📞 +91 98200 30685✉️
RERA: A51800043517

Krishnaraj Buildcon New Suryadarshan Co Op Hsg. Soc

by Krishnaraj Buildcon Partnership
Certificate SignedP51800077389

Project Information

RERA Certificate No.
P51800077389
Registration No.
REA51800163160
Registration Date
2024-08-13
Developer
Krishnaraj Buildcon Partnership
Architect
Shrikantvichare & Associates
Project Bank
AXIS BANK
Proposed Possession
2027-12-31
Total Units
51
Units Sold
8 (16%)
Project Area
698.70 sq.m
Total FSI
2075.07
Approved FSI
2075.07
MahaRERA QR
Krishnaraj Buildcon New Suryadarshan Co Op Hsg. Soc
MahaRERA — P51800077389
Scan to verify on MahaRERA portal

Wing-wise Details

📅Completion2027-12-31
🅿️Closed Parking33
📅Completion2027-12-31

Apartment Configurations

A Wing

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK37.27505
0%
2 BHK60.28808
0%
Office space99.65101
0%
Shop14.19101
0%
Tenant Flats37.27303
0%
Tenant Shop14.51101
0%
Tenant Shop20.44101
0%
Tenant Shop21.78101
0%

B Wing

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK32.33101
0%
1 BHK32.56202
0%
1 BHK32.58202
0%
Tenant Flat 1BHK26.51101
0%
Tenant Flat 1BHK27.51606
0%
Tenant Flat 1BHK30.87101
0%
Tenant Flat 1BHK32.33303
0%
Tenant Flats 1BHK32.56606
0%
Tenant Flats 1BHK32.58606
0%
Tenant Office25.37101
0%
Tenant Office32.58101
0%

Construction Progress

A WING

Basement (if any)100%

A Wing

Excavation0%

A WING

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

A Wing

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

A WING

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

A Wing

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%

A WING

Plinth100%
Podiums (if any) 0%

A Wing

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

A WING

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure30%

A Wing

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

A WING

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

A Wing

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

B WING

Basement (if any)100%

B Wing

Excavation0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%

B WING

Plinth100%
Podiums (if any) 0%

B Wing

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

B WING

Slabs of Super Structure30%

B Wing

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Compound wall / pavement area
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
CallWhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.