Project Information

RERA Certificate No.
P51800010383
Registration No.
REA51800014840
Developer
Shri Parrsssva Arham Developers
Project Bank
AXIS BANK LIMITED
Proposed Possession
2018-12-31
Revised Possession
2018-12-31
Extended Possession
2022-06-30
Buildings
3
Project Area
1710.60 sq.m
Total FSI
4587.51
Approved FSI
378.65
MahaRERA QR
Shri Arham Bluz
MahaRERA — P51800010383
Scan to verify on MahaRERA portal

Wing-wise Details

🅿️Closed Parking2
📅Completion1900-01-01
🅿️Closed Parking21
📅Completion1900-01-01
🅿️Closed Parking19
📅Completion1900-01-01

Apartment Configurations

Shri Arham Bluz Wing A

TypeCarpet (sq.ft)TotalBookedAvailableStatus
RESIDENTIAL14.02110
100%
RESIDENTIAL28.2330
100%
RESIDENTIAL33.89550
100%
RESIDENTIAL46.95220
100%
RESIDENTIAL50.52110
100%
RESIDENTIAL56.47660
100%

Shri Arham Bluz Wing B

TypeCarpet (sq.ft)TotalBookedAvailableStatus
RESIDENTIAL29.57220
100%
RESIDENTIAL32.75871
88%
RESIDENTIAL34.34880
100%
RESIDENTIAL37.13761
86%
RESIDENTIAL39.91761
86%
RESIDENTIAL42.69110
100%
RESIDENTIAL44.28330
100%
RESIDENTIAL45.54110
100%
RESIDENTIAL61.93110
100%

Shri Arham Bluz Wing C

TypeCarpet (sq.ft)TotalBookedAvailableStatus
COMMERCIAL100.8220
100%
RESIDENTIAL11.09110
100%
RESIDENTIAL21.41110
100%
RESIDENTIAL26.0110
100%
RESIDENTIAL33.15110
100%
RESIDENTIAL34.34110
100%
RESIDENTIAL35.84110
100%
RESIDENTIAL36.731064
60%
RESIDENTIAL45.7330
100%
RESIDENTIAL47.62110
100%
RESIDENTIAL48.66110
100%
RESIDENTIAL49.14954
56%
RESIDENTIAL50.58110
100%
RESIDENTIAL59.52110
100%
RESIDENTIAL61.33321
67%
RESIDENTIAL61.93660
100%

Construction Progress

Shri Arham Bluz Wing A

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

Shri Arham Bluz Wing B

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

Shri Arham Bluz Wing C

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate20%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises90%
Overall Percentage of Completion of the work done For the entire Building /Wing65%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises50%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.60%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing30%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station70%
Energy management
Fire Protection And Fire Safety Requirements70%
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)80%
Solid Waste Management And Disposal
Storm Water Drains80%
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting80%
Water Supply70%
CallWhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.