📞 +91 98200 30685✉️
RERA: A51800043517

Harbour Heights

by Radius Sumer Developers Private Limited
Kept in AbeyanceP51900004243

Project Information

RERA Certificate No.
P51900004243
Registration No.
REA51900017920
Developer
Radius Sumer Developers Private Limited
Architect
Girish Chaudhari
Project Bank
Standard Chartered Bank
Proposed Possession
2009-12-31
Revised Possession
2026-12-30
Extended Possession
1900-01-01
Buildings
6
Project Area
38881.58 sq.m
Total FSI
267090.48
Approved FSI
201566.81
Litigations
⚠️ Yes
MahaRERA QR
Harbour Heights
MahaRERA — P51900004243
Scan to verify on MahaRERA portal

Wing-wise Details

⬇️Basements4
🅿️Closed Parking501
📅Completion1900-01-01
⬇️Basements4
🅿️Closed Parking180
📅Completion1900-01-01
⬇️Basements4
🅿️Closed Parking633
📅Completion2025-12-31
⬇️Basements4
🅿️Closed Parking609
📅Completion2025-12-31
⬇️Basements4
🅿️Closed Parking608
📅Completion2025-12-31
⬇️Basements4
🅿️Closed Parking633
📅Completion2025-12-31

Apartment Configurations

Retail 1

TypeCarpet (sq.ft)TotalBookedAvailableStatus
Food Court610.63101
0%
Godown 12189.0101
0%
Godown 22451.0101
0%
GYM133.91101
0%
MP HALL 01234.98101
0%
MP HALL 02207.23101
0%
Type A5.93404
0%
Type B6.32909
0%
Type C6.421100110
0%
Type D6.7216016
0%
Type E6.338190819
0%
Type F7.3913013
0%
Type G7.728028
0%
Type H7.8755055
0%
Type I8.01700170
0%
Type J8.383460346
0%
Type K8.7513013
0%
Type L9.3313013
0%
Type M10.5185085
0%
Type N11.1321021
0%
Type O11.9812012
0%
Type P12.4678078
0%
Type Q13.5621021
0%
Type R14.0720020
0%
Type S14.515015
0%
Type T16.2404
0%
Type U16.4813013
0%
Type V18.12101
0%
Type W19.67606
0%
Type X23.3303
0%
Type Y205.24101
0%
Type Z349.38101
0%

Retail 2

TypeCarpet (sq.ft)TotalBookedAvailableStatus
BANQUET 0198.77101
0%
BANQUET 0268.78101
0%
BANQUET 0395.35101
0%
BANQUET 0477.76101
0%
FOOD COURT1242.15101
0%
OFFICE44.25101
0%
Type A5.28606
0%
Type B5.38303
0%
Type C5.5606
0%
Type D6.3511011
0%
Type E6.52303
0%
Type F6.6808
0%
Type G6.72303
0%
Type H6.821010101
0%
Type I6.832380238
0%
Type J7.1404
0%
Type K7.42505
0%
Type L7.7230030
0%
Type M8.3231031
0%
Type N8.92606
0%
Type O8.81404
0%
Type P9.5310010
0%
Type Q9.8317017
0%
Type R10.4312012
0%
Type S11.0212012
0%
Type T11.42101
0%
Type U11.63404
0%
Type V11.88303
0%
Type W12.2213013
0%
Type X12.49404
0%
Type Y13.9101
0%
Type Z20.01101
0%

Tower 2

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK A55.53707
0%
1 BHK B57.09707
0%
1 BHK C57.08909
0%
1 BHK D55.56909
0%
2 BHK A74.46202
0%
2 BHK B72.8928028
0%
2 BHK C74.0532032
0%
2 BHK D75.62808
0%
2 BHK E74.67808
0%
2 BHK F75.8622022
0%
2 BHK G76.1710010
0%
2.5 BHK A89.55202
0%
2.5 BHK B88.1328028
0%
2.5 BHK C89.0732032
0%
2.5 BHK D90.49808
0%
2.5 BHK E89.96808
0%
2.5 BHK F91.3822022
0%
2.5 BHK G91.6610010
0%
3 BHK A107.79707
0%
3 BHK B109.8221021
0%
3 BHK C111.8316016
0%
3 BHK D113.310010
0%
3 BHK DUP88.07505
0%
3 BHK Dup A194.66202
0%
3 BHK Dup B197.85303
0%
3 BHK Dup C202.12202
0%

Tower 3

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK A55.53927
22%
1 BHK B57.09990
100%
1 BHK C57.08725
29%
1 BHK D55.56734
43%
2 BHK A74.46202
0%
2 BHK B72.89281315
46%
2 BHK C74.05321121
34%
2 BHK D75.62853
62%
2 BHK E74.67844
50%
2 BHK F75.8622121
5%
2 BHK G76.1740040
0%
2.5 BHK A89.55202
0%
2.5 BHK B88.13281414
50%
2.5 BHK C89.07321220
38%
2.5 BHK D90.49862
75%
2.5 BHK E89.96826
25%
2.5 BHK F91.3822418
18%
2.5 BHK G91.6640040
0%
3 BHK A107.79770
100%
3 BHK B109.8221138
62%
3 BHK C111.8316313
19%
3 BHK D113.338038
0%
3 BHK Dup A194.66202
0%
3 BHK Dup B197.85303
0%
3 BHK Dup C202.12101
0%

Tower 4

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK C57.08707
0%
1 BHK D55.56707
0%
2 BHK A74.46404
0%
2 BHK B72.8926026
0%
2 BHK C74.0532329
9%
2 BHK D75.62817
12%
2 BHK E74.671055
50%
2 BHK F75.8620020
0%
2 BHK G76.1740040
0%
2.5 BHK A89.55404
0%
2.5 BHK B88.1326323
12%
2.5 BHK C89.0732275
84%
2.5 BHK D90.49835
38%
2.5 BHK E89.9610100
100%
2.5 BHK F91.3820614
30%
2.5 BHK G91.6640040
0%
3 BHK A107.7920020
0%
3 BHK B109.8238038
0%
3 BHK C111.8327324
11%
3 BHK D113.338038
0%

Construction Progress

Retail 1

Excavation92%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.2%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth14%
X number of Podiums0%
X number of Slabs of Super Structure0%

Retail 2

Excavation0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

Tower 1

Excavation85%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth4%
X number of Podiums0%
X number of Slabs of Super Structure0%

Tower 2

Excavation57%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

Tower 3

Excavation42%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

Tower 4

Excavation0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
GYM FITNESS CENTRE
JOGGING TRACK
KIDS OUTDOOR PLAY AREA
KIDS POOL
Landscaping & Tree Planting
MULTIPURPOSE HALL
Open Parking
REFLEXOLOGY TRACK PEBBLE WALK
SENIOR CITIZEN AREA
Sewerage (Chamber, Lines, Septic Tank , STP)
SKATING RINK
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
SWIMMING POOL
TODDLER INDOOR PLAY ROOM
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
CallWhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.