Project Information

RERA Certificate No.
P51800055284
Registration No.
REA51800153313
Registration Date
2024-06-05
Developer
Labhartirealities Partnership
Architect
Pushkar Consultants
Project Bank
SARASWAT COOPERATIVE BANK LIMITED
Proposed Possession
2027-12-31
Total Units
67
Units Sold
13 (19%)
Project Area
3025.90 sq.m
Total FSI
10195.69
Approved FSI
5141.25
MahaRERA QR
Labh Sapphire
MahaRERA — P51800055284
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors9
Sanctioned9
🏠Habitable6
🔢Total Units23
🏡Residential21
🏢Non-Residential2
🅿️Closed Parking64
📅Completion2027-12-31
🏗️Proposed Floors10
Sanctioned10
🏠Habitable7
🔢Total Units21
🏡Residential21
🅿️Closed Parking64
📅Completion2027-12-31
🏗️Proposed Floors10
Sanctioned10
🏠Habitable7
🔢Total Units23
🏡Residential23
🅿️Closed Parking65
📅Completion2027-12-31

Apartment Configurations

None

TypeCarpet (sq.ft)TotalBookedAvailableStatus
2Bhk62.099998474121094000
0%
2Bhk73.12000274658203000
0%
3Bhk105.05999755859375000
0%
4Bhk140.50999450683594000
0%
4Bhk141.8000030517578000
0%
4Bhk149.36000061035156000
0%
Rehab 2Bhk62.099998474121094000
0%
Rehab 2Bhk63.38999938964844000
0%
Rehab 2Bhk65.20999908447266000
0%
Rehab 2Bhk73.12000274658203000
0%
Rehab 3Bhk77.31999969482422000
0%
Rehab 3Bhk77.5999984741211000
0%
Rehab 3Bhk79.06999969482422000
0%
Rehab 3Bhk105.05999755859375000
0%
Rehab 4Bhk127.45999908447266000
0%
Rehab 4Bhk148.22999572753906000
0%
Rehab 4Bhk195.47000122070312000
0%
Rehab Shop63.189998626708984000
0%
Rehab Shop600.7100219726562000
0%

Labh Sapphire - Wing A

TypeCarpet (sq.ft)TotalBookedAvailableStatus
2 BHK73.12101
0%
3 BHK105.06404
0%
Rehab 2BHK62.1321
67%
Rehab 2BHK65.21330
100%
Rehab 2BHK73.12220
100%
Rehab 3BHK77.32440
100%
Rehab 3BHK105.06220
100%
Rehab 4BHK148.23110
100%
Rehab 4BHK195.47110
100%
Rehab Shop63.19110
100%
Rehab Shop600.71101
0%

Labh Sapphire - Wing B

TypeCarpet (sq.ft)TotalBookedAvailableStatus
2 BHK62.1202
0%
4 BHK140.51202
0%
4 BHK141.8303
0%
Rehab 2BHK62.1990
100%
Rehab 2BHK63.39330
100%
Rehab 2BHK65.21110
100%
Rehab 4BHK127.46110
100%

Labh Sapphire - Wing C

TypeCarpet (sq.ft)TotalBookedAvailableStatus
2 BHK73.12101
0%
3 BHK105.06404
0%
4 BHK149.36202
0%
Rehab 2BHK62.1440
100%
Rehab 2BHK65.21211
50%
Rehab 2BHK73.12220
100%
Rehab 3BHK77.6440
100%
Rehab 3BHK79.07440
100%

Construction Progress

LABH SAPPHIRE - WING A

Basement (if any)100%

Labh Sapphire - Wing A

Excavation100%

LABH SAPPHIRE - WING A

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Labh Sapphire - Wing A

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

LABH SAPPHIRE - WING A

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

Labh Sapphire - Wing A

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%

LABH SAPPHIRE - WING A

Plinth100%
Podiums (if any) 50%

Labh Sapphire - Wing A

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

LABH SAPPHIRE - WING A

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%

Labh Sapphire - Wing A

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

LABH SAPPHIRE - WING A

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

Labh Sapphire - Wing A

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

LABH SAPPHIRE - WING B

Basement (if any)100%

Labh Sapphire - Wing B

Excavation100%

LABH SAPPHIRE - WING B

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Labh Sapphire - Wing B

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

LABH SAPPHIRE - WING B

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

Labh Sapphire - Wing B

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%

LABH SAPPHIRE - WING B

Plinth100%
Podiums (if any) 0%

Labh Sapphire - Wing B

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

LABH SAPPHIRE - WING B

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%

Labh Sapphire - Wing B

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

LABH SAPPHIRE - WING B

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

Labh Sapphire - Wing B

Stilt Floor50%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

LABH SAPPHIRE - WING C

Basement (if any)100%

Labh Sapphire - Wing C

Excavation100%

LABH SAPPHIRE - WING C

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Labh Sapphire - Wing C

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

LABH SAPPHIRE - WING C

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

Labh Sapphire - Wing C

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%

LABH SAPPHIRE - WING C

Plinth100%
Podiums (if any) 0%

Labh Sapphire - Wing C

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

LABH SAPPHIRE - WING C

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%

Labh Sapphire - Wing C

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

LABH SAPPHIRE - WING C

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

Labh Sapphire - Wing C

Stilt Floor50%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
CallWhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.