📞 +91 98200 30685✉️
RERA: A51800043517

Ashar 16 Wing E Phase I

by Ms Ashar Realtors Others
Certificate SignedP51700001081

Project Information

RERA Certificate No.
P51700001081
Registration No.
REA51700005869
Registration Date
2017-07-26
Developer
Ms Ashar Realtors Others
Architect
Daisaria Associates
Project Bank
HDFC BANK
Proposed Possession
2018-12-31
Revised Possession
2018-12-31
Extended Possession
1900-01-01
Units Sold
0
Buildings
1
Project Area
269.03 sq.m
Total FSI
1581.80
Approved FSI
1555.89
MahaRERA QR
Ashar 16 Wing E Phase I
MahaRERA — P51700001081
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors12
Sanctioned12
🚗Open Parking3
🅿️Closed Parking15
📅Completion1900-01-01

Apartment Configurations

None

TypeCarpet (sq.ft)TotalBookedAvailableStatus
Type A 1 Bhk31.84000015258789000
0%
Type B 2 Bhk48.29999923706055000
0%

Ashar 16 Wing E

TypeCarpet (sq.ft)TotalBookedAvailableStatus
TYPE A 1 BHK31.8417161
94%
TYPE B 2 BHK48.318810
44%

Construction Progress

ASHAR 16 WING E

Basement (if any)100%

Ashar 16 Wing E

Excavation100%

ASHAR 16 WING E

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Ashar 16 Wing E

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

ASHAR 16 WING E

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Ashar 16 Wing E

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%

ASHAR 16 WING E

Plinth100%
Podiums (if any) 0%

Ashar 16 Wing E

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

ASHAR 16 WING E

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Ashar 16 Wing E

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

ASHAR 16 WING E

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Ashar 16 Wing E

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station100%
Energy management100%
Fire Protection And Fire Safety Requirements100%
Landscaping & Tree Planting
MENS CHANGING ROOM TOILET100%
MULTIPURPOSE GATHERING ROOM RECREATION100%
Open Parking100%
Sewerage (Chamber, Lines, Septic Tank , STP)100%
Solid Waste Management And Disposal
Storm Water Drains100%
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water100%
Water Conservation, Rain water Harvesting100%
Water Supply
WOMENS CHANGING ROOM TOILET100%
CallWhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.