Project Information

RERA Certificate No.
P51900052854
Registration No.
REA51900145964
Registration Date
2024-03-22
Developer
Hi Rock Construction Pvt Ltd Company
Project Bank
BANK OF MAHARASHTRA
Proposed Possession
2026-10-31
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Total Units
74
Units Sold
23 (31%)
Buildings
1
Project Area
576.09 sq.m
Total FSI
3648.65
Approved FSI
3648.65
MahaRERA QR
Kinjal Pride
MahaRERA — P51900052854
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors29
Sanctioned29
🏠Habitable23
🔢Total Units74
🏡Residential69
🏢Non-Residential5
⬇️Basements1
🅿️Closed Parking20
📅Completion2026-10-31

Apartment Configurations

None

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1Bhk000
0%
2 Bhk Rehab41.22999954223633000
0%
2 Bhk Rehab41.349998474121094000
0%
2 Bhk Rehab41.45000076293945000
0%
2Bhk41.54999923706055000
0%
2Bhk63.060001373291016000
0%
2Bhk63.189998626708984000
0%
2Bhk Rehab41.56999969482422000
0%
2Bhk Rehab52.15999984741211000
0%
2Bhk Rehab53.040000915527344000
0%
2Bhk Rehab53.16999816894531000
0%
Shop Rehab24.68000030517578000
0%
Shop Rehab44.97999954223633000
0%
Shop Rehab45.2599983215332000
0%
Shop Rehab46.93000030517578000
0%
Shop Rehab47.0099983215332000
0%

Kinjal Pride

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK000
0%
2 BHK58.79871
88%
2 BHK58.92862
75%
2 BHK REHAB41.2313013
0%
2 BHK REHAB41.3513013
0%
2 BHK REHAB41.45303
0%
2 BHK REHAB41.55101
0%
2 BHK REHAB41.57303
0%
2 BHK REHAB49.99101
0%
2 BHK REHAB50.11101
0%
2 BHK REHAB52.16101
0%
2 BHK REHAB53.04303
0%
2 BHK REHAB53.17303
0%
Shop16.25101
0%
SHOP REHAB24.21101
0%
SHOP REHAB46.33101
0%
SHOP REHAB46.48101
0%
SHOP REHAB47.0101
0%
SHOP REHAB49.65101
0%

Construction Progress

KINJAL PRIDE

Basement (if any)100%

Kinjal Pride

Excavation100%

KINJAL PRIDE

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Kinjal Pride

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

KINJAL PRIDE

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

Kinjal Pride

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing30%

KINJAL PRIDE

Plinth100%
Podiums (if any) 0%

Kinjal Pride

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

KINJAL PRIDE

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure18%

Kinjal Pride

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

KINJAL PRIDE

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

Kinjal Pride

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure0%

KINJAL PRIDE 1

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure18%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor 100%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
CallWhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.