📞 +91 98200 30685 ✉️
RERA: A51800043517

EKTA TRIPOLIS PHASE II

by EKTA EVERGLADE HOMES PRIVATE LIMITED Company
Certificate Signed P51800000731
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51800000731
Registration No.
REA51800005369
Registration Date
2024-10-08
Developer
EKTA EVERGLADE HOMES PRIVATE LIMITED Company
Architect
Sameer
Proposed Possession
2022-06-30
Revised Possession
2022-06-30
Extended Possession
2024-12-31
Units Sold
0
Buildings
1
Project Area
1729.72 sq.m
Total FSI
25777.25
Approved FSI
20297.25
MahaRERA QR
EKTA TRIPOLIS PHASE II
MahaRERA — P51800000731
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors43
Sanctioned43
⬇️Basements1
🚗Open Parking12
🅿️Closed Parking1
📅Completion2021-12-31

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
2Bhk 67.5999984741211 0 0 0
0%
3 Bhk Type 1 80.05999755859375 0 0 0
0%
3 Bhk Type Ii 95.76000213623047 0 0 0
0%
3 Bhk Type Iii 105.61000061035156 0 0 0
0%
3 Bhk Type Iv 123.51000213623047 0 0 0
0%
3 Bhk Type V 145.47999572753906 0 0 0
0%
Shop No 45 46 41.5099983215332 0 0 0
0%
Shop No 47 48 41.5099983215332 0 0 0
0%
Shop No 49 50 52.13999938964844 0 0 0
0%
Shop No 51 42.61000061035156 0 0 0
0%
Shop No 52 53 54 59.88999938964844 0 0 0
0%
Shop No 55 56 41.5099983215332 0 0 0
0%
Shop No 57 41.5099983215332 0 0 0
0%
Shop No 58 41.5099983215332 0 0 0
0%
Shop No 59 41.5099983215332 0 0 0
0%
Shop No 60 48.63999938964844 0 0 0
0%
Shop No 61 48.619998931884766 0 0 0
0%
Shop No 62 41.4900016784668 0 0 0
0%
Shop No 63 38.310001373291016 0 0 0
0%
Shop No 64 44.599998474121094 0 0 0
0%
Shop No 65 41.5099983215332 0 0 0
0%
Shop No 66 38.459999084472656 0 0 0
0%
Shop No 67 40.91999816894531 0 0 0
0%
Shop No 68 60.2400016784668 0 0 0
0%
Shop No 69 41.40999984741211 0 0 0
0%
Shop No 70 41.5099983215332 0 0 0
0%
Shop No 71 41.5099983215332 0 0 0
0%
Shop No 72 41.5099983215332 0 0 0
0%
Shop No 73 41.5099983215332 0 0 0
0%
Shop No 74 38.88999938964844 0 0 0
0%

Wing C

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 67.6 61 57 4
93%
3 BHK TYPE 1 80.06 70 44 26
63%
3 BHK TYPE II 95.76 70 51 19
73%
3 BHK TYPE III 173.21 1 1 0
100%
4 BHK TYPE I 241.24 1 0 1
0%
4 BHK TYPE II 203.57 1 0 1
0%
SHOP NO 45 46 41.51 1 1 0
100%
SHOP NO 47 48 41.51 1 0 1
0%
SHOP NO 49 50 52.14 1 0 1
0%
SHOP NO 51 42.61 1 0 1
0%
SHOP NO 52 53 54 59.89 1 0 1
0%
SHOP NO 55 56 41.51 1 1 0
100%
SHOP NO 57 41.51 1 0 1
0%
SHOP NO 58 41.51 1 0 1
0%
SHOP NO 59 41.51 1 0 1
0%
SHOP NO 60 48.64 1 0 1
0%
SHOP NO 61 48.62 1 0 1
0%
SHOP NO 62 41.49 1 0 1
0%
SHOP NO 63 38.31 1 1 0
100%
SHOP NO 64 44.6 1 0 1
0%
SHOP NO 65 41.51 1 0 1
0%
SHOP NO 66 38.46 1 0 1
0%
SHOP NO 67 40.92 1 0 1
0%
SHOP NO 68 60.24 1 0 1
0%
SHOP NO 69 41.41 1 0 1
0%
SHOP NO 70 41.51 1 0 1
0%
SHOP NO 71 41.51 1 0 1
0%
SHOP NO 72 41.51 1 0 1
0%
SHOP NO 73 41.51 1 0 1
0%
SHOP NO 74 38.89 1 0 1
0%

Construction Progress

WING C

Basement (if any)100%

Wing C

Excavation100%

WING C

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%

Wing C

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate30%

WING C

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.85%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%

Wing C

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises50%
Overall Percentage of Completion of the work done For the entire Building /Wing68%

WING C

Plinth100%
Podiums (if any) 100%

Wing C

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

WING C

Sanitary Fittings within the flats / premises40%
Slabs of Super Structure100%

Wing C

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.40%

WING C

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%

Wing C

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing60%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space
CHILDREN PLAY AREA
Community Buildings
E Charging Car Point
Electrical Meter Room, Sub-Station, Receiving Station 30%
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
LAWN
MAZE GARDEN
MEDITATION AREA
Open Parking
OUTDOOR CHESS BOARD
RESTING PAVILION
SEATING AREAS FORMING PART OF LANDSCAPE
Sewerage (Chamber, Lines, Septic Tank , STP) 30%
Solid Waste Management And Disposal
Storm Water Drains 100%
Street Lighting
SWINGING CORNER
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting 100%
Water Supply 25%
YOGA PLAZA
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.