Project Information

RERA Certificate No.
P51800005021
Registration No.
REA51800014747
Registration Date
2021-09-10
Developer
EKTA HOUSING PRIVATE LIMITED Company
Architect
A R Mehta & Associates
Project Bank
HDFC BANK
Proposed Possession
2022-12-30
Revised Possession
2022-12-30
Extended Possession
1900-01-01
Units Sold
0
Buildings
3
Project Area
2785.10 sq.m
Total FSI
9160.98
Approved FSI
3246.35
MahaRERA QR
EKTA TRINITY
MahaRERA — P51800005021
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors16
Sanctioned16
📅Completion2021-12-31
🏗️Proposed Floors17
Sanctioned17
📅Completion2021-12-31
🏗️Proposed Floors17
Sanctioned17
📅Completion2021-12-31

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
1 Bhk Type 1 43.779998779296875 0 0 0
0%
1 Bhk Type 2 53.91999816894531 0 0 0
0%
1 Bhk Type 3 54.20000076293945 0 0 0
0%
1 Bhk Type4 54.2599983215332 0 0 0
0%
2 Bhk Type 1 73.43000030517578 0 0 0
0%
2 Bhk Type 10 82.23999786376953 0 0 0
0%
2 Bhk Type 11 82.44999694824219 0 0 0
0%
2 Bhk Type 2 73.73999786376953 0 0 0
0%
2 Bhk Type 3 77.63999938964844 0 0 0
0%
2 Bhk Type 4 77.94000244140625 0 0 0
0%
2 Bhk Type 5 78.63999938964844 0 0 0
0%
2 Bhk Type 6 78.80000305175781 0 0 0
0%
2 Bhk Type 7 78.94999694824219 0 0 0
0%
2 Bhk Type 8 79.12999725341797 0 0 0
0%
2 Bhk Type 9 82.12000274658203 0 0 0
0%
3 Bhk Type 1 105.16999816894531 0 0 0
0%
3 Bhk Type 2 107.2300033569336 0 0 0
0%
3 Bhk Type 3 108.43000030517578 0 0 0
0%
3 Bhk Type 4 109.47000122070312 0 0 0
0%
3 Bhk Type 5 115.25 0 0 0
0%
3 Bhk Type 6 117.5999984741211 0 0 0
0%
3 Bhk Type 7 119.83999633789062 0 0 0
0%
3 Bhk Type 8 122.5199966430664 0 0 0
0%
3 Bhk Type 9 126.1500015258789 0 0 0
0%

Wing A

Type Carpet (sq.ft) Total Booked Available Status
3 BHK TYPE 1 105.17 4 3 1
75%
3 BHK TYPE 2 107.23 4 4 0
100%
3 BHK TYPE 3 108.43 1 1 0
100%
3 BHK TYPE 4 109.47 1 1 0
100%
3 BHK TYPE 5 115.25 9 9 0
100%
3 BHK TYPE 6 117.6 3 3 0
100%
3 BHK TYPE 7 119.84 3 3 0
100%
3 BHK TYPE 8 122.52 1 1 0
100%
3 BHK TYPE 9 126.15 2 2 0
100%

Wing C

Type Carpet (sq.ft) Total Booked Available Status
1 BHK TYPE 1 43.78 1 1 0
100%
1 BHK TYPE 2 53.92 1 1 0
100%
1 BHK TYPE 3 54.2 1 1 0
100%
1 BHK TYPE4 54.26 1 1 0
100%
2 BHK TYPE 1 73.43 3 3 0
100%
2 BHK TYPE 10 82.24 1 1 0
100%
2 BHK TYPE 11 82.45 3 3 0
100%
2 BHK TYPE 2 73.74 3 3 0
100%
2 BHK TYPE 3 77.64 5 5 0
100%
2 BHK TYPE 4 77.94 5 5 0
100%
2 BHK TYPE 5 78.64 1 1 0
100%
2 BHK TYPE 6 78.8 1 1 0
100%
2 BHK TYPE 7 78.95 1 1 0
100%
2 BHK TYPE 8 79.13 1 1 0
100%
2 BHK TYPE 9 82.12 2 2 0
100%

Construction Progress

WING A

Basement (if any)100%

Wing A

Excavation100%

WING A

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.98%

Wing A

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate90%

WING A

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises98%

Wing A

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises98%

WING A

Plinth100%
Podiums (if any) 100%

Wing A

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises53%

WING A

Sanitary Fittings within the flats / premises53%
Slabs of Super Structure100%

Wing A

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.98%

WING A

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks98%

Wing A

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing98%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

WING B

Basement (if any)100%

Wing B

Excavation100%

WING B

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.98%

Wing B

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate90%

WING B

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises98%

Wing B

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises98%

WING B

Plinth100%
Podiums (if any) 100%

Wing B

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises53%

WING B

Sanitary Fittings within the flats / premises53%
Slabs of Super Structure100%

Wing B

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.98%

WING B

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks98%

Wing B

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing98%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

WING C

Basement (if any)100%

Wing C

Excavation100%

WING C

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.98%

Wing C

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate90%

WING C

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises98%

Wing C

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises98%

WING C

Plinth100%
Podiums (if any) 100%

Wing C

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises53%

WING C

Sanitary Fittings within the flats / premises53%
Slabs of Super Structure100%

Wing C

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.98%

WING C

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks98%

Wing C

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing98%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space
Children Play Area
COMMON BASEMENTS AND PODIUM 100%
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
GYMNASIUM
Landscaping & Tree Planting
Lawn
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Swimming Pool
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.