📞 +91 98200 30685 ✉️
RERA: A51800043517

ARKADE CROWN

by Arkade Developers Private Limited Company
Certificate Signed P51800045342
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51800045342
Registration No.
REA51800107832
Registration Date
2024-02-20
Developer
Arkade Developers Private Limited Company
Architect
Kalakruti Architects & Planners
Project Bank
HDFC BANK
Proposed Possession
2025-12-31
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Units Sold
0
Buildings
3
Project Area
5711.90 sq.m
Total FSI
18177.92
Approved FSI
16696.48
MahaRERA QR
ARKADE CROWN
MahaRERA — P51800045342
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors24
Sanctioned24
📅Completion2025-12-31
🏗️Proposed Floors24
Sanctioned24
📅Completion2025-12-31
🏗️Proposed Floors24
Sanctioned24
📅Completion2025-12-31

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
1Bhk 37.099998474121094 0 0 0
0%
1Bhk 40.04999923706055 0 0 0
0%
1Bhk 40.25 0 0 0
0%
1Bhk 40.720001220703125 0 0 0
0%
1Bhk 41.16999816894531 0 0 0
0%
1Bhk 41.86000061035156 0 0 0
0%
1Bhk 42.43000030517578 0 0 0
0%
1Bhk 43.5 0 0 0
0%
1Rk 20.760000228881836 0 0 0
0%
2Bhk 47.47999954223633 0 0 0
0%
2Bhk 48.2400016784668 0 0 0
0%
2Bhk 55.279998779296875 0 0 0
0%
2Bhk 58.58000183105469 0 0 0
0%
2Bhk 59.84000015258789 0 0 0
0%
2Bhk 61.0 0 0 0
0%
2Bhk 63.060001373291016 0 0 0
0%
2Bhk 63.18000030517578 0 0 0
0%
2Bhk 63.220001220703125 0 0 0
0%
2Bhk 63.34000015258789 0 0 0
0%
2Bhk 63.41999816894531 0 0 0
0%
2Bhk 63.529998779296875 0 0 0
0%
2Bhk 64.16999816894531 0 0 0
0%
2Bhk 64.30999755859375 0 0 0
0%
2Bhk 64.80999755859375 0 0 0
0%
2Bhk 65.75 0 0 0
0%
2Bhk 66.87000274658203 0 0 0
0%
2Bhk 66.93000030517578 0 0 0
0%
3.5 And 4 Bhk 119.73999786376953 0 0 0
0%
3Bhk 77.6500015258789 0 0 0
0%
3Bhk 80.37000274658203 0 0 0
0%
3Bhk 82.12000274658203 0 0 0
0%
3Bhk 83.94999694824219 0 0 0
0%
3Bhk 86.62999725341797 0 0 0
0%
3Bhk 86.66999816894531 0 0 0
0%
3Bhk 94.33999633789062 0 0 0
0%
3Bhk 98.83999633789062 0 0 0
0%
3Bhk 99.38999938964844 0 0 0
0%
3Bhk 107.05999755859375 0 0 0
0%

Wing A

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 37.1 2 2 0
100%
1 BHK 41.86 1 1 0
100%
1 BHK 42.43 12 12 0
100%
1RK 20.76 1 1 0
100%
2 BHK 47.48 4 4 0
100%
2 BHK 48.24 8 8 0
100%
2 BHK 63.06 6 6 0
100%
2 BHK 63.18 1 1 0
100%
2 BHK 63.34 1 1 0
100%
2 BHK 63.53 6 6 0
100%
2 BHK 64.31 11 10 1
91%
2 BHK 65.75 17 17 0
100%
2 BHK 66.87 16 15 1
94%
3 BHK 77.65 6 6 0
100%
3 BHK 80.37 1 1 0
100%
3 BHK 82.12 1 1 0
100%
3 BHK 83.95 5 5 0
100%
3 BHK 86.63 1 1 0
100%
3 BHK 94.34 4 4 0
100%

Wing B

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 40.05 17 12 5
71%
1 BHK 40.25 2 1 1
50%
2 BHK 55.28 10 10 0
100%
2 BHK 58.58 1 1 0
100%
2 BHK 59.84 1 1 0
100%
2 BHK 61.0 7 6 1
86%
2 BHK 64.81 2 2 0
100%
3 BHK 86.67 1 1 0
100%
3.5 and 4 BHK 119.74 14 13 1
93%

Wing C

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 40.72 2 2 0
100%
1 BHK 41.17 5 5 0
100%
1 BHK 43.5 7 7 0
100%
2 BHK 63.22 4 4 0
100%
2 BHK 63.42 3 3 0
100%
2 BHK 64.17 8 8 0
100%
2 BHK 66.93 3 3 0
100%
3 BHK 98.84 11 4 7
36%
3 BHK 99.39 16 15 1
94%
3 BHK 107.06 18 17 1
94%

Construction Progress

Wing A

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.59%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate43%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.43%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises84%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises84%
Plinth100%
Podiums (if any) 100%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.93%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks93%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing59%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

Wing B

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.59%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate40%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.40%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises73%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises73%
Overall Percentage of Completion of the work done For the entire Building /Wing66%
Plinth100%
Podiums (if any) 100%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.88%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks88%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing59%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

Wing C

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.71%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate47%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.47%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises87%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises87%
Plinth100%
Podiums (if any) 100%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises9%
Sanitary Fittings within the flats / premises9%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.92%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks92%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing71%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space
Car Parking System
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station 75%
Energy management 75%
Fire Protection And Fire Safety Requirements 75%
Fitness Centre Society Office 50%
Landscaping & Tree Planting 50%
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP) 70%
Solid Waste Management And Disposal 70%
Storm Water Drains 75%
Street Lighting 50%
Swimming Pool
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting 75%
Water Supply 75%
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.