RERA: A51800043517

BHAKTI HOME ROYALS

by Jayantilal Dharamshibhai Parmar Individual
Certificate SignedP99000011844

Project Information

RERA Certificate No.
P99000011844
Registration No.
REA99000019499
Registration Date
2017-08-31
Developer
Jayantilal Dharamshibhai Parmar Individual
Architect
Encon
Project Bank
IDBI BANK
Proposed Possession
2019-12-31
Revised Possession
2019-12-31
Extended Possession
2025-12-31
Units Sold
0
Buildings
36
Project Area
7010.00 sq.m
Total FSI
7010.00
Approved FSI
3994.74
MahaRERA QR
BHAKTI HOME ROYALS
MahaRERA — P99000011844
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors3
Sanctioned3
🅿️Closed Parking1
📅Completion2019-12-31
🏗️Proposed Floors3
Sanctioned3
🅿️Closed Parking1
📅Completion2021-12-30
🏗️Proposed Floors3
Sanctioned3
🚗Open Parking4
🅿️Closed Parking1
📅Completion2021-12-30
🏗️Proposed Floors2
Sanctioned2
📅Completion1900-01-01
🏗️Proposed Floors2
Sanctioned2
📅Completion1900-01-01
🏗️Proposed Floors3
Sanctioned3
📅Completion1900-01-01
🏗️Proposed Floors3
Sanctioned3
📅Completion2019-12-31
🏗️Proposed Floors3
Sanctioned3
🅿️Closed Parking1
📅Completion2019-12-31
🏗️Proposed Floors3
Sanctioned3
🅿️Closed Parking1
📅Completion2019-12-31
🏗️Proposed Floors3
Sanctioned3
🅿️Closed Parking1
📅Completion2019-12-31
🏗️Proposed Floors3
Sanctioned3
🅿️Closed Parking1
📅Completion2021-12-30
🏗️Proposed Floors3
Sanctioned3
🅿️Closed Parking1
📅Completion2019-12-31
🏗️Proposed Floors3
Sanctioned3
🅿️Closed Parking1
📅Completion2019-12-31
🏗️Proposed Floors3
Sanctioned3
🅿️Closed Parking1
📅Completion2019-12-31
🏗️Proposed Floors3
Sanctioned3
🅿️Closed Parking1
📅Completion2021-06-30
🏗️Proposed Floors3
Sanctioned3
🅿️Closed Parking1
📅Completion2021-06-30
🏗️Proposed Floors3
Sanctioned3
🅿️Closed Parking1
📅Completion2019-12-31
🏗️Proposed Floors3
Sanctioned3
🅿️Closed Parking1
📅Completion2021-12-30
🏗️Proposed Floors3
Sanctioned3
🅿️Closed Parking1
📅Completion2019-12-31
🏗️Proposed Floors3
Sanctioned3
🅿️Closed Parking1
📅Completion2019-12-31
🏗️Proposed Floors3
Sanctioned3
🅿️Closed Parking1
📅Completion2021-06-30
🏗️Proposed Floors3
Sanctioned3
🅿️Closed Parking1
📅Completion2019-12-31
🏗️Proposed Floors3
Sanctioned3
🅿️Closed Parking1
📅Completion2021-06-30
🏗️Proposed Floors3
Sanctioned3
🅿️Closed Parking1
📅Completion2021-12-30
🏗️Proposed Floors3
Sanctioned3
🅿️Closed Parking1
📅Completion2021-12-30
🏗️Proposed Floors3
Sanctioned3
🅿️Closed Parking1
📅Completion2021-06-30
🏗️Proposed Floors3
Sanctioned3
🅿️Closed Parking1
📅Completion2019-12-31
🏗️Proposed Floors3
Sanctioned3
🅿️Closed Parking1
📅Completion2019-12-31
🏗️Proposed Floors3
Sanctioned3
🅿️Closed Parking1
📅Completion2019-12-31
🏗️Proposed Floors3
Sanctioned3
🅿️Closed Parking1
📅Completion2019-12-31
🏗️Proposed Floors3
Sanctioned3
🅿️Closed Parking1
📅Completion2019-12-31
🏗️Proposed Floors3
Sanctioned3
🅿️Closed Parking1
📅Completion2019-12-31
🏗️Proposed Floors3
Sanctioned3
🅿️Closed Parking1
📅Completion2019-12-31
🏗️Proposed Floors3
Sanctioned3
🅿️Closed Parking1
📅Completion2019-12-31
🏗️Proposed Floors3
Sanctioned3
🅿️Closed Parking1
📅Completion2019-12-31
🏗️Proposed Floors3
Sanctioned3
🅿️Closed Parking1
📅Completion2019-12-31

Apartment Configurations

None

TypeCarpet (sq.ft)TotalBookedAvailableStatus
2Bhk58.52000045776367000
0%
3Bhk104.58999633789062000
0%
3Bhk104.79000091552734000
0%
Building No 1236.33999633789062000
0%
Bungalow58.52000045776367000
0%
Bungalow104.79000091552734000
0%
Bungalow 2194.08999633789062000
0%
Bungalow No 1101.69999694824219000
0%
Cfc194.8300018310547000
0%
Club House 195.63999938964844000
0%
Club House 228.43000030517578000
0%
Holiay Homehotel390.5199890136719000
0%
Rouse House 10And4058.52000045776367000
0%
Row Hosue 14 And 15117.04000091552734000
0%
Row House 1 And 3158.52000045776367000
0%
Row House 12 And 13117.04000091552734000
0%
Row House 1658.52000045776367000
0%
Row House 1758.52000045776367000
0%
Row House 1858.52000045776367000
0%
Row House 1958.52000045776367000
0%
Row House 2 And 3258.52000045776367000
0%
Row House 2058.52000045776367000
0%
Row House 2158.52000045776367000
0%
Row House 2258.52000045776367000
0%
Row House 2358.52000045776367000
0%
Row House 2558.52000045776367000
0%
Row House 2658.52000045776367000
0%
Row House 2758.52000045776367000
0%
Row House 2858.52000045776367000
0%
Row House 3 And 3358.52000045776367000
0%
Row House 4 And 3458.52000045776367000
0%
Row House 5 And 3558.52000045776367000
0%
Row House 8 And 3858.52000045776367000
0%
Row House 9 And 3958.52000045776367000
0%

Bungalow 1

TypeCarpet (sq.ft)TotalBookedAvailableStatus
BUNGALOW NO 1101.7110
100%

Bungalow 2

TypeCarpet (sq.ft)TotalBookedAvailableStatus
BUNGALOW 2194.09101
0%

Cfc

TypeCarpet (sq.ft)TotalBookedAvailableStatus
CFC194.83101
0%

Club House 1

TypeCarpet (sq.ft)TotalBookedAvailableStatus
CLUB HOUSE 195.64000
0%

Club House 2

TypeCarpet (sq.ft)TotalBookedAvailableStatus
CLUB HOUSE 228.43000
0%

Club House 3

TypeCarpet (sq.ft)TotalBookedAvailableStatus
BUILDING NO 1236.34000
0%

Holiday Hoe/Hotel

TypeCarpet (sq.ft)TotalBookedAvailableStatus
Holiay HomeHotel390.52101
0%

Row House 1 And 31

TypeCarpet (sq.ft)TotalBookedAvailableStatus
ROW HOUSE 1 AND 3158.52220
100%

Row House 10 And 40

TypeCarpet (sq.ft)TotalBookedAvailableStatus
ROUSE HOUSE 10AND4058.52220
100%

Row House 11 And 41

TypeCarpet (sq.ft)TotalBookedAvailableStatus
Bungalow58.52220
100%

Row House 12 And 13

TypeCarpet (sq.ft)TotalBookedAvailableStatus
ROW HOUSE 12 AND 13117.04211
50%

Row House 14 And 15

TypeCarpet (sq.ft)TotalBookedAvailableStatus
ROW HOSUE 14 AND 15117.04211
50%

Row House 16

TypeCarpet (sq.ft)TotalBookedAvailableStatus
ROW HOUSE 1658.52110
100%

Row House 17

TypeCarpet (sq.ft)TotalBookedAvailableStatus
ROW HOUSE 1758.52110
100%

Row House 18

TypeCarpet (sq.ft)TotalBookedAvailableStatus
ROW HOUSE 1858.52110
100%

Row House 19

TypeCarpet (sq.ft)TotalBookedAvailableStatus
ROW HOUSE 1958.52110
100%

Row House 2 And 32

TypeCarpet (sq.ft)TotalBookedAvailableStatus
ROW HOUSE 2 AND 3258.52211
50%

Row House 20

TypeCarpet (sq.ft)TotalBookedAvailableStatus
ROW HOUSE 2058.52110
100%

Row House 21

TypeCarpet (sq.ft)TotalBookedAvailableStatus
ROW HOUSE 2158.52110
100%

Row House 22

TypeCarpet (sq.ft)TotalBookedAvailableStatus
ROW HOUSE 2258.52110
100%

Row House 23

TypeCarpet (sq.ft)TotalBookedAvailableStatus
ROW HOUSE 2358.52110
100%

Row House 24

TypeCarpet (sq.ft)TotalBookedAvailableStatus
Bungalow58.52110
100%

Row House 25

TypeCarpet (sq.ft)TotalBookedAvailableStatus
ROW HOUSE 2558.52110
100%

Row House 26

TypeCarpet (sq.ft)TotalBookedAvailableStatus
ROW HOUSE 2658.52101
0%

Row House 27

TypeCarpet (sq.ft)TotalBookedAvailableStatus
ROW HOUSE 2758.52110
100%

Row House 28

TypeCarpet (sq.ft)TotalBookedAvailableStatus
ROW HOUSE 2858.52101
0%

Row House 29

TypeCarpet (sq.ft)TotalBookedAvailableStatus
Bungalow104.79110
100%

Row House 3 And 33

TypeCarpet (sq.ft)TotalBookedAvailableStatus
ROW HOUSE 3 AND 3358.52220
100%

Row House 30

TypeCarpet (sq.ft)TotalBookedAvailableStatus
3 BHK104.79110
100%

Row House 4 And 34

TypeCarpet (sq.ft)TotalBookedAvailableStatus
ROW HOUSE 4 AND 3458.52211
50%

Row House 42 And 43

TypeCarpet (sq.ft)TotalBookedAvailableStatus
3 BHK104.59211
50%

Row House 5 And 35

TypeCarpet (sq.ft)TotalBookedAvailableStatus
ROW HOUSE 5 AND 3558.52211
50%

Row House 6 And 36

TypeCarpet (sq.ft)TotalBookedAvailableStatus
2 BHK58.52211
50%

Row House 7 And 37

TypeCarpet (sq.ft)TotalBookedAvailableStatus
2 BHK58.52211
50%

Row House 8 And 38

TypeCarpet (sq.ft)TotalBookedAvailableStatus
ROW HOUSE 8 AND 3858.52211
50%

Row House 9 And 39

TypeCarpet (sq.ft)TotalBookedAvailableStatus
ROW HOUSE 9 AND 3958.52211
50%

Construction Progress

BUNGALOW 1

Basement (if any)100%

Bungalow 1

Excavation100%

BUNGALOW 1

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Bungalow 1

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

BUNGALOW 1

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Bungalow 1

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%

BUNGALOW 1

Plinth100%
Podiums (if any) 100%

Bungalow 1

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises1%

BUNGALOW 1

Sanitary Fittings within the flats / premises1%
Slabs of Super Structure100%

Bungalow 1

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

BUNGALOW 1

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Bungalow 1

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

BUNGALOW 2

Basement (if any)0%

Bungalow 2

Excavation0%

BUNGALOW 2

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Bungalow 2

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

BUNGALOW 2

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

Bungalow 2

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%

BUNGALOW 2

Plinth0%
Podiums (if any) 0%

Bungalow 2

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

BUNGALOW 2

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%

Bungalow 2

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

BUNGALOW 2

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

Bungalow 2

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

CFC

Basement (if any)100%

Cfc

Excavation100%

CFC

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%

Cfc

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate50%

CFC

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises75%

Cfc

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises75%

CFC

Plinth100%
Podiums (if any) 0%

Cfc

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises50%

CFC

Sanitary Fittings within the flats / premises50%
Slabs of Super Structure100%

Cfc

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.50%

CFC

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%

Cfc

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing50%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

CLUB HOUSE 1

Basement (if any)100%

Club House 1

Excavation100%

CLUB HOUSE 1

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Club House 1

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate50%

CLUB HOUSE 1

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Club House 1

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing75%

CLUB HOUSE 1

Plinth100%
Podiums (if any) 0%

Club House 1

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

CLUB HOUSE 1

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Club House 1

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

CLUB HOUSE 1

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Club House 1

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

CLUB HOUSE 2

Basement (if any)100%

Club House 2

Excavation100%

CLUB HOUSE 2

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Club House 2

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate50%

CLUB HOUSE 2

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Club House 2

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing75%

CLUB HOUSE 2

Plinth100%
Podiums (if any) 0%

Club House 2

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

CLUB HOUSE 2

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Club House 2

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

CLUB HOUSE 2

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Club House 2

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

CLUB HOUSE 3

Basement (if any)0%

Club House 3

Excavation0%

CLUB HOUSE 3

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Club House 3

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

CLUB HOUSE 3

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

Club House 3

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%

CLUB HOUSE 3

Plinth0%
Podiums (if any) 0%

Club House 3

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

CLUB HOUSE 3

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%

Club House 3

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

CLUB HOUSE 3

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

Club House 3

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

Holiday Hoe/Hotel

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate30%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.30%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises95%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises90%
Sanitary Fittings within the flats / premises90%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing80%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

ROW HOUSE 1 AND 31

Basement (if any)100%

Row House 1 And 31

Excavation100%

ROW HOUSE 1 AND 31

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Row House 1 And 31

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

ROW HOUSE 1 AND 31

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises35%

Row House 1 And 31

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises35%

ROW HOUSE 1 AND 31

Plinth100%
Podiums (if any) 0%

Row House 1 And 31

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises35%

ROW HOUSE 1 AND 31

Sanitary Fittings within the flats / premises35%
Slabs of Super Structure75%

Row House 1 And 31

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.70%

ROW HOUSE 1 AND 31

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks70%

Row House 1 And 31

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure75%

ROW HOUSE 10 AND 40

Basement (if any)100%

Row House 10 And 40

Excavation100%

ROW HOUSE 10 AND 40

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%

Row House 10 And 40

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate30%

ROW HOUSE 10 AND 40

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.30%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%

Row House 10 And 40

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises95%

ROW HOUSE 10 AND 40

Plinth100%
Podiums (if any) 0%

Row House 10 And 40

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises90%

ROW HOUSE 10 AND 40

Sanitary Fittings within the flats / premises90%
Slabs of Super Structure100%

Row House 10 And 40

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.90%

ROW HOUSE 10 AND 40

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%

Row House 10 And 40

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing80%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

ROW HOUSE 11 AND 41

Basement (if any)100%

Row House 11 And 41

Excavation100%

ROW HOUSE 11 AND 41

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%

Row House 11 And 41

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate30%

ROW HOUSE 11 AND 41

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.30%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%

Row House 11 And 41

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises95%

ROW HOUSE 11 AND 41

Plinth100%
Podiums (if any) 0%

Row House 11 And 41

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises90%

ROW HOUSE 11 AND 41

Sanitary Fittings within the flats / premises90%
Slabs of Super Structure100%

Row House 11 And 41

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.90%

ROW HOUSE 11 AND 41

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%

Row House 11 And 41

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing80%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

ROW HOUSE 12 AND 13

Basement (if any)100%

Row House 12 And 13

Excavation100%

ROW HOUSE 12 AND 13

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%

Row House 12 And 13

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate30%

ROW HOUSE 12 AND 13

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.30%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises75%

Row House 12 And 13

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises75%

ROW HOUSE 12 AND 13

Plinth100%
Podiums (if any) 0%

Row House 12 And 13

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises60%

ROW HOUSE 12 AND 13

Sanitary Fittings within the flats / premises60%
Slabs of Super Structure100%

Row House 12 And 13

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.80%

ROW HOUSE 12 AND 13

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%

Row House 12 And 13

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing80%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

ROW HOUSE 14 AND 15

Basement (if any)100%

Row House 14 And 15

Excavation100%

ROW HOUSE 14 AND 15

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%

Row House 14 And 15

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate30%

ROW HOUSE 14 AND 15

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.30%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%

Row House 14 And 15

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises95%

ROW HOUSE 14 AND 15

Plinth100%
Podiums (if any) 0%

Row House 14 And 15

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises90%

ROW HOUSE 14 AND 15

Sanitary Fittings within the flats / premises90%
Slabs of Super Structure100%

Row House 14 And 15

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.90%

ROW HOUSE 14 AND 15

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%

Row House 14 And 15

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing80%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

ROW HOUSE 16

Basement (if any)100%

Row House 16

Excavation100%

ROW HOUSE 16

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%

Row House 16

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate30%

ROW HOUSE 16

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.30%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%

Row House 16

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises95%

ROW HOUSE 16

Plinth100%
Podiums (if any) 0%

Row House 16

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises90%

ROW HOUSE 16

Sanitary Fittings within the flats / premises90%
Slabs of Super Structure100%

Row House 16

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.90%

ROW HOUSE 16

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%

Row House 16

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing80%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

ROW HOUSE 17

Basement (if any)100%

Row House 17

Excavation100%

ROW HOUSE 17

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%

Row House 17

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate30%

ROW HOUSE 17

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.30%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%

Row House 17

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises95%

ROW HOUSE 17

Plinth100%
Podiums (if any) 0%

Row House 17

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises90%

ROW HOUSE 17

Sanitary Fittings within the flats / premises90%
Slabs of Super Structure100%

Row House 17

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.90%

ROW HOUSE 17

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%

Row House 17

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing80%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

ROW HOUSE 18

Basement (if any)100%

Row House 18

Excavation100%

ROW HOUSE 18

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%

Row House 18

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate30%

ROW HOUSE 18

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.30%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%

Row House 18

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises95%

ROW HOUSE 18

Plinth100%
Podiums (if any) 0%

Row House 18

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises90%

ROW HOUSE 18

Sanitary Fittings within the flats / premises90%
Slabs of Super Structure100%

Row House 18

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.90%

ROW HOUSE 18

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%

Row House 18

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing80%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

ROW HOUSE 19

Basement (if any)100%

Row House 19

Excavation100%

ROW HOUSE 19

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%

Row House 19

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate30%

ROW HOUSE 19

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.30%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%

Row House 19

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises95%

ROW HOUSE 19

Plinth100%
Podiums (if any) 0%

Row House 19

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises90%

ROW HOUSE 19

Sanitary Fittings within the flats / premises90%
Slabs of Super Structure100%

Row House 19

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.90%

ROW HOUSE 19

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%

Row House 19

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing80%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

ROW HOUSE 2 AND 32

Basement (if any)100%

Row House 2 And 32

Excavation100%

ROW HOUSE 2 AND 32

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Row House 2 And 32

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

ROW HOUSE 2 AND 32

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises35%

Row House 2 And 32

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises35%
Overall Percentage of Completion of the work done For the entire Building /Wing54%

ROW HOUSE 2 AND 32

Plinth100%
Podiums (if any) 0%

Row House 2 And 32

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises35%

ROW HOUSE 2 AND 32

Sanitary Fittings within the flats / premises35%
Slabs of Super Structure100%

Row House 2 And 32

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.70%

ROW HOUSE 2 AND 32

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks70%

Row House 2 And 32

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

ROW HOUSE 20

Basement (if any)100%

Row House 20

Excavation100%

ROW HOUSE 20

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%

Row House 20

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate30%

ROW HOUSE 20

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.30%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%

Row House 20

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises95%

ROW HOUSE 20

Plinth100%
Podiums (if any) 0%

Row House 20

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises90%

ROW HOUSE 20

Sanitary Fittings within the flats / premises90%
Slabs of Super Structure100%

Row House 20

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.90%

ROW HOUSE 20

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%

Row House 20

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing80%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

ROW HOUSE 21

Basement (if any)100%

Row House 21

Excavation100%

ROW HOUSE 21

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%

Row House 21

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate50%

ROW HOUSE 21

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%

Row House 21

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises95%

ROW HOUSE 21

Plinth100%
Podiums (if any) 0%

Row House 21

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises90%

ROW HOUSE 21

Sanitary Fittings within the flats / premises90%
Slabs of Super Structure100%

Row House 21

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.90%

ROW HOUSE 21

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%

Row House 21

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing90%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

ROW HOUSE 22

Basement (if any)100%

Row House 22

Excavation100%

ROW HOUSE 22

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%

Row House 22

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate50%

ROW HOUSE 22

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%

Row House 22

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises95%

ROW HOUSE 22

Plinth100%
Podiums (if any) 0%

Row House 22

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises90%

ROW HOUSE 22

Sanitary Fittings within the flats / premises90%
Slabs of Super Structure100%

Row House 22

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.90%

ROW HOUSE 22

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%

Row House 22

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing90%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

ROW HOUSE 23

Basement (if any)100%

Row House 23

Excavation100%

ROW HOUSE 23

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%

Row House 23

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate50%

ROW HOUSE 23

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%

Row House 23

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises95%

ROW HOUSE 23

Plinth100%
Podiums (if any) 0%

Row House 23

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises90%

ROW HOUSE 23

Sanitary Fittings within the flats / premises90%
Slabs of Super Structure100%

Row House 23

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.90%

ROW HOUSE 23

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%

Row House 23

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing80%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

ROW HOUSE 24

Basement (if any)100%

Row House 24

Excavation100%

ROW HOUSE 24

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%

Row House 24

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate50%

ROW HOUSE 24

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%

Row House 24

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises95%

ROW HOUSE 24

Plinth100%
Podiums (if any) 0%

Row House 24

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises90%

ROW HOUSE 24

Sanitary Fittings within the flats / premises90%
Slabs of Super Structure100%

Row House 24

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.90%

ROW HOUSE 24

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%

Row House 24

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing80%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

ROW HOUSE 25

Basement (if any)100%

Row House 25

Excavation100%

ROW HOUSE 25

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%

Row House 25

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate50%

ROW HOUSE 25

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%

Row House 25

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises95%

ROW HOUSE 25

Plinth100%
Podiums (if any) 0%

Row House 25

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises90%

ROW HOUSE 25

Sanitary Fittings within the flats / premises90%
Slabs of Super Structure100%

Row House 25

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.90%

ROW HOUSE 25

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%

Row House 25

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing80%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

ROW HOUSE 26

Basement (if any)100%

Row House 26

Excavation100%

ROW HOUSE 26

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%

Row House 26

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate50%

ROW HOUSE 26

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%

Row House 26

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises95%

ROW HOUSE 26

Plinth100%
Podiums (if any) 0%

Row House 26

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises90%

ROW HOUSE 26

Sanitary Fittings within the flats / premises90%
Slabs of Super Structure100%

Row House 26

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.90%

ROW HOUSE 26

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%

Row House 26

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing80%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

ROW HOUSE 27

Basement (if any)100%

Row House 27

Excavation100%

ROW HOUSE 27

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Row House 27

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

ROW HOUSE 27

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

Row House 27

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing35%

ROW HOUSE 27

Plinth100%
Podiums (if any) 0%

Row House 27

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

ROW HOUSE 27

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure50%

Row House 27

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

ROW HOUSE 27

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

Row House 27

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure50%

ROW HOUSE 28

Basement (if any)100%

Row House 28

Excavation100%

ROW HOUSE 28

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Row House 28

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

ROW HOUSE 28

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

Row House 28

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing35%

ROW HOUSE 28

Plinth100%
Podiums (if any) 0%

Row House 28

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

ROW HOUSE 28

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure50%

Row House 28

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

ROW HOUSE 28

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

Row House 28

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure50%

ROW HOUSE 29

Basement (if any)100%

Row House 29

Excavation100%

ROW HOUSE 29

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Row House 29

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

ROW HOUSE 29

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises20%

Row House 29

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises20%
Overall Percentage of Completion of the work done For the entire Building /Wing42%

ROW HOUSE 29

Plinth100%
Podiums (if any) 0%

Row House 29

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

ROW HOUSE 29

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%

Row House 29

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

ROW HOUSE 29

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

Row House 29

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

ROW HOUSE 3 AND 33

Basement (if any)100%

Row House 3 And 33

Excavation100%

ROW HOUSE 3 AND 33

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Row House 3 And 33

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

ROW HOUSE 3 AND 33

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises35%

Row House 3 And 33

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises35%
Overall Percentage of Completion of the work done For the entire Building /Wing54%

ROW HOUSE 3 AND 33

Plinth100%
Podiums (if any) 0%

Row House 3 And 33

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises35%

ROW HOUSE 3 AND 33

Sanitary Fittings within the flats / premises35%
Slabs of Super Structure100%

Row House 3 And 33

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.70%

ROW HOUSE 3 AND 33

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks70%

Row House 3 And 33

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

ROW HOUSE 30

Basement (if any)100%

Row House 30

Excavation100%

ROW HOUSE 30

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Row House 30

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

ROW HOUSE 30

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises20%

Row House 30

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises20%
Overall Percentage of Completion of the work done For the entire Building /Wing42%

ROW HOUSE 30

Plinth100%
Podiums (if any) 0%

Row House 30

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

ROW HOUSE 30

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%

Row House 30

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

ROW HOUSE 30

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

Row House 30

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

ROW HOUSE 4 AND 34

Basement (if any)100%

Row House 4 And 34

Excavation100%

ROW HOUSE 4 AND 34

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Row House 4 And 34

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

ROW HOUSE 4 AND 34

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises35%

Row House 4 And 34

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises35%
Overall Percentage of Completion of the work done For the entire Building /Wing54%

ROW HOUSE 4 AND 34

Plinth100%
Podiums (if any) 0%

Row House 4 And 34

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises35%

ROW HOUSE 4 AND 34

Sanitary Fittings within the flats / premises35%
Slabs of Super Structure100%

Row House 4 And 34

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.70%

ROW HOUSE 4 AND 34

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks70%

Row House 4 And 34

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

ROW HOUSE 42 AND 43

Basement (if any)100%

Row House 42 And 43

Excavation100%

ROW HOUSE 42 AND 43

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%

Row House 42 And 43

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate30%

ROW HOUSE 42 AND 43

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.30%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%

Row House 42 And 43

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises95%

ROW HOUSE 42 AND 43

Plinth100%
Podiums (if any) 0%

Row House 42 And 43

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises90%

ROW HOUSE 42 AND 43

Sanitary Fittings within the flats / premises90%
Slabs of Super Structure100%

Row House 42 And 43

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.90%

ROW HOUSE 42 AND 43

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%

Row House 42 And 43

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing80%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

ROW HOUSE 5 AND 35

Basement (if any)100%

Row House 5 And 35

Excavation100%

ROW HOUSE 5 AND 35

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Row House 5 And 35

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

ROW HOUSE 5 AND 35

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises35%

Row House 5 And 35

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises35%
Overall Percentage of Completion of the work done For the entire Building /Wing54%

ROW HOUSE 5 AND 35

Plinth100%
Podiums (if any) 0%

Row House 5 And 35

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises35%

ROW HOUSE 5 AND 35

Sanitary Fittings within the flats / premises35%
Slabs of Super Structure100%

Row House 5 And 35

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.70%

ROW HOUSE 5 AND 35

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks70%

Row House 5 And 35

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

ROW HOUSE 6 AND 36

Basement (if any)100%

Row House 6 And 36

Excavation100%

ROW HOUSE 6 AND 36

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Row House 6 And 36

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

ROW HOUSE 6 AND 36

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises35%

Row House 6 And 36

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises35%
Overall Percentage of Completion of the work done For the entire Building /Wing54%

ROW HOUSE 6 AND 36

Plinth100%
Podiums (if any) 0%

Row House 6 And 36

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises35%

ROW HOUSE 6 AND 36

Sanitary Fittings within the flats / premises35%
Slabs of Super Structure100%

Row House 6 And 36

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.70%

ROW HOUSE 6 AND 36

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks70%

Row House 6 And 36

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

ROW HOUSE 7 AND 37

Basement (if any)100%

Row House 7 And 37

Excavation100%

ROW HOUSE 7 AND 37

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Row House 7 And 37

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

ROW HOUSE 7 AND 37

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises35%

Row House 7 And 37

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises35%
Overall Percentage of Completion of the work done For the entire Building /Wing54%

ROW HOUSE 7 AND 37

Plinth100%
Podiums (if any) 0%

Row House 7 And 37

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises35%

ROW HOUSE 7 AND 37

Sanitary Fittings within the flats / premises35%
Slabs of Super Structure100%

Row House 7 And 37

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.70%

ROW HOUSE 7 AND 37

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks70%

Row House 7 And 37

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

ROW HOUSE 8 AND 38

Basement (if any)100%

Row House 8 And 38

Excavation100%

ROW HOUSE 8 AND 38

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%

Row House 8 And 38

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate90%

ROW HOUSE 8 AND 38

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%

Row House 8 And 38

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises95%

ROW HOUSE 8 AND 38

Plinth100%
Podiums (if any) 0%

Row House 8 And 38

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises95%

ROW HOUSE 8 AND 38

Sanitary Fittings within the flats / premises95%
Slabs of Super Structure100%

Row House 8 And 38

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.90%

ROW HOUSE 8 AND 38

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%

Row House 8 And 38

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing95%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

ROW HOUSE 9 AND 39

Basement (if any)100%

Row House 9 And 39

Excavation100%

ROW HOUSE 9 AND 39

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%

Row House 9 And 39

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate95%

ROW HOUSE 9 AND 39

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%

Row House 9 And 39

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises90%

ROW HOUSE 9 AND 39

Plinth100%
Podiums (if any) 0%

Row House 9 And 39

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises95%

ROW HOUSE 9 AND 39

Sanitary Fittings within the flats / premises95%
Slabs of Super Structure100%

Row House 9 And 39

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.90%

ROW HOUSE 9 AND 39

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%

Row House 9 And 39

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing95%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings50%
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting80%
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)80%
Solid Waste Management And Disposal80%
Storm Water Drains80%
Street Lighting85%
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting80%
Water Supply
CallWhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.