CRYSTAL SPIRES

by LUXORA REALTORS PRIVATE LIMITED Company
Certificate Signed P51700009216
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51700009216
Registration No.
REA51700012520
Registration Date
2021-03-02
Developer
LUXORA REALTORS PRIVATE LIMITED Company
Architect
Arch Shashikant Deshmukh
Project Bank
IDFC First Bank Ltd
Proposed Possession
2021-01-31
Revised Possession
2021-01-31
Extended Possession
2023-06-30
Units Sold
0
Buildings
3
Project Area
7300.00 sq.m
Total FSI
21347.05
Approved FSI
15870.70
MahaRERA QR
CRYSTAL SPIRES
MahaRERA — P51700009216
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors30
Sanctioned30
⬇️Basements1
🅿️Closed Parking162
📅Completion2020-07-31
🏗️Proposed Floors7
Sanctioned7
🅿️Closed Parking56
📅Completion2020-07-31
🏗️Proposed Floors23
Sanctioned23
⬇️Basements1
🅿️Closed Parking140
📅Completion2020-07-31

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
1Bhk 36.29999923706055 0 0 0
0%
1Bhk 36.619998931884766 0 0 0
0%
1Bhk 37.869998931884766 0 0 0
0%
1Bhk 37.95000076293945 0 0 0
0%
2.5 Bhk 82.37999725341797 0 0 0
0%
2.5Bhk 80.93000030517578 0 0 0
0%
2Bhk 72.12000274658203 0 0 0
0%
2Bhk 73.26000213623047 0 0 0
0%
2Bhk 73.3499984741211 0 0 0
0%
3 Bhk 125.31999969482422 0 0 0
0%
3Bhk 106.37000274658203 0 0 0
0%
3Bhk 106.45999908447266 0 0 0
0%
3Bhk 106.55999755859375 0 0 0
0%
3Bhk 110.63999938964844 0 0 0
0%
3Bhk 110.73999786376953 0 0 0
0%
3Bhk 125.31999969482422 0 0 0
0%
4Bhk 127.95999908447266 0 0 0
0%
4Bhk 128.6199951171875 0 0 0
0%
4Bhk 173.1699981689453 0 0 0
0%
4Bhk 173.1999969482422 0 0 0
0%
Duplex 227.4199981689453 0 0 0
0%
Studio 22.65999984741211 0 0 0
0%
Studio 33.369998931884766 0 0 0
0%
Studio 36.93000030517578 0 0 0
0%

T4 Crystal Spires 2

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 36.3 1 1 0
100%
1 BHK 36.62 1 1 0
100%
1 BHK 37.87 1 1 0
100%
1 BHK 37.95 1 1 0
100%
2 BHK 72.12 14 14 0
100%
2 BHK 73.26 3 3 0
100%
2 BHK 73.35 14 14 0
100%
2.5 BHK 80.93 14 14 0
100%
2.5 BHK 82.38 17 17 0
100%
4 BHK 127.96 3 3 0
100%
4 BHK 128.62 1 1 0
100%
4 BHK 173.17 14 14 0
100%
4 BHK 173.2 1 1 0
100%
Studio 22.66 1 1 0
100%
Studio 33.37 2 2 0
100%
Studio 36.93 1 1 0
100%

T5 Crystal Spires 1 From 19Th To 25Th Floors

Type Carpet (sq.ft) Total Booked Available Status
3 BHK 106.46 7 7 0
100%
3 BHK 110.74 7 7 0
100%
3 BHK 125.32 14 14 0
100%

T5 Crystal Spires 1 Upto 18Th Floors

Type Carpet (sq.ft) Total Booked Available Status
3 BHK 106.37 1 1 0
100%
3 BHK 106.46 17 17 0
100%
3 BHK 106.56 1 1 0
100%
3 BHK 110.64 1 1 0
100%
3 BHK 110.74 18 18 0
100%
3 BHK 125.32 34 34 0
100%
DUPLEX 227.42 2 2 0
100%

Construction Progress

T4 CRYSTAL SPIRES 2

Basement (if any)100%

T4 Crystal Spires 2

Excavation100%

T4 CRYSTAL SPIRES 2

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

T4 Crystal Spires 2

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

T4 CRYSTAL SPIRES 2

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

T4 Crystal Spires 2

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing100%

T4 CRYSTAL SPIRES 2

Plinth100%
Podiums (if any) 100%

T4 Crystal Spires 2

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

T4 CRYSTAL SPIRES 2

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

T4 Crystal Spires 2

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

T4 CRYSTAL SPIRES 2

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

T4 Crystal Spires 2

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

T5 CRYSTAL SPIRES 1 FROM 19TH TO 25TH FLOORS

Basement (if any)0%

T5 Crystal Spires 1 From 19Th To 25Th Floors

Excavation0%

T5 CRYSTAL SPIRES 1 FROM 19TH TO 25TH FLOORS

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

T5 Crystal Spires 1 From 19Th To 25Th Floors

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

T5 CRYSTAL SPIRES 1 FROM 19TH TO 25TH FLOORS

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

T5 Crystal Spires 1 From 19Th To 25Th Floors

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing60%

T5 CRYSTAL SPIRES 1 FROM 19TH TO 25TH FLOORS

Plinth0%
Podiums (if any) 0%

T5 Crystal Spires 1 From 19Th To 25Th Floors

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

T5 CRYSTAL SPIRES 1 FROM 19TH TO 25TH FLOORS

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

T5 Crystal Spires 1 From 19Th To 25Th Floors

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

T5 CRYSTAL SPIRES 1 FROM 19TH TO 25TH FLOORS

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

T5 Crystal Spires 1 From 19Th To 25Th Floors

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure100%

T5 CRYSTAL SPIRES 1 UPTO 18TH FLOORS

Basement (if any)100%

T5 Crystal Spires 1 Upto 18Th Floors

Excavation100%

T5 CRYSTAL SPIRES 1 UPTO 18TH FLOORS

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

T5 Crystal Spires 1 Upto 18Th Floors

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

T5 CRYSTAL SPIRES 1 UPTO 18TH FLOORS

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

T5 Crystal Spires 1 Upto 18Th Floors

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing100%

T5 CRYSTAL SPIRES 1 UPTO 18TH FLOORS

Plinth100%
Podiums (if any) 100%

T5 Crystal Spires 1 Upto 18Th Floors

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

T5 CRYSTAL SPIRES 1 UPTO 18TH FLOORS

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

T5 Crystal Spires 1 Upto 18Th Floors

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

T5 CRYSTAL SPIRES 1 UPTO 18TH FLOORS

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

T5 Crystal Spires 1 Upto 18Th Floors

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space 100%
Community Buildings 100%
Electrical Meter Room, Sub-Station, Receiving Station 100%
Energy management 100%
Fire Protection And Fire Safety Requirements 100%
GYM 100%
Landscaping & Tree Planting 100%
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP) 100%
Solid Waste Management And Disposal 100%
Storm Water Drains 100%
Street Lighting 100%
SWIMMING POOL 100%
Treatment And Disposal Of Sewage And Sullage Water 100%
Water Conservation, Rain water Harvesting 100%
Water Supply 100%
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.