Proposed Possession
2020-07-31
Revised Possession
2024-07-27
Extended Possession
1900-01-01
Buildings
2
Project Area
7080.00 sq.m
Total FSI
6862.07
Approved FSI
2900.00
MahaRERA QR
Gopi Kisan Patil Complex
MahaRERA — P99000006071
Scan to verify on MahaRERA portal

Wing-wise Details

🚗Open Parking2
🅿️Closed Parking44
📅Completion1900-01-01
📅Completion1900-01-01

Apartment Configurations

Gopi Kisan Patil Complex A And B Wing

TypeCarpet (sq.ft)TotalBookedAvailableStatus
A WING37.32321
67%
A WING37.59330
100%
A WING37.67835
38%
A WING52.54752
71%
A WING52.87725
29%
A WING52.89734
43%
A WING54.27752
71%
B WING52.72761
86%
B WING52.8814131
93%
B WING52.9114113
79%
B WING54.3743
57%

Gopi Kisan Patil Complex Proposed

TypeCarpet (sq.ft)TotalBookedAvailableStatus
0000
0%

Construction Progress

Gopi Kisan Patil Complex A And B Wing

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate20%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises90%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises25%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

Gopi Kisan Patil Complex Proposed

Excavation0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

RERA Registered Amenities

Aggregate area of recreational Open Space15%
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station50%
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting50%
Open Parking2%
Sewerage (Chamber, Lines, Septic Tank , STP)50%
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
CallWhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.