RERA: A51800043517

Savera Complex

by Savera Builders &Amp; Developers
Kept in AbeyanceP99000016226

Project Information

RERA Certificate No.
P99000016226
Registration No.
REA99000036269
Developer
Savera Builders &Amp; Developers
Project Bank
AXIS BANK LTD
Proposed Possession
2022-04-14
Revised Possession
1900-01-01
Extended Possession
2026-12-31
Buildings
3
Project Area
3112.23 sq.m
Total FSI
3112.23
MahaRERA QR
Savera Complex
MahaRERA — P99000016226
Scan to verify on MahaRERA portal

Wing-wise Details

📅Completion2021-04-14
📅Completion2021-04-14
📅Completion2021-04-14

Apartment Configurations

Building No 2 Wing A

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK24.75871
88%
1 BHK27.77844
50%
1 BHK30.25404
0%
SHOP3.96101
0%
SHOP6.69110
100%
SHOP8.78110
100%
SHOP8.97101
0%
SHOP8.99211
50%
SHOP9.17110
100%

Building No 2 Wing B

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK24.91862
75%
1 BHK28.25440
100%
1 BHK28.26440
100%
1 BHK28.33880
100%
1 BHK30.57101
0%
1 BHK31.08202
0%
1 BHK31.29101
0%
1 BHK32.8303
0%
SHOP5.85110
100%
SHOP6.99220
100%
SHOP7.15110
100%
SHOP8.78110
100%
SHOP8.97110
100%
SHOP8.99220
100%
SHOP9.17110
100%
SHOP9.2330
100%
SHOP9.99110
100%

Building No 2 Wing C

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK26.06440
100%
1 BHK26.77862
75%
1 BHK29.22440
100%
1 BHK31.29101
0%
1 BHK31.51101
0%
1 BHK31.95202
0%
1 RK22.99101
0%
SHOP6.5110
100%
SHOP6.99110
100%
SHOP8.69110
100%
SHOP8.97110
100%
SHOP8.99220
100%
SHOP9.99110
100%

Construction Progress

Building No 2 Wing A

Excavation0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

Building No 2 Wing B

Excavation0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

Building No 2 Wing C

Excavation0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
CallWhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.