📞 +91 98200 30685✉️
RERA: A51800043517

N G Shree Ram Van Phase Ii

by J M G Realtors Pvt Ltd
Kept in AbeyanceP99000016813

Project Information

RERA Certificate No.
P99000016813
Developer
J M G Realtors Pvt Ltd
Project Bank
KOTAK MAHINDRA BANK
Proposed Possession
2020-09-30
Revised Possession
1900-01-01
Extended Possession
2022-03-29
Buildings
2
Project Area
3223.54 sq.m
Total FSI
43708.24
Approved FSI
40484.70
MahaRERA QR
N G Shree Ram Van Phase Ii
MahaRERA — P99000016813
Scan to verify on MahaRERA portal

Wing-wise Details

🅿️Closed Parking1
📅Completion2020-03-31
🅿️Closed Parking1
📅Completion2020-03-31

Apartment Configurations

N G Shree Ram Van Ha 46

TypeCarpet (sq.ft)TotalBookedAvailableStatus
2 BHK TYPE 153.314014
0%
2 BHK TYPE 252.6314014
0%

N G Shree Ram Van Hb 44

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK TYPE 135.5214014
0%
1 BHK TYPE 236.5214014
0%

Construction Progress

N G Shree Ram Van Ha 46

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate10%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises70%
Overall Percentage of Completion of the work done For the entire Building /Wing54%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.40%
Stilt Floor80%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing40%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

N G Shree Ram Van Hb 44

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate10%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises80%
Overall Percentage of Completion of the work done For the entire Building /Wing55%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.40%
Stilt Floor80%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing40%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space50%
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station50%
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting20%
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)90%
Solid Waste Management And Disposal
Storm Water Drains10%
Street Lighting20%
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
CallWhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.