📞 +91 98200 30685✉️
RERA: A51800043517

Westbay

by Shraddha Shelters Pvt. Ltd. Company
Certificate SignedP51800001494

Project Information

RERA Certificate No.
P51800001494
Registration No.
REA51800006828
Registration Date
2021-09-09
Developer
Shraddha Shelters Pvt. Ltd. Company
Architect
Ram Aglave
Project Bank
HDFC BANK
Proposed Possession
2022-12-30
Revised Possession
2022-12-30
Extended Possession
1900-01-01
Units Sold
0
Buildings
1
Project Area
1324.00 sq.m
Total FSI
7408.93
Approved FSI
3523.35
MahaRERA QR
Westbay
MahaRERA — P51800001494
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors23
Sanctioned23
🅿️Closed Parking85
📅Completion2021-12-31

Apartment Configurations

Wing D

TypeCarpet (sq.ft)TotalBookedAvailableStatus
2 BHK Type 159.57110
100%
2 BHK Type 264.61110
100%
2 BHK Type 367.71110
100%
3 BHK Type 175.55550
100%
3 BHK Type 10117.86101
0%
3 BHK Type 11118.67110
100%
3 BHK Type 1295.08110
100%
3 BHK Type 1395.49110
100%
3 BHK Type 275.92110
100%
3 BHK Type 382.15440
100%
3 BHK Type 482.02101
0%
3 BHK Type 484.19110
100%
3 BHK Type 6108.321091
90%
3 BHK Type 8109.9710100
100%
3 BHK Type 9110.21091
90%
3 BHK type 589.79110
100%
3 BHK type 7109.12981
89%
4 BHK171.7101
0%
4 BHK217.15101
0%
5 BHK & more220.02101
0%
5 BHK & more220.97101
0%
MP Room22.45110
100%
MP Room22.96110
100%
MP Room24.39110
100%
MP Room27.81110
100%

None

TypeCarpet (sq.ft)TotalBookedAvailableStatus
2 Bhk Type 159.56999969482422000
0%
2 Bhk Type 264.61000061035156000
0%
2 Bhk Type 367.70999908447266000
0%
3 Bhk Type 175.55000305175781000
0%
3 Bhk Type 10117.86000061035156000
0%
3 Bhk Type 11118.66999816894531000
0%
3 Bhk Type 1295.08000183105469000
0%
3 Bhk Type 1395.48999786376953000
0%
3 Bhk Type 275.91999816894531000
0%
3 Bhk Type 382.1500015258789000
0%
3 Bhk Type 482.0199966430664000
0%
3 Bhk Type 484.19000244140625000
0%
3 Bhk Type 589.79000091552734000
0%
3 Bhk Type 6108.31999969482422000
0%
3 Bhk Type 7109.12000274658203000
0%
3 Bhk Type 8109.97000122070312000
0%
3 Bhk Type 9110.19999694824219000
0%
4Bhk171.6999969482422000
0%
4Bhk217.14999389648438000
0%
5Bhk &Amp;Amp;Amp; More220.02000427246094000
0%
5Bhk &Amp;Amp;Amp; More220.97000122070312000
0%
Mp Room22.450000762939453000
0%
Mp Room22.959999084472656000
0%
Mp Room24.389999389648438000
0%
Mp Room27.809999465942383000
0%

Construction Progress

Wing D

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing100%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

wing D

Basement (if any)100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any) 100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station25%
Energy management
Fire Protection And Fire Safety Requirements30%
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)50%
Solid Waste Management And Disposal
Storm Water Drains25%
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply45%
CallWhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.