📞 +91 98200 30685✉️
RERA: A51800043517

Ashar Sapphire And Galleria

by Ms Ashar Ventures Others
Certificate SignedP51700007389

Project Information

RERA Certificate No.
P51700007389
Registration No.
REA51700011723
Registration Date
2017-08-17
Developer
Ms Ashar Ventures Others
Architect
Ms Jd And Associates
Project Bank
ICICI BANK LIMITED
Proposed Possession
2019-12-31
Revised Possession
2019-12-31
Extended Possession
2021-12-30
Units Sold
0
Buildings
1
Project Area
4638.10 sq.m
Total FSI
13914.30
Approved FSI
10291.80
MahaRERA QR
Ashar Sapphire And Galleria
MahaRERA — P51700007389
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors33
Sanctioned33
⬇️Basements2
🚗Open Parking15
🅿️Closed Parking342
📅Completion2019-12-31

Apartment Configurations

None

TypeCarpet (sq.ft)TotalBookedAvailableStatus
Shop 133.189998626708984000
0%
Shop 1028.200000762939453000
0%
Shop 1127.719999313354492000
0%
Shop 241.11000061035156000
0%
Shop 3 And 931.020000457763672000
0%
Shop 4 And 832.25000
0%
Shop 5 And 728.670000076293945000
0%
Shop 634.70000076293945000
0%
Type A 2Bhk51.779998779296875000
0%
Type B 2Bhk59.5000
0%
Type C 2Bhk52.529998779296875000
0%
Type D 2Bhk60.25000
0%
Type E 3Bhk75.54000091552734000
0%
Type F 4Bhk89.72000122070312000
0%

Ashar Sapphire And Galleria

TypeCarpet (sq.ft)TotalBookedAvailableStatus
SHOP 133.19110
100%
SHOP 1028.2110
100%
SHOP 1127.72110
100%
SHOP 241.11110
100%
SHOP 3 AND 931.02220
100%
SHOP 4 AND 832.25220
100%
SHOP 5 AND 728.67220
100%
SHOP 634.7110
100%
TYPE A 2BHK51.7844422
95%
TYPE B 2BHK59.544422
95%
TYPE C 2BHK52.53220
100%
TYPE D 2BHK60.25211
50%
TYPE E 3BHK75.54998316
84%
TYPE F 4BHK89.72404
0%

Construction Progress

ASHAR SAPPHIRE AND GALLERIA

Basement (if any)100%

Ashar Sapphire And Galleria

Excavation100%

ASHAR SAPPHIRE AND GALLERIA

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Ashar Sapphire And Galleria

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

ASHAR SAPPHIRE AND GALLERIA

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Ashar Sapphire And Galleria

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing100%

ASHAR SAPPHIRE AND GALLERIA

Plinth100%
Podiums (if any) 100%

Ashar Sapphire And Galleria

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

ASHAR SAPPHIRE AND GALLERIA

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Ashar Sapphire And Galleria

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

ASHAR SAPPHIRE AND GALLERIA

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Ashar Sapphire And Galleria

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space100%
AREA TO THANE MUNICIPAL CORPORATION100%
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station100%
Energy management100%
Fire Protection And Fire Safety Requirements100%
GYM RECREATIONAL AREA100%
Landscaping & Tree Planting100%
MECHANIZED PARKING SYSTEM100%
Open Parking100%
Sewerage (Chamber, Lines, Septic Tank , STP)100%
Solid Waste Management And Disposal
Storm Water Drains100%
Street Lighting
SWIMMING POOL100%
Treatment And Disposal Of Sewage And Sullage Water100%
Water Conservation, Rain water Harvesting100%
Water Supply100%
CallWhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.