📞 +91 98200 30685✉️
RERA: A51800043517

SYMPHONY

by SHREE ADINATH BUILDERS Partnership
Certificate SignedP99000016885

Project Information

RERA Certificate No.
P99000016885
Registration No.
REA99000039275
Registration Date
2021-09-10
Developer
SHREE ADINATH BUILDERS Partnership
Architect
Nishant Prabhakar Patil M S Vastu Shilp Associates
Project Bank
HDFC BANK
Proposed Possession
2022-06-30
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Units Sold
0
Buildings
3
Project Area
3096.93 sq.m
Total FSI
6680.53
Approved FSI
6680.53
MahaRERA QR
SYMPHONY
MahaRERA — P99000016885
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors6
Sanctioned6
🅿️Closed Parking7
📅Completion2021-06-30
🏗️Proposed Floors6
Sanctioned6
🅿️Closed Parking7
📅Completion2021-06-30
🏗️Proposed Floors6
Sanctioned6
🅿️Closed Parking7
📅Completion2021-06-30

Apartment Configurations

None

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 Bhk29.209999084472656000
0%
1 Bhk30.399999618530273000
0%
1.5 Bhk38.47999954223633000
0%
1Bhk29.760000228881836000
0%
1Bhk30.790000915527344000
0%
1Bhk30.979999542236328000
0%
2Bhk45.150001525878906000
0%
Shop No 1214.119999885559082000
0%
Shop No 511.260000228881836000
0%
Shop No.112.609999656677246000
0%
Shop No.1012.970000267028809000
0%
Shop No.1112.119999885559082000
0%
Shop No.1312.1899995803833000
0%
Shop No.29.979999542236328000
0%
Shop No.313.649999618530273000
0%
Shop No.415.949999809265137000
0%
Shop No.69.510000228881836000
0%
Shop No.79.510000228881836000
0%
Shop No.811.260000228881836000
0%
Shop No.915.949999809265137000
0%

Symphony Bldg No 4 Type D Wing A

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK30.7913211
15%
1.5 BHK38.48523
40%

Symphony Bldg No 4 Type E Wing C

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK29.21404
0%
1 BHK30.417017
0%
SHOP NO 511.26101
0%
SHOP NO.112.61101
0%
SHOP NO.29.98101
0%
SHOP NO.313.65101
0%
SHOP NO.415.95101
0%
SHOP NO.69.51101
0%

Symphony Building No 4 Type E-1 Wing B

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK29.76505
0%
1 BHK30.9817710
41%
2 BHK45.15431
75%
SHOP NO 1214.12101
0%
SHOP NO.1012.97101
0%
SHOP NO.1112.12101
0%
SHOP NO.1312.19101
0%
SHOP NO.79.51101
0%
SHOP NO.811.26101
0%
SHOP NO.915.95110
100%

Construction Progress

SYMPHONY BLDG NO 4 TYPE D WING A

Basement (if any)100%

Symphony Bldg No 4 Type D Wing A

Excavation100%

SYMPHONY BLDG NO 4 TYPE D WING A

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Symphony Bldg No 4 Type D Wing A

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

SYMPHONY BLDG NO 4 TYPE D WING A

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Symphony Bldg No 4 Type D Wing A

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing100%

SYMPHONY BLDG NO 4 TYPE D WING A

Plinth100%
Podiums (if any) 100%

Symphony Bldg No 4 Type D Wing A

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

SYMPHONY BLDG NO 4 TYPE D WING A

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Symphony Bldg No 4 Type D Wing A

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

SYMPHONY BLDG NO 4 TYPE D WING A

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Symphony Bldg No 4 Type D Wing A

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

SYMPHONY BLDG NO 4 TYPE E WING C

Basement (if any)100%

Symphony Bldg No 4 Type E Wing C

Excavation100%

SYMPHONY BLDG NO 4 TYPE E WING C

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Symphony Bldg No 4 Type E Wing C

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

SYMPHONY BLDG NO 4 TYPE E WING C

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Symphony Bldg No 4 Type E Wing C

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing100%

SYMPHONY BLDG NO 4 TYPE E WING C

Plinth100%
Podiums (if any) 100%

Symphony Bldg No 4 Type E Wing C

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

SYMPHONY BLDG NO 4 TYPE E WING C

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Symphony Bldg No 4 Type E Wing C

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

SYMPHONY BLDG NO 4 TYPE E WING C

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Symphony Bldg No 4 Type E Wing C

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

SYMPHONY BUILDING NO 4 TYPE E-1 WING B

Basement (if any)100%

Symphony Building No 4 Type E-1 Wing B

Excavation100%

SYMPHONY BUILDING NO 4 TYPE E-1 WING B

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Symphony Building No 4 Type E-1 Wing B

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

SYMPHONY BUILDING NO 4 TYPE E-1 WING B

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Symphony Building No 4 Type E-1 Wing B

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing100%

SYMPHONY BUILDING NO 4 TYPE E-1 WING B

Plinth100%
Podiums (if any) 100%

Symphony Building No 4 Type E-1 Wing B

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

SYMPHONY BUILDING NO 4 TYPE E-1 WING B

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Symphony Building No 4 Type E-1 Wing B

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

SYMPHONY BUILDING NO 4 TYPE E-1 WING B

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Symphony Building No 4 Type E-1 Wing B

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station100%
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting100%
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)100%
Solid Waste Management And Disposal
Storm Water Drains100%
Street Lighting100%
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting100%
Water Supply100%
CallWhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.