PAVITRADHAM

by PAVITRA GRUH SAHAY LLP Others
Certificate SignedP99000003262

Project Information

RERA Certificate No.
P99000003262
Registration No.
REA99000010473
Registration Date
2017-08-05
Developer
PAVITRA GRUH SAHAY LLP Others
Architect
Ajay Wade And Associates
Project Bank
BANK OF BARODA
Proposed Possession
2018-03-31
Revised Possession
2018-03-31
Extended Possession
2019-03-31
Units Sold
0
Buildings
20
Project Area
19996.78 sq.m
Total FSI
29198.46
Approved FSI
29198.46
MahaRERA QR
PAVITRADHAM
MahaRERA — P99000003262
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors8
Sanctioned8
📅Completion1900-01-01
🏗️Proposed Floors8
Sanctioned8
📅Completion1900-01-01
🏗️Proposed Floors8
Sanctioned8
📅Completion1900-01-01
🏗️Proposed Floors8
Sanctioned8
📅Completion2019-03-31
🏗️Proposed Floors8
Sanctioned8
📅Completion1900-01-01
🏗️Proposed Floors8
Sanctioned8
📅Completion1900-01-01
🏗️Proposed Floors8
Sanctioned8
📅Completion1900-01-01
🏗️Proposed Floors8
Sanctioned8
📅Completion1900-01-01
🏗️Proposed Floors8
Sanctioned8
📅Completion1900-01-01
🏗️Proposed Floors8
Sanctioned8
📅Completion2019-03-31
🏗️Proposed Floors8
Sanctioned8
📅Completion1900-01-01
🏗️Proposed Floors8
Sanctioned8
📅Completion1900-01-01
🏗️Proposed Floors8
Sanctioned8
📅Completion1900-01-01
🏗️Proposed Floors8
Sanctioned8
📅Completion1900-01-01
🏗️Proposed Floors8
Sanctioned8
📅Completion1900-01-01
🏗️Proposed Floors8
Sanctioned8
📅Completion1900-01-01
🏗️Proposed Floors8
Sanctioned8
📅Completion1900-01-01
🏗️Proposed Floors8
Sanctioned8
📅Completion1900-01-01
🏗️Proposed Floors8
Sanctioned8
📅Completion1900-01-01
🏗️Proposed Floors8
Sanctioned8
📅Completion2019-03-31

Apartment Configurations

None

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1Bhk24.149999618530273000
0%
Shop7.429999828338623000
0%
Shop7.989999771118164000
0%
Shop8.359999656677246000
0%
Shop9.199999809265137000
0%
Shop9.569999694824219000
0%
Shop9.9399995803833000
0%
Shop10.5000
0%
Shop10.680000305175781000
0%
Shop10.869999885559082000
0%
Shop10.960000038146973000
0%
Shop11.0600004196167000
0%
Shop11.149999618530273000
0%
Shop11.329999923706055000
0%
Shop11.430000305175781000
0%
Shop11.609999656677246000
0%
Shop11.800000190734863000
0%
Shop12.079999923706055000
0%
Shop12.170000076293945000
0%
Shop12.359999656677246000
0%
Shop12.539999961853027000
0%
Shop12.729999542236328000
0%
Shop12.819999694824219000
0%
Shop13.100000381469727000
0%
Shop13.1899995803833000
0%
Shop13.5600004196167000
0%
Shop14.119999885559082000
0%
Shop14.3100004196167000
0%
Shop14.59000015258789000
0%
Shop14.680000305175781000
0%
Shop15.239999771118164000
0%
Shop15.510000228881836000
0%
Shop15.789999961853027000
0%
Shop17.559999465942383000
0%
Shop18.209999084472656000
0%
Shop18.389999389648438000
0%
Shop18.579999923706055000
0%
Shop18.950000762939453000
0%
Shop19.31999969482422000
0%
Shop19.8799991607666000
0%
Shop22.670000076293945000
0%
Shop25.079999923706055000
0%

Wing 1A

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK24.1563630
100%

Wing 1B

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK24.1558580
100%
SHOP10.87220
100%
SHOP11.61220
100%
SHOP12.08110
100%
SHOP12.73110
100%
SHOP13.19220
100%

Wing 1C

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK24.1529281
97%
SHOP9.2110
100%
SHOP13.19220
100%
SHOP15.24110
100%
SHOP18.21110
100%

Wing 1D

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK24.1543430
100%
SHOP9.57110
100%
SHOP11.15110
100%
SHOP12.36110
100%
SHOP12.54110
100%
SHOP13.19110
100%
SHOP14.31110
100%
SHOP18.39110
100%
SHOP19.32101
0%
SHOP22.67110
100%

Wing 1E

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK24.1559590
100%
SHOP8.36110
100%
SHOP9.57220
100%
SHOP12.54220
100%
SHOP12.73220
100%
SHOP17.56110
100%

Wing 1F

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK24.1558580
100%
SHOP7.99110
100%
SHOP10.5220
100%
SHOP11.15220
100%
SHOP12.54220
100%
SHOP17.56110
100%

Wing 1G

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK24.1559590
100%
SHOP9.57110
100%
SHOP11.33110
100%
SHOP12.54220
100%
SHOP12.73220
100%
SHOP14.31110
100%
SHOP17.56110
100%

Wing 1H

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK24.1563630
100%

Wing 2A

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK24.1559590
100%
SHOP12.73220
100%
SHOP13.1211
50%
SHOP14.12220
100%
SHOP14.68110
100%
SHOP18.95101
0%

Wing 2B

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK24.1558580
100%
SHOP11.06101
0%
SHOP12.17110
100%
SHOP12.73110
100%
SHOP12.82110
100%
SHOP13.56110
100%
SHOP15.51101
0%
SHOP15.79110
100%
SHOP19.88101
0%

Wing 2C

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK24.1547470
100%

Wing 2D

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK24.1543430
100%
SHOP9.94110
100%
SHOP10.5110
100%
SHOP10.68110
100%
SHOP11.61110
100%
SHOP13.19220
100%
SHOP14.31110
100%
SHOP18.21110
100%
SHOP18.58110
100%

Wing 2E

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK24.1559590
100%
SHOP9.94110
100%
SHOP10.96110
100%
SHOP13.1220
100%
SHOP14.59110
100%
SHOP18.21220
100%

Wing 2F

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK24.1558580
100%
SHOP9.94220
100%
SHOP11.61220
100%
SHOP13.19220
100%
SHOP18.21220
100%

Wing 2G

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK24.1547470
100%

Wing 2H

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK24.1559590
100%
SHOP7.43220
100%
SHOP11.43110
100%
SHOP11.8220
100%
SHOP13.1110
100%
SHOP18.21110
100%
SHOP25.08110
100%

Wing 3A

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK24.1563630
100%

Wing 3B

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK24.1563630
100%

Wing 3C

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK24.1563630
100%

Wing 3D

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK24.1563567
89%

Construction Progress

WING 1A

Basement (if any)100%

Wing 1A

Excavation100%

WING 1A

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Wing 1A

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

WING 1A

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Wing 1A

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing100%

WING 1A

Plinth100%
Podiums (if any) 100%

Wing 1A

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

WING 1A

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Wing 1A

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

WING 1A

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Wing 1A

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

WING 1B

Basement (if any)100%

Wing 1B

Excavation100%

WING 1B

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Wing 1B

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

WING 1B

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Wing 1B

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing100%

WING 1B

Plinth100%
Podiums (if any) 100%

Wing 1B

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

WING 1B

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Wing 1B

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

WING 1B

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Wing 1B

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

WING 1C

Basement (if any)100%

Wing 1C

Excavation100%

WING 1C

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Wing 1C

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

WING 1C

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Wing 1C

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing100%

WING 1C

Plinth100%
Podiums (if any) 100%

Wing 1C

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

WING 1C

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Wing 1C

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

WING 1C

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Wing 1C

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

WING 1D

Basement (if any)100%

Wing 1D

Excavation100%

WING 1D

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Wing 1D

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

WING 1D

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Wing 1D

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing100%

WING 1D

Plinth100%
Podiums (if any) 100%

Wing 1D

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

WING 1D

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Wing 1D

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

WING 1D

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Wing 1D

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

WING 1E

Basement (if any)100%

Wing 1E

Excavation100%

WING 1E

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Wing 1E

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

WING 1E

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Wing 1E

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing100%

WING 1E

Plinth100%
Podiums (if any) 100%

Wing 1E

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

WING 1E

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Wing 1E

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

WING 1E

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Wing 1E

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

WING 1F

Basement (if any)100%

Wing 1F

Excavation100%

WING 1F

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Wing 1F

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

WING 1F

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Wing 1F

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing100%

WING 1F

Plinth100%
Podiums (if any) 100%

Wing 1F

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

WING 1F

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Wing 1F

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

WING 1F

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Wing 1F

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

WING 1G

Basement (if any)100%

Wing 1G

Excavation100%

WING 1G

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Wing 1G

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

WING 1G

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Wing 1G

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing100%

WING 1G

Plinth100%
Podiums (if any) 100%

Wing 1G

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

WING 1G

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Wing 1G

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

WING 1G

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Wing 1G

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

WING 1H

Basement (if any)100%

Wing 1H

Excavation100%

WING 1H

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Wing 1H

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

WING 1H

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Wing 1H

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing100%

WING 1H

Plinth100%
Podiums (if any) 100%

Wing 1H

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

WING 1H

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Wing 1H

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

WING 1H

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Wing 1H

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

WING 2A

Basement (if any)100%

Wing 2A

Excavation100%

WING 2A

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Wing 2A

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

WING 2A

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Wing 2A

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing100%

WING 2A

Plinth100%
Podiums (if any) 100%

Wing 2A

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

WING 2A

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Wing 2A

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

WING 2A

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Wing 2A

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

WING 2B

Basement (if any)100%

Wing 2B

Excavation100%

WING 2B

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Wing 2B

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

WING 2B

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Wing 2B

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing100%

WING 2B

Plinth100%
Podiums (if any) 100%

Wing 2B

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

WING 2B

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Wing 2B

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

WING 2B

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Wing 2B

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

WING 2C

Basement (if any)100%

Wing 2C

Excavation100%

WING 2C

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Wing 2C

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

WING 2C

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Wing 2C

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing100%

WING 2C

Plinth100%
Podiums (if any) 100%

Wing 2C

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

WING 2C

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Wing 2C

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

WING 2C

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Wing 2C

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

WING 2D

Basement (if any)100%

Wing 2D

Excavation100%

WING 2D

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Wing 2D

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

WING 2D

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Wing 2D

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing100%

WING 2D

Plinth100%
Podiums (if any) 100%

Wing 2D

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

WING 2D

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Wing 2D

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

WING 2D

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Wing 2D

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

WING 2E

Basement (if any)100%

Wing 2E

Excavation100%

WING 2E

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Wing 2E

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

WING 2E

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Wing 2E

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing100%

WING 2E

Plinth100%
Podiums (if any) 100%

Wing 2E

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

WING 2E

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Wing 2E

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

WING 2E

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Wing 2E

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

WING 2F

Basement (if any)100%

Wing 2F

Excavation100%

WING 2F

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Wing 2F

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

WING 2F

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Wing 2F

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing100%

WING 2F

Plinth100%
Podiums (if any) 100%

Wing 2F

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

WING 2F

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Wing 2F

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

WING 2F

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Wing 2F

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

WING 2G

Basement (if any)100%

Wing 2G

Excavation100%

WING 2G

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Wing 2G

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

WING 2G

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Wing 2G

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing100%

WING 2G

Plinth100%
Podiums (if any) 100%

Wing 2G

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

WING 2G

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Wing 2G

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

WING 2G

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Wing 2G

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

WING 2H

Basement (if any)100%

Wing 2H

Excavation100%

WING 2H

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Wing 2H

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

WING 2H

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Wing 2H

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing100%

WING 2H

Plinth100%
Podiums (if any) 100%

Wing 2H

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

WING 2H

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Wing 2H

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

WING 2H

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Wing 2H

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

WING 3A

Basement (if any)100%

Wing 3A

Excavation100%

WING 3A

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Wing 3A

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

WING 3A

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Wing 3A

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing100%

WING 3A

Plinth100%
Podiums (if any) 100%

Wing 3A

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

WING 3A

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Wing 3A

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

WING 3A

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Wing 3A

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

WING 3B

Basement (if any)100%

Wing 3B

Excavation100%

WING 3B

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Wing 3B

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

WING 3B

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Wing 3B

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing100%

WING 3B

Plinth100%
Podiums (if any) 100%

Wing 3B

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

WING 3B

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Wing 3B

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

WING 3B

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Wing 3B

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

WING 3C

Basement (if any)100%

Wing 3C

Excavation100%

WING 3C

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Wing 3C

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

WING 3C

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Wing 3C

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing100%

WING 3C

Plinth100%
Podiums (if any) 100%

Wing 3C

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

WING 3C

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Wing 3C

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

WING 3C

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Wing 3C

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

WING 3D

Basement (if any)100%

Wing 3D

Excavation100%

WING 3D

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Wing 3D

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

WING 3D

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Wing 3D

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing100%

WING 3D

Plinth100%
Podiums (if any) 100%

Wing 3D

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

WING 3D

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Wing 3D

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

WING 3D

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Wing 3D

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station100%
Energy management
Fire Protection And Fire Safety Requirements100%
Landscaping & Tree Planting100%
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)100%
Solid Waste Management And Disposal100%
Storm Water Drains100%
Street Lighting100%
Treatment And Disposal Of Sewage And Sullage Water100%
Water Conservation, Rain water Harvesting100%
Water Supply50%
CallWhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.