📞 +91 98200 30685 ✉️
RERA: A51800043517

WESTBAY

by Shraddha Shelters Pvt. Ltd. Company
Certificate Signed P51800001494
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51800001494
Registration No.
REA51800006828
Registration Date
2021-09-09
Developer
Shraddha Shelters Pvt. Ltd. Company
Architect
Ram Aglave
Project Bank
HDFC BANK
Proposed Possession
2022-12-30
Revised Possession
2022-12-30
Extended Possession
1900-01-01
Units Sold
0
Buildings
1
Project Area
1324.00 sq.m
Total FSI
7408.93
Approved FSI
3523.35
MahaRERA QR
WESTBAY
MahaRERA — P51800001494
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors23
Sanctioned23
🅿️Closed Parking85
📅Completion2021-12-31

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
2 Bhk Type 1 59.56999969482422 0 0 0
0%
2 Bhk Type 2 64.61000061035156 0 0 0
0%
2 Bhk Type 3 67.70999908447266 0 0 0
0%
3 Bhk Type 1 75.55000305175781 0 0 0
0%
3 Bhk Type 10 117.86000061035156 0 0 0
0%
3 Bhk Type 11 118.66999816894531 0 0 0
0%
3 Bhk Type 12 95.08000183105469 0 0 0
0%
3 Bhk Type 13 95.48999786376953 0 0 0
0%
3 Bhk Type 2 75.91999816894531 0 0 0
0%
3 Bhk Type 3 82.1500015258789 0 0 0
0%
3 Bhk Type 4 82.0199966430664 0 0 0
0%
3 Bhk Type 4 84.19000244140625 0 0 0
0%
3 Bhk Type 5 89.79000091552734 0 0 0
0%
3 Bhk Type 6 108.31999969482422 0 0 0
0%
3 Bhk Type 7 109.12000274658203 0 0 0
0%
3 Bhk Type 8 109.97000122070312 0 0 0
0%
3 Bhk Type 9 110.19999694824219 0 0 0
0%
4Bhk 171.6999969482422 0 0 0
0%
4Bhk 217.14999389648438 0 0 0
0%
5Bhk &Amp;Amp;Amp; More 220.02000427246094 0 0 0
0%
5Bhk &Amp;Amp;Amp; More 220.97000122070312 0 0 0
0%
Mp Room 22.450000762939453 0 0 0
0%
Mp Room 22.959999084472656 0 0 0
0%
Mp Room 24.389999389648438 0 0 0
0%
Mp Room 27.809999465942383 0 0 0
0%

Wing D

Type Carpet (sq.ft) Total Booked Available Status
2 BHK Type 1 59.57 1 1 0
100%
2 BHK Type 2 64.61 1 1 0
100%
2 BHK Type 3 67.71 1 1 0
100%
3 BHK Type 1 75.55 5 5 0
100%
3 BHK Type 10 117.86 1 0 1
0%
3 BHK Type 11 118.67 1 1 0
100%
3 BHK Type 12 95.08 1 1 0
100%
3 BHK Type 13 95.49 1 1 0
100%
3 BHK Type 2 75.92 1 1 0
100%
3 BHK Type 3 82.15 4 4 0
100%
3 BHK Type 4 82.02 1 0 1
0%
3 BHK Type 4 84.19 1 1 0
100%
3 BHK type 5 89.79 1 1 0
100%
3 BHK Type 6 108.32 10 9 1
90%
3 BHK type 7 109.12 9 8 1
89%
3 BHK Type 8 109.97 10 10 0
100%
3 BHK Type 9 110.2 10 9 1
90%
4 BHK 171.7 1 0 1
0%
4 BHK 217.15 1 0 1
0%
5 BHK & more 220.02 1 0 1
0%
5 BHK & more 220.97 1 0 1
0%
MP Room 22.45 1 1 0
100%
MP Room 22.96 1 1 0
100%
MP Room 24.39 1 1 0
100%
MP Room 27.81 1 1 0
100%

Construction Progress

wing D

Basement (if any)100%

Wing D

Excavation100%

wing D

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Wing D

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

wing D

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Wing D

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing100%

wing D

Plinth100%
Podiums (if any) 100%

Wing D

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

wing D

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Wing D

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

wing D

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Wing D

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station 25%
Energy management
Fire Protection And Fire Safety Requirements 30%
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP) 50%
Solid Waste Management And Disposal
Storm Water Drains 25%
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply 45%
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.