ARIHANT ANSHULA

by ARIHANT AASHIYANA PRIVATE LIMITED Company
Certificate Signed P52000009246
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P52000009246
Registration No.
REA52000007948
Registration Date
2019-05-08
Developer
ARIHANT AASHIYANA PRIVATE LIMITED Company
Architect
Kiran K Awhale
Project Bank
ICICI BANK LIMITED
Proposed Possession
2019-12-30
Revised Possession
2019-12-30
Extended Possession
1900-01-01
Units Sold
0
Buildings
25
Project Area
27390.00 sq.m
Total FSI
26484.00
Approved FSI
26674.00
MahaRERA QR
ARIHANT ANSHULA
MahaRERA — P52000009246
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors5
Sanctioned5
🅿️Closed Parking21
📅Completion2019-12-30
🏗️Proposed Floors5
Sanctioned5
🅿️Closed Parking9
📅Completion2019-12-30
🏗️Proposed Floors5
Sanctioned5
🅿️Closed Parking10
📅Completion2019-12-30
🏗️Proposed Floors5
Sanctioned5
🅿️Closed Parking6
📅Completion2019-12-30
🏗️Proposed Floors5
Sanctioned5
🅿️Closed Parking21
📅Completion2019-12-30
🏗️Proposed Floors5
Sanctioned5
🅿️Closed Parking18
📅Completion2019-12-30
🏗️Proposed Floors5
Sanctioned5
🅿️Closed Parking13
📅Completion2019-12-30
🏗️Proposed Floors5
Sanctioned5
🅿️Closed Parking19
📅Completion2019-12-30
🏗️Proposed Floors5
Sanctioned5
🅿️Closed Parking21
📅Completion2019-12-30
🏗️Proposed Floors5
Sanctioned5
🅿️Closed Parking13
📅Completion2019-12-30
🏗️Proposed Floors5
Sanctioned5
🅿️Closed Parking11
📅Completion2019-12-30
🏗️Proposed Floors5
Sanctioned5
🅿️Closed Parking10
📅Completion2019-12-30
🏗️Proposed Floors5
Sanctioned5
🅿️Closed Parking10
📅Completion2019-12-30
🏗️Proposed Floors5
Sanctioned5
🅿️Closed Parking16
📅Completion2019-12-30
🏗️Proposed Floors5
Sanctioned5
🅿️Closed Parking8
📅Completion2019-12-30
🏗️Proposed Floors5
Sanctioned5
🅿️Closed Parking18
📅Completion2019-12-30
🏗️Proposed Floors5
Sanctioned5
🅿️Closed Parking16
📅Completion2019-12-30
🏗️Proposed Floors5
Sanctioned5
🅿️Closed Parking15
📅Completion2019-12-30
🏗️Proposed Floors5
Sanctioned5
🅿️Closed Parking13
📅Completion2019-12-30
🏗️Proposed Floors5
Sanctioned5
🅿️Closed Parking37
📅Completion2019-12-30
🏗️Proposed Floors5
Sanctioned5
🅿️Closed Parking30
📅Completion2019-12-30
🏗️Proposed Floors5
Sanctioned5
🅿️Closed Parking13
📅Completion2019-12-30
🏗️Proposed Floors5
Sanctioned5
🅿️Closed Parking18
📅Completion2019-12-30
🏗️Proposed Floors5
Sanctioned5
🅿️Closed Parking21
📅Completion2019-12-30
🏗️Proposed Floors5
Sanctioned5
🅿️Closed Parking22
📅Completion2019-12-30

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
1 Bhk 28.90999984741211 0 0 0
0%
1 Bhk 29.90999984741211 0 0 0
0%
1 Bhk 30.739999771118164 0 0 0
0%
1 Bhk 31.239999771118164 0 0 0
0%
1 Bhk 31.520000457763672 0 0 0
0%
1 Bhk 31.549999237060547 0 0 0
0%
1Bhk 31.549999237060547 0 0 0
0%
2 Bhk 45.58000183105469 0 0 0
0%
2 Bhk 45.869998931884766 0 0 0
0%
2 Bhk 46.540000915527344 0 0 0
0%
2 Bhk 46.810001373291016 0 0 0
0%
2 Bhk 47.2599983215332 0 0 0
0%
2 Bhk 47.5 0 0 0
0%
2 Bhk 47.83000183105469 0 0 0
0%
2 Bhk 47.91999816894531 0 0 0
0%
2 Bhk Type I 45.34000015258789 0 0 0
0%
2 Bhk Type I 46.58000183105469 0 0 0
0%
2 Bhk Type I 47.84000015258789 0 0 0
0%
2 Bhk Type Ii 46.439998626708984 0 0 0
0%
2 Bhk Type Ii 46.65999984741211 0 0 0
0%
2 Bhk Type Ii 49.400001525878906 0 0 0
0%
2 Bhktype Ii 49.400001525878906 0 0 0
0%
3 Bhk 62.86000061035156 0 0 0
0%
3 Bhk 65.22000122070312 0 0 0
0%
Shop Type 1 27.889999389648438 0 0 0
0%
Shop Type 2 15.880000114440918 0 0 0
0%
Shoptype3 21.280000686645508 0 0 0
0%
Shoptype4 38.93000030517578 0 0 0
0%
Shoptype5 48.630001068115234 0 0 0
0%

A1

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 47.26 24 24 0
100%
SHOP TYPE 1 27.89 1 1 0
100%
SHOP TYPE 2 15.88 2 2 0
100%
SHOPTYPE3 21.28 1 1 0
100%
SHOPTYPE4 38.93 1 1 0
100%
SHOPTYPE5 48.63 1 1 0
100%

B1

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 31.55 16 16 0
100%

B2

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 31.55 8 8 0
100%
2 BHK 46.81 8 8 0
100%

B3

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 31.55 16 16 0
100%

C1

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 30.74 4 4 0
100%
2 BHK Type I 45.34 8 8 0
100%
2 BHK Type II 46.44 12 12 0
100%

C2

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 45.58 24 24 0
100%

C3

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 45.87 16 16 0
100%

C4

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 45.58 24 24 0
100%

C5

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 30.74 4 4 0
100%
2 BHK Type I 45.34 8 8 0
100%
2 BHK Type II 46.44 12 12 0
100%

D1

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 47.92 16 16 0
100%

D2

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 47.92 16 16 0
100%

D3

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 47.92 16 16 0
100%

E1

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 31.52 16 16 0
100%

E2

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 31.24 24 24 0
100%

E3

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 31.52 16 16 0
100%

F1

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 28.91 8 8 0
100%
2 BHK Type I 46.58 12 12 0
100%
2 BHK Type II 46.66 4 4 0
100%

F2

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 28.91 8 8 0
100%
2 BHK Type I 46.58 12 12 0
100%
2 BHK Type II 46.66 4 4 0
100%

G1

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 47.83 8 8 0
100%
3 BHK 65.22 8 8 0
100%

G2

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 47.83 8 8 0
100%
3 BHK 65.22 8 7 1
88%

G3

Type Carpet (sq.ft) Total Booked Available Status
2 BHK Type I 47.84 12 12 0
100%
2 BHK Type II 49.4 4 4 0
100%
3 BHK 62.86 8 8 0
100%

G4

Type Carpet (sq.ft) Total Booked Available Status
2 BHK Type I 47.84 12 12 0
100%
2 BHKType II 49.4 4 4 0
100%
3 BHK 62.86 8 8 0
100%

H1

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 29.91 8 8 0
100%
2 BHK 47.5 8 8 0
100%

H2

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 46.54 24 24 0
100%

H3

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 46.54 24 24 0
100%

H4

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 46.54 24 24 0
100%

Construction Progress

A1

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises86%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises49%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks33%
Stilt Floor 100%

B1

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor 100%

B2

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor 100%

B3

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor 100%

C1

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor 100%

C2

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor 100%

C3

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor 100%

C4

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor 100%

C5

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor 100%

D1

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor 100%

D2

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor 100%

D3

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor 100%

E1

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor 100%

E2

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor 100%

E3

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor 100%

F1

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor 100%

F2

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor 100%

G1

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.59%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises96%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises69%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor 100%

G2

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.59%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises86%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises59%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor 100%

G3

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.59%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises86%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises59%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor 100%

G4

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.32%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises85%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises59%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor 100%

H1

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.27%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises85%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises59%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor 100%

H2

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.27%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises85%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises59%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor 100%

H3

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises96%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises59%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor 100%

H4

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises96%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises59%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor 100%

RERA Registered Amenities

Aggregate area of recreational Open Space 90%
Community Buildings 100%
Electrical Meter Room, Sub-Station, Receiving Station 100%
Energy management 100%
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting 90%
Open Parking 100%
Sewerage (Chamber, Lines, Septic Tank , STP) 100%
Solid Waste Management And Disposal 100%
Storm Water Drains 100%
Street Lighting 50%
Treatment And Disposal Of Sewage And Sullage Water 100%
Water Conservation, Rain water Harvesting 80%
Water Supply 100%
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.