Proposed Possession
2027-08-31
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Units Sold
0
Buildings
1
Project Area
6980.00 sq.m
Total FSI
36919.00
Approved FSI
26664.13
MahaRERA QR
Dosti Desire - Phase 2
MahaRERA — P51700049421
Scan to verify on MahaRERA portal

Wing-wise Details

⬇️Basements2
🅿️Closed Parking461
📅Completion2027-08-31

Apartment Configurations

Dosti Eden - Wing A And Wing B / Building No 1 -

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 44.34 6 4 2
67%
2 BHK 57.07 71 44 27
62%
2 BHK 61.87 95 70 25
74%
3 BHK 72.03 6 5 1
83%
3 BHK 82.52 32 14 18
44%
3 BHK 85.14 25 9 16
36%
3 BHK 88.26 34 27 7
79%
3 BHK 91.28 33 28 5
85%
Shop 22.13 1 1 0
100%
Shop 23.41 1 1 0
100%
Shop 25.27 1 1 0
100%
Shop 30.55 1 1 0
100%
Shop 45.74 1 1 0
100%
Shop 46.23 1 1 0
100%
Shop 48.82 1 1 0
100%
Shop 53.47 1 1 0
100%
Shop 55.27 1 1 0
100%
Shop 59.23 1 1 0
100%

Construction Progress

Dosti Eden - Wing A And Wing B / Building No 1 -

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises5%
Overall Percentage of Completion of the work done For the entire Building /Wing46%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure55%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.