Project Information

RERA Certificate No.
P51700056361
Registration No.
REA51700157761
Registration Date
2024-05-31
Developer
AJAY PRATAP ASHAR Individual
Architect
Joshi Deshaware Associates
Project Bank
ICICI BANK LIMITED
Proposed Possession
2028-12-31
Units Sold
0
Project Area
14918.71 sq.m
Total FSI
71824.73
Approved FSI
54927.61
MahaRERA QR
ASHAR MERAC PHASE I
MahaRERA — P51700056361
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors42
Sanctioned42
🅿️Closed Parking126
📅Completion2028-12-31
🏗️Proposed Floors38
Sanctioned38
🅿️Closed Parking155
📅Completion2028-12-31
🏗️Proposed Floors36
Sanctioned36
🅿️Closed Parking170
📅Completion2028-12-31

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
1Bhk Type 1 36.25 0 0 0
0%
1Bhk Type 1A 36.58000183105469 0 0 0
0%
1Bhk Type 2 36.25 0 0 0
0%
1Bhk Type 2A 36.58000183105469 0 0 0
0%
1Bhk Type 3 38.849998474121094 0 0 0
0%
1Bhk Type 4 38.849998474121094 0 0 0
0%
2Bhjk Type 5 59.279998779296875 0 0 0
0%
2Bhk Type 1 59.11000061035156 0 0 0
0%
2Bhk Type 2 55.34000015258789 0 0 0
0%
2Bhk Type 2A 55.68000030517578 0 0 0
0%
2Bhk Type 3 55.34000015258789 0 0 0
0%
2Bhk Type 3A 55.68000030517578 0 0 0
0%
2Bhk Type 4 59.20000076293945 0 0 0
0%
2Bhk Type 4 59.279998779296875 0 0 0
0%
2Bhk Type 5 59.279998779296875 0 0 0
0%
2Bhk Type 6 55.34000015258789 0 0 0
0%
2Bhk Type 6A 55.68000030517578 0 0 0
0%
3 Bhk Type 1 74.29000091552734 0 0 0
0%

Ashar Merac Tower D1

Type Carpet (sq.ft) Total Booked Available Status
2 BHK TYPE 1 59.11 116 99 17
85%
3 BHK TYPE 1 74.29 122 83 39
68%

Ashar Merac Tower D2

Type Carpet (sq.ft) Total Booked Available Status
1 BHK TYPE 1 36.25 22 17 5
77%
1 BHK TYPE 1A 36.58 30 29 1
97%
1 BHK TYPE 2 36.25 11 11 0
100%
1 BHK TYPE 2A 36.58 15 14 1
93%
1 BHK TYPE 3 38.85 33 25 8
76%
1 BHK TYPE 4 38.85 60 37 23
62%
2 BHK TYPE 2 55.34 11 11 0
100%
2 BHK TYPE 2A 55.68 15 13 2
87%
2 BHK TYPE 3 55.34 18 8 10
44%
2 BHK TYPE 3A 55.68 15 8 7
53%
2 BHK TYPE 4 59.2 33 13 20
39%
2BHJK TYPE 5 59.28 33 8 25
24%

Ashar Merac Tower D3

Type Carpet (sq.ft) Total Booked Available Status
1 BHK TYPE 1 36.25 28 23 5
82%
1 BHK TYPE 1A 36.58 30 28 2
93%
1 BHK TYPE 3 38.85 23 13 10
57%
1 BHK TYPE 4 38.85 58 36 22
62%
1bhk type 2 36.25 14 10 4
71%
1bhk type 2a 36.58 15 13 2
87%
2 BHK TYPE 3 55.34 14 6 8
43%
2 BHK TYPE 3A 55.68 15 10 5
67%
2 BHK TYPE 4 59.28 29 10 19
34%
2 BHK TYPE 5 59.28 29 12 17
41%
2 BHK TYPE 6 55.34 14 7 7
50%
2 BHK TYPE 6A 55.68 15 14 1
93%

Construction Progress

ASHAR MERAC TOWER D1

Basement (if any)0%

Ashar Merac Tower D1

Excavation0%

ASHAR MERAC TOWER D1

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Ashar Merac Tower D1

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

ASHAR MERAC TOWER D1

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

Ashar Merac Tower D1

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%

ASHAR MERAC TOWER D1

Plinth0%
Podiums (if any) 0%

Ashar Merac Tower D1

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

ASHAR MERAC TOWER D1

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%

Ashar Merac Tower D1

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

ASHAR MERAC TOWER D1

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

Ashar Merac Tower D1

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

ASHAR MERAC TOWER D2

Basement (if any)0%

Ashar Merac Tower D2

Excavation0%

ASHAR MERAC TOWER D2

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Ashar Merac Tower D2

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

ASHAR MERAC TOWER D2

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

Ashar Merac Tower D2

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%

ASHAR MERAC TOWER D2

Plinth0%
Podiums (if any) 0%

Ashar Merac Tower D2

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

ASHAR MERAC TOWER D2

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%

Ashar Merac Tower D2

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

ASHAR MERAC TOWER D2

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

Ashar Merac Tower D2

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

ASHAR MERAC TOWER D3

Basement (if any)0%

Ashar Merac Tower D3

Excavation0%

ASHAR MERAC TOWER D3

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Ashar Merac Tower D3

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

ASHAR MERAC TOWER D3

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

Ashar Merac Tower D3

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%

ASHAR MERAC TOWER D3

Plinth0%
Podiums (if any) 0%

Ashar Merac Tower D3

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

ASHAR MERAC TOWER D3

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%

Ashar Merac Tower D3

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

ASHAR MERAC TOWER D3

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

Ashar Merac Tower D3

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.