📞 +91 98200 30685 ✉️
RERA: A51800043517

AURIS SERENITY TOWER 1

by TRANSCON-SHETH CREATORS PRIVATE LIMITED Company
Certificate Signed P51800001080
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51800001080
Registration No.
REA51800005704
Registration Date
2021-09-09
Developer
TRANSCON-SHETH CREATORS PRIVATE LIMITED Company
Architect
Arun Gurav
Project Bank
STATE BANK OF INDIA
Proposed Possession
2022-12-30
Revised Possession
2022-12-30
Extended Possession
1900-01-01
Units Sold
0
Buildings
1
Project Area
921.98 sq.m
Total FSI
39681.29
Approved FSI
39681.29
MahaRERA QR
AURIS SERENITY TOWER 1
MahaRERA — P51800001080
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors69
Sanctioned69
🅿️Closed Parking562
📅Completion2021-12-31

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
2Bhk 74.25 0 0 0
0%
2Bhk 74.80000305175781 0 0 0
0%
2Bhk 75.0 0 0 0
0%
3Bhk 110.80000305175781 0 0 0
0%
3Bhk 111.69999694824219 0 0 0
0%
3Bhk 121.9000015258789 0 0 0
0%
3Bhk 122.75 0 0 0
0%
4Bhk 149.4499969482422 0 0 0
0%
4Bhk 150.25 0 0 0
0%

Tower 1

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 74.25 26 26 0
100%
2 BHK 74.8 75 75 0
100%
2 BHK 75.0 58 56 2
97%
3 BHK 110.8 15 15 0
100%
3 BHK 111.7 43 43 0
100%
3 BHK 121.9 15 15 0
100%
3 BHK 122.75 43 42 1
98%
4 BHK 149.45 15 15 0
100%
4 BHK 150.25 43 43 0
100%

Construction Progress

TOWER 1

Basement (if any)100%

Tower 1

Excavation100%

TOWER 1

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%

Tower 1

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate95%

TOWER 1

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Tower 1

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing98%

TOWER 1

Plinth100%
Podiums (if any) 100%

Tower 1

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises95%

TOWER 1

Sanitary Fittings within the flats / premises95%
Slabs of Super Structure100%

Tower 1

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.95%

TOWER 1

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%

Tower 1

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing95%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space
Childrens Play Area
Club House with Gymnasium Steam and Sauna 50%
Community Buildings
Counter for Refreshment Bar
Electrical Meter Room, Sub-Station, Receiving Station 95%
Energy management 60%
Fire Protection And Fire Safety Requirements 95%
Grill Bar
Landscaping & Tree Planting
Open Parking
Outdoor Pavillion
Podium RCC Structure for Tower 1 90%
Pool Deck
Senior Citizen Corner
Sewerage (Chamber, Lines, Septic Tank , STP) 80%
Solid Waste Management And Disposal
Storm Water Drains 40%
Street Lighting
Swimming Pool
Treatment And Disposal Of Sewage And Sullage Water 80%
Water Conservation, Rain water Harvesting 50%
Water Supply 60%
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.