📞 +91 98200 30685✉️
RERA: A51800043517

Omkar 1973 Worli

by Omkar Realtors And Developers Private Limited Company
Certificate SignedP51900003316

Project Information

RERA Certificate No.
P51900003316
Registration No.
REA51900015422
Registration Date
2021-09-09
Developer
Omkar Realtors And Developers Private Limited Company
Architect
Anand Dhokay
Project Bank
YES BANK
Proposed Possession
2021-12-30
Revised Possession
2021-12-30
Extended Possession
1900-01-01
Units Sold
0
Buildings
2
Project Area
3372.00 sq.m
Total FSI
42410.00
Approved FSI
38200.00
MahaRERA QR
Omkar 1973 Worli
MahaRERA — P51900003316
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors27
Sanctioned27
📅Completion1900-01-01
🏗️Proposed Floors56
Sanctioned56
📅Completion1900-01-01

Apartment Configurations

None

TypeCarpet (sq.ft)TotalBookedAvailableStatus
3 Bhk124.0000
0%
3 Bhk129.0000
0%
3 Bhk134.0000
0%
3 Bhk145.0000
0%
3 Bhk232.0000
0%
4 Bhk200.0000
0%
4 Bhk232.0000
0%
4 Bhk238.0000
0%
4 Bhk258.0000
0%
4 Bhk264.0000
0%
4 Bhk277.0000
0%
4 Bhk Large286.0000
0%
5 Bhk205.0000
0%
5 Bhk287.0000
0%
Duplex 11073.0000
0%
Duplex 2874.0000
0%
Duplex Type 1971.0000
0%
Duplex Type 2876.0000
0%
Duplex Type 31209.0000
0%
Simplex483.0000
0%
Simplex699.0000
0%
Simplex 1581.0000
0%
Simplex 2614.0000
0%
Simplex 3794.0000
0%
Triplex 11978.0000
0%
Triplex 21367.0000
0%
Triplex 31473.0000
0%

Tower 2 54 Pt To 79Th Floor

TypeCarpet (sq.ft)TotalBookedAvailableStatus
5 BHK205.018162
89%
5 BHK287.0990
100%
Duplex 11073.0101
0%
Duplex 2874.0101
0%
Simplex699.0110
100%
Triplex 11978.0101
0%
triplex 21367.0101
0%
Triplex 31473.0101
0%

Tower 3 16Th To 70Th Floor

TypeCarpet (sq.ft)TotalBookedAvailableStatus
3 BHK124.018513
28%
3 BHK129.0321220
38%
3 BHK134.0716
14%
3 BHK145.01046
40%
3 BHK232.0110
100%
4 BHK200.0101
0%
4 BHK232.0633
50%
4 BHK238.0101
0%
4 BHK258.0110
100%
4 BHK264.0532
60%
4 BHK277.0110
100%
4 BHK Large286.0844
50%
Duplex type 1971.0413
25%
Duplex type 2876.0110
100%
Duplex Type 31209.0211
50%
Simplex483.0110
100%
Simplex 1581.0101
0%
Simplex 2614.0202
0%
Simplex 3794.0101
0%

Construction Progress

Tower 2 54 pt to 79th Floor

Basement (if any)100%

Tower 2 54 Pt To 79Th Floor

Excavation100%

Tower 2 54 pt to 79th Floor

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%

Tower 2 54 Pt To 79Th Floor

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate90%

Tower 2 54 pt to 79th Floor

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%

Tower 2 54 Pt To 79Th Floor

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises80%

Tower 2 54 pt to 79th Floor

Plinth100%
Podiums (if any) 0%

Tower 2 54 Pt To 79Th Floor

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises70%

Tower 2 54 pt to 79th Floor

Sanitary Fittings within the flats / premises70%
Slabs of Super Structure67%

Tower 2 54 Pt To 79Th Floor

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.75%

Tower 2 54 pt to 79th Floor

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks75%

Tower 2 54 Pt To 79Th Floor

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing90%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure67%

Tower 3 16th to 70th floor

Basement (if any)100%

Tower 3 16Th To 70Th Floor

Excavation100%

Tower 3 16th to 70th floor

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Tower 3 16Th To 70Th Floor

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

Tower 3 16th to 70th floor

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

Tower 3 16Th To 70Th Floor

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing38%

Tower 3 16th to 70th floor

Plinth100%
Podiums (if any) 100%

Tower 3 16Th To 70Th Floor

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

Tower 3 16th to 70th floor

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure50%

Tower 3 16Th To 70Th Floor

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.30%

Tower 3 16th to 70th floor

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%

Tower 3 16Th To 70Th Floor

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure50%

RERA Registered Amenities

Aggregate area of recreational Open Space
Club House60%
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station50%
Energy management
Fire Protection And Fire Safety Requirements70%
Fitness Centre gym90%
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)70%
Solid Waste Management And Disposal50%
Storm Water Drains70%
Street Lighting
swimming pool childrens play area rock climbing and other amenities70%
Treatment And Disposal Of Sewage And Sullage Water70%
Water Conservation, Rain water Harvesting50%
Water Supply 70%
CallWhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.