📞 +91 98200 30685 ✉️
RERA: A51800043517

AARC RESIDENCY

by AARC HOUSING CO Partnership
Certificate Signed P51800006940
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51800006940
Registration No.
REA51800017271
Registration Date
2020-06-14
Developer
AARC HOUSING CO Partnership
Architect
Ms Veturkar & Associates
Project Bank
UNION BANK OF INDIA
Proposed Possession
2021-03-30
Revised Possession
2021-03-30
Extended Possession
1900-01-01
Units Sold
0
Buildings
1
Project Area
672.00 sq.m
Total FSI
2058.00
Approved FSI
2058.00
MahaRERA QR
AARC RESIDENCY
MahaRERA — P51800006940
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors8
Sanctioned8
📅Completion2019-10-31

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
Residential 41.599998474121094 0 0 0
0%
Residential 43.70000076293945 0 0 0
0%
Residential 49.77000045776367 0 0 0
0%
Residential 53.38999938964844 0 0 0
0%

Aarc Residency

Type Carpet (sq.ft) Total Booked Available Status
RESIDENTIAL 41.6 7 0 7
0%
RESIDENTIAL 43.7 7 0 7
0%
RESIDENTIAL 49.77 7 0 7
0%
RESIDENTIAL 53.39 7 0 7
0%

Construction Progress

AARC RESIDENCY

Basement (if any)0%

Aarc Residency

Excavation100%

AARC RESIDENCY

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Aarc Residency

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

AARC RESIDENCY

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

Aarc Residency

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing37%

AARC RESIDENCY

Plinth0%
Podiums (if any) 0%

Aarc Residency

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

AARC RESIDENCY

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure70%

Aarc Residency

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

AARC RESIDENCY

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Aarc Residency

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure70%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.