📞 +91 98200 30685✉️
RERA: A51800043517

A. M. Residency

by Alfa Mana Realtors Pvt Ltd Others
Certificate SignedP51900000070

Project Information

RERA Certificate No.
P51900000070
Registration No.
REA51900000375
Registration Date
2017-06-22
Developer
Alfa Mana Realtors Pvt Ltd Others
Project Bank
DCB BANK LIMITED
Proposed Possession
2020-09-29
Revised Possession
2020-09-29
Extended Possession
2024-12-31
Total Units
346
Units Sold
128 (37%)
Buildings
2
Project Area
3653.88 sq.m
Total FSI
15489.60
Approved FSI
13052.25
MahaRERA QR
A. M. Residency
MahaRERA — P51900000070
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors9
Sanctioned9
🔢Total Units237
🏡Residential232
🏢Non-Residential5
🚗Open Parking90
📅Completion2019-09-30
🏗️Proposed Floors9
Sanctioned9
🔢Total Units108
🏡Residential108
🚗Open Parking24
📅Completion2019-09-30

Apartment Configurations

Building No 1

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK31.42651
83%
1 BHK37.22220
100%
2 BHK56.6718144
78%
2 BHK56.98871
88%
2 BHK57.15862
75%
2 BHK57.42972
78%
2 BHK57.45862
75%
2 BHK57.4718171
94%
2 BHK57.51981
89%
3 BHK63.26752
71%
3 BHK63.32660
100%
3 BHK63.51743
57%
DP FLAT31.42303
0%
FITNES CENTRE TENANT56.98101
0%
FITNES CENTRE TENANT57.45101
0%
MHADA FLAT57.15101
0%
MHADA FLAT63.26202
0%
MHADA FLAT63.32303
0%
MHADA FLAT63.51202
0%
PAP FLAT37.22808
0%
REHAB41.9112012
0%
REHAB41.94909
0%
REHAB42.017017
0%
REHAB42.06808
0%
REHAB42.0820020
0%
REHAB42.1417017
0%
REHAB42.217017
0%
REHAB42.29808
0%
TENANT SHOP17.26101
0%
TENANT SHOP69.93101
0%

Building No 2

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK26.4101
0%
1 BHK38.47651
83%
1 BHK38.49110
100%
1 BHK38.94550
100%
1 BHK41.92220
100%
1 BHK42.13972
78%
1 BHK42.46633
50%
1 BHK42.5220
100%
1 BHK42.59413
25%
1 BHK45.31862
75%
1 BHK45.39642
67%
1.5 BHK45.46972
78%
DP FLAT42.13505
0%
DP FLAT42.25404
0%
DP FLAT42.46202
0%
DP FLAT42.59303
0%
MHADA FLAT42.13101
0%
MHADA FLAT42.25101
0%
PAP FLAT38.47404
0%
PAP FLAT38.49505
0%
PAP FLAT41.96101
0%
PAP FLAT42.13707
0%
PAP FLAT42.25101
0%
PAP FLAT42.59101
0%
PAP FLAT45.31202
0%
REHAB FLAT41.96101
0%
REHAB FLAT42.13404
0%
REHAB FLAT42.25101
0%
REHAB FLAT42.46101
0%
REHAB FLAT42.59101
0%

Construction Progress

BUILDING NO 1

Basement (if any)100%

Building No 1

Excavation100%

BUILDING NO 1

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Building No 1

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

BUILDING NO 1

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%

Building No 1

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%

BUILDING NO 1

Plinth100%
Podiums (if any) 0%

Building No 1

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

BUILDING NO 1

Sanitary Fittings within the flats / premises95%
Slabs of Super Structure100%

Building No 1

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

BUILDING NO 1

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%

Building No 1

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

BUILDING NO 2

Basement (if any)100%

Building No 2

Excavation100%

BUILDING NO 2

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Building No 2

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

BUILDING NO 2

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%

Building No 2

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises95%

BUILDING NO 2

Plinth100%
Podiums (if any) 0%

Building No 2

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises95%

BUILDING NO 2

Sanitary Fittings within the flats / premises95%
Slabs of Super Structure100%

Building No 2

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.95%

BUILDING NO 2

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%

Building No 2

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

NA Plot Without Structure

Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor 0%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station90%
Energy management
Fire Protection And Fire Safety Requirements90%
Landscaping & Tree Planting75%
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)75%
Solid Waste Management And Disposal75%
Storm Water Drains90%
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting75%
Water Supply90%
CallWhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.