ASHAR MERAC PHASE I

by AJAY PRATAP ASHAR Individual
Certificate SignedP51700056361

Project Information

RERA Certificate No.
P51700056361
Registration No.
REA51700157761
Registration Date
2024-05-31
Developer
AJAY PRATAP ASHAR Individual
Architect
Joshi Deshaware Associates
Project Bank
ICICI BANK LIMITED
Proposed Possession
2028-12-31
Units Sold
0
Project Area
14918.71 sq.m
Total FSI
71824.73
Approved FSI
54927.61
MahaRERA QR
ASHAR MERAC PHASE I
MahaRERA — P51700056361
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors42
Sanctioned42
🅿️Closed Parking126
📅Completion2028-12-31
🏗️Proposed Floors38
Sanctioned38
🅿️Closed Parking155
📅Completion2028-12-31
🏗️Proposed Floors36
Sanctioned36
🅿️Closed Parking170
📅Completion2028-12-31

Apartment Configurations

None

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1Bhk Type 136.25000
0%
1Bhk Type 1A36.58000183105469000
0%
1Bhk Type 236.25000
0%
1Bhk Type 2A36.58000183105469000
0%
1Bhk Type 338.849998474121094000
0%
1Bhk Type 438.849998474121094000
0%
2Bhjk Type 559.279998779296875000
0%
2Bhk Type 159.11000061035156000
0%
2Bhk Type 255.34000015258789000
0%
2Bhk Type 2A55.68000030517578000
0%
2Bhk Type 355.34000015258789000
0%
2Bhk Type 3A55.68000030517578000
0%
2Bhk Type 459.20000076293945000
0%
2Bhk Type 459.279998779296875000
0%
2Bhk Type 559.279998779296875000
0%
2Bhk Type 655.34000015258789000
0%
2Bhk Type 6A55.68000030517578000
0%
3 Bhk Type 174.29000091552734000
0%

Ashar Merac Tower D1

TypeCarpet (sq.ft)TotalBookedAvailableStatus
2 BHK TYPE 159.111169917
85%
3 BHK TYPE 174.291228339
68%

Ashar Merac Tower D2

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK TYPE 136.2522175
77%
1 BHK TYPE 1A36.5830291
97%
1 BHK TYPE 236.2511110
100%
1 BHK TYPE 2A36.5815141
93%
1 BHK TYPE 338.8533258
76%
1 BHK TYPE 438.85603723
62%
2 BHK TYPE 255.3411110
100%
2 BHK TYPE 2A55.6815132
87%
2 BHK TYPE 355.3418810
44%
2 BHK TYPE 3A55.681587
53%
2 BHK TYPE 459.2331320
39%
2BHJK TYPE 559.2833825
24%

Ashar Merac Tower D3

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK TYPE 136.2528235
82%
1 BHK TYPE 1A36.5830282
93%
1 BHK TYPE 338.85231310
57%
1 BHK TYPE 438.85583622
62%
1bhk type 236.2514104
71%
1bhk type 2a36.5815132
87%
2 BHK TYPE 355.341468
43%
2 BHK TYPE 3A55.6815105
67%
2 BHK TYPE 459.28291019
34%
2 BHK TYPE 559.28291217
41%
2 BHK TYPE 655.341477
50%
2 BHK TYPE 6A55.6815141
93%

Construction Progress

ASHAR MERAC TOWER D1

Basement (if any)0%

Ashar Merac Tower D1

Excavation0%

ASHAR MERAC TOWER D1

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Ashar Merac Tower D1

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

ASHAR MERAC TOWER D1

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

Ashar Merac Tower D1

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%

ASHAR MERAC TOWER D1

Plinth0%
Podiums (if any) 0%

Ashar Merac Tower D1

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

ASHAR MERAC TOWER D1

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%

Ashar Merac Tower D1

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

ASHAR MERAC TOWER D1

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

Ashar Merac Tower D1

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

ASHAR MERAC TOWER D2

Basement (if any)0%

Ashar Merac Tower D2

Excavation0%

ASHAR MERAC TOWER D2

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Ashar Merac Tower D2

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

ASHAR MERAC TOWER D2

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

Ashar Merac Tower D2

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%

ASHAR MERAC TOWER D2

Plinth0%
Podiums (if any) 0%

Ashar Merac Tower D2

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

ASHAR MERAC TOWER D2

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%

Ashar Merac Tower D2

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

ASHAR MERAC TOWER D2

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

Ashar Merac Tower D2

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

ASHAR MERAC TOWER D3

Basement (if any)0%

Ashar Merac Tower D3

Excavation0%

ASHAR MERAC TOWER D3

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Ashar Merac Tower D3

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

ASHAR MERAC TOWER D3

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

Ashar Merac Tower D3

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%

ASHAR MERAC TOWER D3

Plinth0%
Podiums (if any) 0%

Ashar Merac Tower D3

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

ASHAR MERAC TOWER D3

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%

Ashar Merac Tower D3

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

ASHAR MERAC TOWER D3

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

Ashar Merac Tower D3

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
CallWhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.