📞 +91 98200 30685✉️
RERA: A51800043517

Vishwas Niketan By Viiaan

by Somani Buildtech Llp Others
Certificate SignedP51800033151

Project Information

RERA Certificate No.
P51800033151
Registration No.
REA51800099295
Registration Date
2024-04-24
Developer
Somani Buildtech Llp Others
Architect
Suyog R Shet
Project Bank
ICICI BANK LIMITED
Proposed Possession
2024-12-31
Revised Possession
1900-01-01
Extended Possession
2026-12-31
Total Units
48
Units Sold
24 (50%)
Buildings
2
Project Area
885.20 sq.m
Total FSI
2470.36
Approved FSI
2470.36
MahaRERA QR
Vishwas Niketan By Viiaan
MahaRERA — P51800033151
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors10
Sanctioned10
🏠Habitable9
🔢Total Units24
🏡Residential21
🏢Non-Residential3
🚗Open Parking2
🅿️Closed Parking21
📅Completion2024-12-31
🏗️Proposed Floors9
Sanctioned9
🏠Habitable9
🔢Total Units24
🏡Residential24
🚗Open Parking3
🅿️Closed Parking19
📅Completion2024-12-31

Apartment Configurations

Wing A

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK35.76211
50%
1 BHK38.84101
0%
1 BHK39.07101
0%
1 BHK51.52110
100%
1 BHK Rehab38.84202
0%
1 BHK Rehab48.02101
0%
1 BHK Rehab51.52101
0%
2 BHK63.7110
100%
2 BHK63.73220
100%
2 BHK Rehab63.7505
0%
2 BHK Rehab63.73404
0%
Shop 151.19110
100%
Shop 222.3110
100%
Shop 313.38110
100%

Wing B

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK38.34211
50%
1 BHK41.38321
67%
1 BHK41.53220
100%
1 BHK43.36110
100%
1 BHK Rehab35.19101
0%
1 BHK Rehab38.34101
0%
1 BHK Rehab41.53202
0%
2 BHK58.94101
0%
2 BHK63.64110
100%
2 BHK Rehab58.94404
0%
2 BHK Rehab63.64404
0%

Construction Progress

Wing A

Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises75%
Overall Percentage of Completion of the work done For the entire Building /Wing65%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises75%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing50%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

Wing B

Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.10%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.5%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises45%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises5%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Sanitary Fittings within the flats / premises20%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure50%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
CallWhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.