📞 +91 98200 30685✉️
RERA: A51800043517

Anchor Residency

by Anchor Sky Scrapers Llp Partnership
Certificate SignedP51800001059

Project Information

RERA Certificate No.
P51800001059
Registration No.
REA51800005040
Registration Date
2017-07-25
Developer
Anchor Sky Scrapers Llp Partnership
Architect
Pushkar Consultants
Project Bank
ICICI BANK LIMITED
Proposed Possession
2019-12-31
Revised Possession
2019-12-31
Extended Possession
2022-06-30
Units Sold
0
Buildings
2
Project Area
2077.30 sq.m
Total FSI
5592.96
Approved FSI
5592.96
MahaRERA QR
Anchor Residency
MahaRERA — P51800001059
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors84
Sanctioned84
⬇️Basements2
🚗Open Parking10
🅿️Closed Parking72
📅Completion2019-12-31
🏗️Proposed Floors11
Sanctioned11
🅿️Closed Parking3
📅Completion2019-12-31

Apartment Configurations

None

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 Bhk30.31999969482422000
0%
1 Bhk44.33000183105469000
0%
2Bhk64.4000015258789000
0%
2Bhk65.16000366210938000
0%
Shop0128.420000076293945000
0%
Shop0214.970000267028809000
0%
Shop0311.130000114440918000
0%
Shop0411.550000190734863000
0%
Shop0524.809999465942383000
0%

Anchor Residency A

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK44.3317134
76%
2 BHK64.418117
61%
2 BHK65.1618135
72%
SHOP0128.42110
100%
SHOP0214.97110
100%
SHOP0311.13110
100%
SHOP0411.55110
100%
SHOP0524.81110
100%

Anchor Residency B-C

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK30.32110
100%

Construction Progress

ANCHOR RESIDENCY A

Basement (if any)90%

Anchor Residency A

Excavation100%

ANCHOR RESIDENCY A

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.75%

Anchor Residency A

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate50%

ANCHOR RESIDENCY A

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%

Anchor Residency A

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises60%
Overall Percentage of Completion of the work done For the entire Building /Wing65%

ANCHOR RESIDENCY A

Plinth90%
Podiums (if any) 0%

Anchor Residency A

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises25%

ANCHOR RESIDENCY A

Sanitary Fittings within the flats / premises25%
Slabs of Super Structure100%

Anchor Residency A

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.50%

ANCHOR RESIDENCY A

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%

Anchor Residency A

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing75%
X number of Basement(s) and Plinth90%
X number of Podiums0%
X number of Slabs of Super Structure100%

ANCHOR RESIDENCY B-C

Basement (if any)100%

Anchor Residency B-C

Excavation100%

ANCHOR RESIDENCY B-C

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Anchor Residency B-C

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate90%

ANCHOR RESIDENCY B-C

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Anchor Residency B-C

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing89%

ANCHOR RESIDENCY B-C

Plinth100%
Podiums (if any) 0%

Anchor Residency B-C

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

ANCHOR RESIDENCY B-C

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Anchor Residency B-C

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

ANCHOR RESIDENCY B-C

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Anchor Residency B-C

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
CallWhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.