Shubhada Co-operative Housing Society Ltd.

by BHOOMIVIJAY PROPERTIES PRIVATE LIMITED Company
Certificate Signed P51800001693
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51800001693
Registration No.
REA51800006312
Registration Date
2023-06-01
Developer
BHOOMIVIJAY PROPERTIES PRIVATE LIMITED Company
Architect
Vartak Consultants Pvt Ltd
Project Bank
KOTAK MAHINDRA BANK LIMITED
Proposed Possession
2021-06-30
Revised Possession
2021-06-30
Extended Possession
2026-06-30
Total Units
43
Units Sold
22 (51%)
Buildings
3
Project Area
2975.10 sq.m
Total FSI
7424.96
Approved FSI
3374.96
MahaRERA QR
Shubhada Co-operative Housing Society Ltd.
MahaRERA — P51800001693
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors10
Sanctioned10
🏠Habitable7
🔢Total Units11
🏡Residential11
⬇️Basements1
🚗Open Parking3
🅿️Closed Parking49
📅Completion2020-12-31
🏗️Proposed Floors10
Sanctioned10
🔢Total Units20
🏡Residential20
⬇️Basements1
🚗Open Parking5
🅿️Closed Parking49
📅Completion2020-12-31
🏗️Proposed Floors10
Sanctioned10
🔢Total Units12
🏡Residential12
⬇️Basements1
🅿️Closed Parking42
📅Completion2020-12-31

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
2 Bhk Tenant 70.45999908447266 0 0 0
0%
2Bhk 59.43000030517578 0 0 0
0%
2Bhk 70.45999908447266 0 0 0
0%
3 Bhk Tenant 90.05000305175781 0 0 0
0%
3 Bhk Tenant 93.30000305175781 0 0 0
0%
3 Bhk Tenant 96.56999969482422 0 0 0
0%
3 Bhk Tenant 102.44999694824219 0 0 0
0%
3 Bhk Tenant 114.30000305175781 0 0 0
0%
3 Bhk Tenant 118.51000213623047 0 0 0
0%
3Bhk 90.05000305175781 0 0 0
0%
3Bhk 96.56999969482422 0 0 0
0%
3Bhk 102.44999694824219 0 0 0
0%
3Bhk 114.30000305175781 0 0 0
0%
3Bhk 118.51000213623047 0 0 0
0%

Shubhada Wing - A

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 70.46 3 2 1
67%
2 BHK Tenant 70.46 1 1 0
100%
3 BHK 96.57 5 1 4
20%
3 BHK Tenant 96.57 2 2 0
100%

Shubhada Wing - B

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 59.43 2 2 0
100%
3 BHK 90.05 1 0 1
0%
3 BHK 102.45 6 3 3
50%
3 BHK 118.51 4 3 1
75%
3 BHK Tenant 90.05 3 3 0
100%
3 BHK Tenant 102.45 1 1 0
100%
3 BHK Tenant 118.51 3 3 0
100%

Shubhada Wing - C

Type Carpet (sq.ft) Total Booked Available Status
3 BHK 114.3 5 3 2
60%
3 BHK Tenant 93.3 3 3 0
100%
3 BHK Tenant 114.3 4 4 0
100%

Construction Progress

Shubhada Wing - A

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

Shubhada Wing - B

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

Shubhada Wing - C

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements 100%
Fitness Center
Landscaping & Tree Planting 90%
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP) 100%
Solid Waste Management And Disposal
Storm Water Drains 100%
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting 100%
Water Supply 100%
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.