Sahakar Revanta

by Sahakar Builders & Developers Partnership
Certificate SignedP51800051407

Project Information

RERA Certificate No.
P51800051407
Registration No.
REA51800138326
Registration Date
2023-12-01
Developer
Sahakar Builders & Developers Partnership
Architect
Manish Shah
Project Bank
AU SMALL FINANCE BANK LIMITED
Proposed Possession
2026-09-30
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Total Units
158
Units Sold
61 (39%)
Buildings
2
Project Area
2959.40 sq.m
Total FSI
9587.45
Approved FSI
9587.45
MahaRERA QR
Sahakar Revanta
MahaRERA — P51800051407
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors27
Sanctioned27
🏠Habitable23
🔢Total Units78
🏡Residential78
📅Completion2026-09-30
🏗️Proposed Floors28
Sanctioned28
🏠Habitable22
🔢Total Units80
🏡Residential80
📅Completion2026-09-30

Apartment Configurations

A Wing

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK33.2414014
0%
1 BHK33.518018
0%
1 BHK33.7216016
0%
1 BHK33.9216016
0%
1 BHK42.5512012
0%
2 BHK79.15202
0%

B Wing

TypeCarpet (sq.ft)TotalBookedAvailableStatus
2 BHK60.37404
0%
2 BHK63.6513013
0%
2 BHK63.92404
0%
2 BHK64.1115015
0%
2 BHK65.0115015
0%
3 BHK86.713013
0%
3 BHK93.3817017
0%

Construction Progress

A WING

Basement (if any)0%

A Wing

Excavation100%

A WING

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%

A Wing

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

A WING

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%

A Wing

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises15%
Overall Percentage of Completion of the work done For the entire Building /Wing35%

A WING

Plinth100%
Podiums (if any) 0%

A Wing

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

A WING

Sanitary Fittings within the flats / premises90%
Slabs of Super Structure100%

A Wing

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.40%

A WING

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%

A Wing

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing10%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure85%

B WING

Basement (if any)0%

B Wing

Excavation100%

B WING

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%

B Wing

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

B WING

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%

B Wing

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises15%
Overall Percentage of Completion of the work done For the entire Building /Wing35%

B WING

Plinth100%
Podiums (if any) 0%

B Wing

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

B WING

Sanitary Fittings within the flats / premises90%
Slabs of Super Structure100%

B Wing

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.40%

B WING

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%

B Wing

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing10%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure85%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station10%
Energy management
Fire Protection And Fire Safety Requirements10%
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)75%
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
CallWhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.