📞 +91 98200 30685✉️
RERA: A51800043517

Crystal Spires

by Luxora Realtors Private Limited Company
Certificate SignedP51700009216

Project Information

RERA Certificate No.
P51700009216
Registration No.
REA51700012520
Registration Date
2021-03-02
Developer
Luxora Realtors Private Limited Company
Architect
Arch Shashikant Deshmukh
Project Bank
IDFC First Bank Ltd
Proposed Possession
2021-01-31
Revised Possession
2021-01-31
Extended Possession
2023-06-30
Units Sold
0
Buildings
3
Project Area
7300.00 sq.m
Total FSI
21347.05
Approved FSI
15870.70
MahaRERA QR
Crystal Spires
MahaRERA — P51700009216
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors30
Sanctioned30
⬇️Basements1
🅿️Closed Parking162
📅Completion2020-07-31
🏗️Proposed Floors7
Sanctioned7
🅿️Closed Parking56
📅Completion2020-07-31
🏗️Proposed Floors23
Sanctioned23
⬇️Basements1
🅿️Closed Parking140
📅Completion2020-07-31

Apartment Configurations

T4 Crystal Spires 2

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK36.3110
100%
1 BHK36.62110
100%
1 BHK37.87110
100%
1 BHK37.95110
100%
2 BHK72.1214140
100%
2 BHK73.26330
100%
2 BHK73.3514140
100%
2.5 BHK80.9314140
100%
2.5 BHK82.3817170
100%
4 BHK127.96330
100%
4 BHK128.62110
100%
4 BHK173.1714140
100%
4 BHK173.2110
100%
Studio22.66110
100%
Studio33.37220
100%
Studio36.93110
100%

T5 Crystal Spires 1 From 19Th To 25Th Floors

TypeCarpet (sq.ft)TotalBookedAvailableStatus
3 BHK106.46770
100%
3 BHK110.74770
100%
3 BHK125.3214140
100%

T5 Crystal Spires 1 Upto 18Th Floors

TypeCarpet (sq.ft)TotalBookedAvailableStatus
3 BHK106.37110
100%
3 BHK106.4617170
100%
3 BHK106.56110
100%
3 BHK110.64110
100%
3 BHK110.7418180
100%
3 BHK125.3234340
100%
DUPLEX227.42220
100%

None

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1Bhk36.29999923706055000
0%
1Bhk36.619998931884766000
0%
1Bhk37.869998931884766000
0%
1Bhk37.95000076293945000
0%
2.5 Bhk82.37999725341797000
0%
2.5Bhk80.93000030517578000
0%
2Bhk72.12000274658203000
0%
2Bhk73.26000213623047000
0%
2Bhk73.3499984741211000
0%
3 Bhk125.31999969482422000
0%
3Bhk106.37000274658203000
0%
3Bhk106.45999908447266000
0%
3Bhk106.55999755859375000
0%
3Bhk110.63999938964844000
0%
3Bhk110.73999786376953000
0%
3Bhk125.31999969482422000
0%
4Bhk127.95999908447266000
0%
4Bhk128.6199951171875000
0%
4Bhk173.1699981689453000
0%
4Bhk173.1999969482422000
0%
Duplex227.4199981689453000
0%
Studio22.65999984741211000
0%
Studio33.369998931884766000
0%
Studio36.93000030517578000
0%

Construction Progress

T4 CRYSTAL SPIRES 2

Basement (if any)100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any) 100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

T4 Crystal Spires 2

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing100%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

T5 CRYSTAL SPIRES 1 FROM 19TH TO 25TH FLOORS

Basement (if any)0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth0%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

T5 CRYSTAL SPIRES 1 UPTO 18TH FLOORS

Basement (if any)100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any) 100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

T5 Crystal Spires 1 From 19Th To 25Th Floors

Excavation0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing60%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure100%

T5 Crystal Spires 1 Upto 18Th Floors

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing100%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space100%
Community Buildings100%
Electrical Meter Room, Sub-Station, Receiving Station100%
Energy management100%
Fire Protection And Fire Safety Requirements100%
GYM100%
Landscaping & Tree Planting100%
Open Parking
SWIMMING POOL100%
Sewerage (Chamber, Lines, Septic Tank , STP)100%
Solid Waste Management And Disposal100%
Storm Water Drains100%
Street Lighting100%
Treatment And Disposal Of Sewage And Sullage Water100%
Water Conservation, Rain water Harvesting100%
Water Supply100%
CallWhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.