📞 +91 98200 30685 ✉️
RERA: A51800043517

Dotom Desire

by Dotom Ventures Partnership
Certificate Signed P51900017691
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51900017691
Registration No.
REA51900042584
Registration Date
2023-01-03
Developer
Dotom Ventures Partnership
Architect
Ketan Musale
Project Bank
HDFC BANK
Proposed Possession
2023-12-30
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Units Sold
0
Buildings
1
Project Area
528.90 sq.m
Total FSI
3178.64
Approved FSI
3178.64
MahaRERA QR
Dotom Desire
MahaRERA — P51900017691
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors25
Sanctioned25
🅿️Closed Parking1
📅Completion2022-12-31

Apartment Configurations

Dotom Desire

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 0.093 1 1 0
100%
2 BHK 2.05 1 1 0
100%
2 BHK 4.0 3 3 0
100%
2 BHK 7.07 1 1 0
100%
2 BHK 8.55 1 1 0
100%
2 BHK 10.04 1 1 0
100%
2 BHK 31.59 1 1 0
100%
2 BHK 52.11 5 5 0
100%
2 BHK 59.09 4 4 0
100%
2 BHK 61.72 1 1 0
100%
2 BHK 66.84 1 0 1
0%
2 BHK 69.68 2 1 1
50%
Shop 10.35 1 1 0
100%
Shop 77.28 1 0 1
0%

Construction Progress

DOTOM DESIRE

Basement (if any)100%

Dotom Desire

Excavation100%

DOTOM DESIRE

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Dotom Desire

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

DOTOM DESIRE

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Dotom Desire

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises10%

DOTOM DESIRE

Plinth100%
Podiums (if any) 100%

Dotom Desire

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

DOTOM DESIRE

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Dotom Desire

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.10%

DOTOM DESIRE

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Dotom Desire

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure78%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.