📞 +91 98200 30685 ✉️
RERA: A51800043517

Shri Arham Bluz

by Shri Parrsssva Arham Developers
Kept in Abeyance P51800010383
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51800010383
Registration No.
REA51800014840
Developer
Shri Parrsssva Arham Developers
Project Bank
AXIS BANK LIMITED
Proposed Possession
2018-12-31
Revised Possession
2018-12-31
Extended Possession
2022-06-30
Buildings
3
Project Area
1710.60 sq.m
Total FSI
4587.51
Approved FSI
378.65
MahaRERA QR
Shri Arham Bluz
MahaRERA — P51800010383
Scan to verify on MahaRERA portal

Wing-wise Details

🅿️Closed Parking2
📅Completion1900-01-01
🅿️Closed Parking21
📅Completion1900-01-01
🅿️Closed Parking19
📅Completion1900-01-01

Apartment Configurations

Shri Arham Bluz Wing A

Type Carpet (sq.ft) Total Booked Available Status
RESIDENTIAL 14.02 1 1 0
100%
RESIDENTIAL 28.2 3 3 0
100%
RESIDENTIAL 33.89 5 5 0
100%
RESIDENTIAL 46.95 2 2 0
100%
RESIDENTIAL 50.52 1 1 0
100%
RESIDENTIAL 56.47 6 6 0
100%

Shri Arham Bluz Wing B

Type Carpet (sq.ft) Total Booked Available Status
RESIDENTIAL 29.57 2 2 0
100%
RESIDENTIAL 32.75 8 7 1
88%
RESIDENTIAL 34.34 8 8 0
100%
RESIDENTIAL 37.13 7 6 1
86%
RESIDENTIAL 39.91 7 6 1
86%
RESIDENTIAL 42.69 1 1 0
100%
RESIDENTIAL 44.28 3 3 0
100%
RESIDENTIAL 45.54 1 1 0
100%
RESIDENTIAL 61.93 1 1 0
100%

Shri Arham Bluz Wing C

Type Carpet (sq.ft) Total Booked Available Status
COMMERCIAL 100.8 2 2 0
100%
RESIDENTIAL 11.09 1 1 0
100%
RESIDENTIAL 21.41 1 1 0
100%
RESIDENTIAL 26.0 1 1 0
100%
RESIDENTIAL 33.15 1 1 0
100%
RESIDENTIAL 34.34 1 1 0
100%
RESIDENTIAL 35.84 1 1 0
100%
RESIDENTIAL 36.73 10 6 4
60%
RESIDENTIAL 45.7 3 3 0
100%
RESIDENTIAL 47.62 1 1 0
100%
RESIDENTIAL 48.66 1 1 0
100%
RESIDENTIAL 49.14 9 5 4
56%
RESIDENTIAL 50.58 1 1 0
100%
RESIDENTIAL 59.52 1 1 0
100%
RESIDENTIAL 61.33 3 2 1
67%
RESIDENTIAL 61.93 6 6 0
100%

Construction Progress

Shri Arham Bluz Wing A

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

Shri Arham Bluz Wing B

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

Shri Arham Bluz Wing C

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate20%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises90%
Overall Percentage of Completion of the work done For the entire Building /Wing65%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises50%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.60%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing30%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station 70%
Energy management
Fire Protection And Fire Safety Requirements 70%
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP) 80%
Solid Waste Management And Disposal
Storm Water Drains 80%
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting 80%
Water Supply 70%
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.