📞 +91 98200 30685✉️
RERA: A51800043517

Sai Twin Tower

by Shree Sai Enterprises Partnership
Certificate SignedP51800052553

Project Information

RERA Certificate No.
P51800052553
Registration No.
REA51800145108
Registration Date
2024-08-20
Developer
Shree Sai Enterprises Partnership
Architect
Architectural Concept
Project Bank
STATE BANK OF INDIA
Proposed Possession
2027-12-31
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Total Units
112
Units Sold
55 (49%)
Buildings
2
Project Area
1394.70 sq.m
Total FSI
7531.38
Approved FSI
5833.18
MahaRERA QR
Sai Twin Tower
MahaRERA — P51800052553
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors17
Sanctioned17
🏠Habitable17
🔢Total Units76
🏢Non-Residential76
📅Completion2027-12-31
🏗️Proposed Floors19
Sanctioned19
🏠Habitable19
🔢Total Units36
🏡Residential36
📅Completion2027-12-31

Apartment Configurations

None

TypeCarpet (sq.ft)TotalBookedAvailableStatus
Office Space36.38999938964844000
0%
Office Space36.41999816894531000
0%
Office Space36.790000915527344000
0%
Office Space36.81999969482422000
0%
Office Space38.7400016784668000
0%
Office Space38.81999969482422000
0%
Office Space40.40999984741211000
0%
Office Space66.88999938964844000
0%
Office Space74.04000091552734000
0%
Office Space151.33999633789062000
0%
Office Space168.89999389648438000
0%
Office Space224.5399932861328000
0%
Office Space320.2300109863281000
0%
Rehab Exisitingmembe38.369998931884766000
0%
Rehab Exisitngmember42.27000045776367000
0%
Rehab Exisitngmember86.68000030517578000
0%
Rehab Existingmember13.100000381469727000
0%
Rehab Existingmember13.84000015258789000
0%
Rehab Existingmember16.440000534057617000
0%
Rehab Existingmember20.719999313354492000
0%
Rehab Existingmember34.75000
0%
Rehab Existingmember39.47999954223633000
0%
Rehab Existingmember40.880001068115234000
0%
Rehab Existingmember44.59000015258789000
0%
Rehab Existingmember51.369998931884766000
0%
Rehab Existingmember57.040000915527344000
0%
Rehab Existingmember65.87000274658203000
0%
Rehab Existingmember70.51000213623047000
0%
Rehab Existingmember90.94999694824219000
0%
Rehab Existingmember94.0199966430664000
0%

Sai Twin Tower A Wing

TypeCarpet (sq.ft)TotalBookedAvailableStatus
Office space36.391037
30%
Office space36.42110
100%
Office space36.79110
100%
Office space36.821046
40%
Office space38.74220
100%
Office space38.82954
56%
Office space40.411174
64%
Office space66.891174
64%
Office space74.041138
27%
Office space151.34220
100%
Office space168.9220
100%
Office space224.54101
0%
Office space320.23404
0%

Sai Twin Tower B Wing

TypeCarpet (sq.ft)TotalBookedAvailableStatus
Rehab ExisitingMembe38.37110
100%
Rehab ExisitngMember42.27110
100%
Rehab ExisitngMember86.68110
100%
Rehab ExistingMember13.1110
100%
Rehab ExistingMember13.84110
100%
Rehab ExistingMember16.44440
100%
Rehab ExistingMember20.72110
100%
Rehab ExistingMember34.75330
100%
Rehab ExistingMember39.48770
100%
Rehab ExistingMember40.88440
100%
Rehab ExistingMember44.59110
100%
Rehab ExistingMember51.37220
100%
Rehab ExistingMember57.04110
100%
Rehab ExistingMember65.87110
100%
Rehab ExistingMember70.51550
100%
Rehab ExistingMember90.95110
100%
Rehab ExistingMember94.02110
100%

Construction Progress

Sai Twin Tower A Wing

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises15%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure90%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure70%

Sai Twin Tower B Wing

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises30%
Overall Percentage of Completion of the work done For the entire Building /Wing38%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.75%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure75%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Parking Tower
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
CallWhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.