%
X number of Slabs of Super Structure30%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
FITNESS CENTRE10%
Landscaping & Tree Planting
MULTI PURPOSE HALL10%
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)20%
Solid Waste Management And Disposal
Storm Water Drains10%
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply10%
CallWhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.