📞 +91 98200 30685 ✉️
RERA: A51800043517

EKTA VERVE

by EKTA WORLD PRIVATE LIMITED Company
Certificate Signed P51800021089
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51800021089
Registration No.
REA51800056914
Registration Date
2021-09-08
Developer
EKTA WORLD PRIVATE LIMITED Company
Architect
Yms Consultants Ltd.
Project Bank
HDFC BANK
Proposed Possession
2024-04-30
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Units Sold
0
Buildings
1
Project Area
1063.60 sq.m
Total FSI
3158.89
MahaRERA QR
EKTA VERVE
MahaRERA — P51800021089
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors19
Sanctioned19
⬇️Basements1
🅿️Closed Parking49
📅Completion2023-04-30

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
3 Bhk Type 1 107.69999694824219 0 0 0
0%
3 Bhk Type 2 110.44999694824219 0 0 0
0%
3 Bhk Type 3 80.04000091552734 0 0 0
0%
4 Bhk 160.6199951171875 0 0 0
0%
5 Bhk Type 1 221.39999389648438 0 0 0
0%
5 Bhk Type 2 189.64999389648438 0 0 0
0%
Duplex 302.0199890136719 0 0 0
0%

Verve

Type Carpet (sq.ft) Total Booked Available Status
3 BHK TYPE 1 107.7 3 2 1
67%
3 BHK TYPE 2 110.45 3 3 0
100%
3 BHK TYPE 3 80.04 1 1 0
100%
4 BHK 160.62 1 1 0
100%
5 BHK TYPE 1 221.4 8 7 1
88%
5 BHK TYPE 2 189.65 1 1 0
100%
DUPLEX 302.02 1 0 1
0%

Construction Progress

VERVE

Basement (if any)100%

Verve

Excavation100%

VERVE

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Verve

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate70%

VERVE

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.70%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%

Verve

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises80%

VERVE

Plinth100%
Podiums (if any) 100%

Verve

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises7%

VERVE

Sanitary Fittings within the flats / premises7%
Slabs of Super Structure100%

Verve

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

VERVE

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Verve

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station 50%
Energy management
Fire Protection And Fire Safety Requirements 50%
GYMNASIUM
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP) 100%
Sky Lounge on Terrace Level
SOCIETY OFFICE
Solid Waste Management And Disposal
Storm Water Drains 85%
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting 100%
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.