📞 +91 98200 30685✉️
RERA: A51800043517

Ariha Vincere

by Velstand Realty Llp Others
Certificate SignedP51800076927

Project Information

RERA Certificate No.
P51800076927
Registration No.
REA51800160257
Registration Date
2024-07-09
Developer
Velstand Realty Llp Others
Project Bank
HDFC BANK
Proposed Possession
2027-06-30
Total Units
95
Units Sold
16 (17%)
Project Area
1089.40 sq.m
Total FSI
5882.76
Approved FSI
5882.76
MahaRERA QR
Ariha Vincere
MahaRERA — P51800076927
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors23
Sanctioned23
🅿️Closed Parking62
📅Completion2027-06-30

Apartment Configurations

Ariha Vincere

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK38.93202
0%
1 BHK40.41422
50%
1RK25.27404
0%
2 BHK62.4312012
0%
2 BHK69.2116511
31%
2 BHK70.1415510
33%
Existing Tenant 1 RK30.38220
100%
Existing Tenant 1BHK38.93770
100%
Existing Tenant 1BHK40.41550
100%
Existing Tenant 1BHK45.06330
100%
Existing Tenant 1BHK48.77220
100%
Existing Tenant 1BHK49.7330
100%
Existing Tenant 1RK25.27220
100%
Existing Tenant 2BHK62.43550
100%
Existing Tenant 2BHK69.21101
0%
Existing Tenant 2BHK70.14220
100%
Office space78.13101
0%
Office space89.74101
0%
Office space125.14101
0%
Office space136.75101
0%
Shop No 1 Rehab23.32110
100%
Shop No. 2 Rehab71.81110
100%
Shop No. 3 Rehab36.51110
100%
Shop No. 4 Rehab63.92110
100%
Shop No. 5 Rehab47.1110
100%
Shop No. 6 Rehab48.22110
100%

None

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1Bhk38.93000030517578000
0%
1Bhk40.40999984741211000
0%
1Rk25.270000457763672000
0%
2Bhk62.43000030517578000
0%
2Bhk69.20999908447266000
0%
2Bhk70.13999938964844000
0%
Existing Tenant 1 Rk30.3799991607666000
0%
Existing Tenant 1Bhk38.93000030517578000
0%
Existing Tenant 1Bhk40.40999984741211000
0%
Existing Tenant 1Bhk45.060001373291016000
0%
Existing Tenant 1Bhk48.77000045776367000
0%
Existing Tenant 1Bhk49.70000076293945000
0%
Existing Tenant 1Rk25.270000457763672000
0%
Existing Tenant 2Bhk62.43000030517578000
0%
Existing Tenant 2Bhk69.20999908447266000
0%
Existing Tenant 2Bhk70.13999938964844000
0%
Office Space78.12999725341797000
0%
Office Space89.73999786376953000
0%
Office Space125.13999938964844000
0%
Office Space136.75000
0%
Shop No 1 Rehab23.31999969482422000
0%
Shop No. 2 Rehab71.80999755859375000
0%
Shop No. 3 Rehab36.5099983215332000
0%
Shop No. 4 Rehab63.91999816894531000
0%
Shop No. 5 Rehab47.099998474121094000
0%
Shop No. 6 Rehab48.220001220703125000
0%

Construction Progress

ARIHA VINCERE

Basement (if any)100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

Ariha Vincere

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing30%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure0%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal5%
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
CallWhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.