📞 +91 98200 30685 ✉️
RERA: A51800043517

PALM AMORE

by VISION INFRA LLP Partnership
Certificate Signed P51700052377
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51700052377
Registration No.
REA51700143508
Registration Date
2023-08-21
Developer
VISION INFRA LLP Partnership
Architect
Dimensions Architects Pvt Ltd
Project Bank
HDFC BANK
Proposed Possession
2031-03-31
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Units Sold
0
Buildings
14
Project Area
22999.08 sq.m
Total FSI
129484.82
Approved FSI
129338.72
MahaRERA QR
PALM AMORE
MahaRERA — P51700052377
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors20
Sanctioned20
⬇️Basements4
🅿️Closed Parking144
📅Completion2031-03-31
🏗️Proposed Floors20
Sanctioned20
⬇️Basements4
🅿️Closed Parking142
📅Completion2031-03-31
🏗️Proposed Floors20
Sanctioned20
⬇️Basements4
🅿️Closed Parking142
📅Completion2031-03-31
🏗️Proposed Floors20
Sanctioned20
⬇️Basements4
🅿️Closed Parking142
📅Completion2031-03-31
🏗️Proposed Floors20
Sanctioned20
⬇️Basements4
🅿️Closed Parking141
📅Completion2031-03-31
🏗️Proposed Floors20
Sanctioned20
⬇️Basements4
🅿️Closed Parking152
📅Completion2031-03-31
🏗️Proposed Floors20
Sanctioned20
⬇️Basements4
🅿️Closed Parking132
📅Completion2031-03-31
🏗️Proposed Floors20
Sanctioned20
⬇️Basements4
🅿️Closed Parking132
📅Completion2031-03-31
🏗️Proposed Floors29
Sanctioned29
⬇️Basements4
🅿️Closed Parking138
📅Completion2031-03-31
🏗️Proposed Floors20
Sanctioned20
⬇️Basements4
🅿️Closed Parking138
📅Completion2031-03-31
🏗️Proposed Floors20
Sanctioned20
⬇️Basements4
🅿️Closed Parking138
📅Completion2031-03-31
🏗️Proposed Floors20
Sanctioned20
⬇️Basements4
🅿️Closed Parking132
📅Completion2031-03-31
🏗️Proposed Floors20
Sanctioned20
⬇️Basements4
🅿️Closed Parking132
📅Completion2031-03-31
🏗️Proposed Floors20
Sanctioned20
⬇️Basements4
🅿️Closed Parking132
📅Completion2031-03-31

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
2Bhk 75.30000305175781 0 0 0
0%
2Bhk 75.54000091552734 0 0 0
0%
2Bhk 75.68000030517578 0 0 0
0%
2Bhk 77.80999755859375 0 0 0
0%
2Bhk 82.4000015258789 0 0 0
0%
3Bhk 99.97000122070312 0 0 0
0%
3Bhk 100.62999725341797 0 0 0
0%
3Bhk 100.77999877929688 0 0 0
0%
3Bhk 103.31999969482422 0 0 0
0%
3Bhk 104.8499984741211 0 0 0
0%
3Bhk 105.0999984741211 0 0 0
0%
3Bhk 113.81999969482422 0 0 0
0%
3Bhk 114.2699966430664 0 0 0
0%
3Bhk 114.30000305175781 0 0 0
0%
3Bhk 117.9000015258789 0 0 0
0%
3Bhk 119.87999725341797 0 0 0
0%
3Bhk 130.17999267578125 0 0 0
0%
3Bhk 130.47999572753906 0 0 0
0%
3Bhk 138.1300048828125 0 0 0
0%
3Bhk 141.85000610351562 0 0 0
0%
4Bhk 141.85000610351562 0 0 0
0%
4Bhk 166.00999450683594 0 0 0
0%
4Bhk 194.22999572753906 0 0 0
0%
4Bhk 201.24000549316406 0 0 0
0%
4Bhk 207.3699951171875 0 0 0
0%
5Bhk & More 233.77000427246094 0 0 0
0%
Shop 32.810001373291016 0 0 0
0%
Shop 34.70000076293945 0 0 0
0%
Shop 38.91999816894531 0 0 0
0%
Shop 39.369998931884766 0 0 0
0%
Shop 39.83000183105469 0 0 0
0%
Shop 39.869998931884766 0 0 0
0%
Shop 40.47999954223633 0 0 0
0%
Shop 40.84000015258789 0 0 0
0%
Shop 40.97999954223633 0 0 0
0%
Shop 41.310001373291016 0 0 0
0%
Shop 42.0099983215332 0 0 0
0%
Shop 44.13999938964844 0 0 0
0%
Shop 44.189998626708984 0 0 0
0%
Shop 44.59000015258789 0 0 0
0%
Shop 44.66999816894531 0 0 0
0%
Shop 44.689998626708984 0 0 0
0%
Shop 44.77000045776367 0 0 0
0%
Shop 44.790000915527344 0 0 0
0%
Shop 44.939998626708984 0 0 0
0%
Shop 45.310001373291016 0 0 0
0%
Shop 45.58000183105469 0 0 0
0%
Shop 45.959999084472656 0 0 0
0%
Shop 46.41999816894531 0 0 0
0%
Shop 46.72999954223633 0 0 0
0%
Shop 46.88999938964844 0 0 0
0%
Shop 46.959999084472656 0 0 0
0%
Shop 47.06999969482422 0 0 0
0%
Shop 47.27000045776367 0 0 0
0%
Shop 47.790000915527344 0 0 0
0%
Shop 48.25 0 0 0
0%
Shop 48.41999816894531 0 0 0
0%
Shop 49.0 0 0 0
0%
Shop 49.22999954223633 0 0 0
0%
Shop 49.630001068115234 0 0 0
0%
Shop 50.599998474121094 0 0 0
0%
Shop 50.77000045776367 0 0 0
0%
Shop 51.20000076293945 0 0 0
0%
Shop 51.650001525878906 0 0 0
0%
Shop 51.77000045776367 0 0 0
0%
Shop 52.040000915527344 0 0 0
0%
Shop 53.31999969482422 0 0 0
0%
Shop 53.41999816894531 0 0 0
0%
Shop 53.58000183105469 0 0 0
0%
Shop 55.61000061035156 0 0 0
0%
Shop 55.86000061035156 0 0 0
0%
Shop 55.9900016784668 0 0 0
0%
Shop 58.790000915527344 0 0 0
0%
Shop 59.040000915527344 0 0 0
0%
Shop 60.95000076293945 0 0 0
0%
Shop 61.790000915527344 0 0 0
0%
Shop 62.45000076293945 0 0 0
0%
Shop 63.72999954223633 0 0 0
0%
Shop 65.2300033569336 0 0 0
0%
Shop 65.47000122070312 0 0 0
0%
Shop 65.48999786376953 0 0 0
0%
Shop 65.77999877929688 0 0 0
0%
Shop 66.19999694824219 0 0 0
0%
Shop 66.95999908447266 0 0 0
0%
Shop 67.38999938964844 0 0 0
0%
Shop 70.77999877929688 0 0 0
0%
Shop 71.58999633789062 0 0 0
0%
Shop 77.08000183105469 0 0 0
0%
Shop 78.2699966430664 0 0 0
0%
Shop 80.51000213623047 0 0 0
0%
Shop 84.27999877929688 0 0 0
0%
Shop 91.11000061035156 0 0 0
0%
Shop 115.80999755859375 0 0 0
0%

A-Wing

Type Carpet (sq.ft) Total Booked Available Status
3 BHK 119.882 30 2 28
7%
3 BHK 138.13 15 1 14
7%
4 BHK 194.227 2 0 2
0%
4 BHK 207.371 13 0 13
0%
Shop 38.916 1 1 0
100%
Shop 44.686 1 1 0
100%
Shop 45.31 1 0 1
0%
Shop 50.772 1 1 0
100%
Shop 55.608 1 1 0
100%
Shop 55.858 1 0 1
0%
Shop 70.783 1 1 0
100%
Shop 71.588 1 1 0
100%
Shop 84.284 1 1 0
100%

B-Wing

Type Carpet (sq.ft) Total Booked Available Status
3 BHK 103.317 2 1 1
50%
3 BHK 117.899 28 11 17
39%
4 BHK 166.011 30 2 28
7%
Shop 39.872 1 1 0
100%
Shop 40.48 1 1 0
100%
Shop 44.137 1 0 1
0%
Shop 44.669 1 0 1
0%
Shop 46.89 1 0 1
0%
Shop 49.628 1 1 0
100%
Shop 51.768 1 1 0
100%
Shop 52.042 1 1 0
100%
Shop 65.234 1 1 0
100%
Shop 65.779 1 1 0
100%

C Wing

Type Carpet (sq.ft) Total Booked Available Status
3 BHK 103.317 2 0 2
0%
3 BHK 117.899 28 4 24
14%
4 BHK 166.011 30 0 30
0%
Shop 40.84 1 0 1
0%
Shop 40.981 1 1 0
100%
Shop 44.589 1 1 0
100%
Shop 46.732 1 1 0
100%
Shop 47.068 1 1 0
100%
Shop 51.203 1 1 0
100%
Shop 53.417 1 0 1
0%
Shop 53.58 1 0 1
0%
Shop 66.203 1 1 0
100%
Shop 66.96 1 1 0
100%

D Wing

Type Carpet (sq.ft) Total Booked Available Status
3 BHK 103.317 2 0 2
0%
3 BHK 117.899 28 2 26
7%
4 BHK 166.011 30 1 29
3%
Shop 39.83 1 1 0
100%
Shop 41.31 1 1 0
100%
Shop 44.794 1 1 0
100%
Shop 44.942 1 1 0
100%
Shop 45.583 1 1 0
100%
Shop 45.958 1 1 0
100%
Shop 51.645 1 1 0
100%
Shop 53.315 1 1 0
100%
Shop 65.471 1 1 0
100%
Shop 67.393 1 1 0
100%

E Wing

Type Carpet (sq.ft) Total Booked Available Status
5 BHK & more 233.772 30 5 25
17%
Shop 44.768 1 1 0
100%
Shop 46.415 1 0 1
0%
Shop 48.253 1 1 0
100%
Shop 48.418 1 1 0
100%
Shop 58.787 1 1 0
100%
Shop 59.044 1 1 0
100%
Shop 77.081 1 1 0
100%
Shop 78.265 1 1 0
100%

F Wing

Type Carpet (sq.ft) Total Booked Available Status
3 BHK 130.475 2 0 2
0%
3 BHK 141.849 2 1 1
50%
4 BHK 141.853 26 7 19
27%
4 BHK 201.242 30 3 27
10%
Shop 39.366 1 1 0
100%
Shop 44.189 1 1 0
100%
Shop 47.265 1 0 1
0%
Shop 47.793 1 1 0
100%
Shop 49.001 1 1 0
100%
Shop 49.226 1 0 1
0%
Shop 50.6 1 0 1
0%
Shop 55.991 1 1 0
100%
Shop 60.95 1 1 0
100%
Shop 61.792 1 1 0
100%
Shop 62.449 1 0 1
0%
Shop 63.729 1 0 1
0%
Shop 65.49 1 1 0
100%
Shop 80.508 1 0 1
0%
Shop 91.11 1 1 0
100%
Shop 115.811 1 1 0
100%

G Wing

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 77.808 2 1 1
50%
3 BHK 100.629 28 6 22
21%
3 BHK 113.822 30 14 16
47%

H Wing

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 77.808 2 2 0
100%
3 BHK 100.629 28 11 17
39%
3 BHK 113.822 30 18 12
60%

I Wing

Type Carpet (sq.ft) Total Booked Available Status
3 BHK 99.972 15 4 11
27%
3 BHK 104.853 2 0 2
0%
3 BHK 114.272 28 1 27
4%
Shop 32.805 2 1 1
50%
Shop 34.703 2 0 2
0%
Shop 42.011 2 0 2
0%
Shop 46.961 2 0 2
0%

J Wing

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 82.403 2 2 0
100%
3 BHK 100.783 28 0 28
0%
3 BHK 114.3 30 0 30
0%
Shop 32.805 2 2 0
100%
Shop 34.703 2 2 0
100%
Shop 42.011 2 0 2
0%
Shop 46.961 2 2 0
100%

K Wing

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 75.3 15 1 14
7%
3 BHK 105.099 2 0 2
0%
3 BHK 114.296 28 0 28
0%
Shop 32.805 2 2 0
100%
Shop 34.703 2 2 0
100%
Shop 42.011 2 2 0
100%
Shop 46.961 2 2 0
100%

L Wing

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 75.539 28 5 23
18%
2 BHK 75.676 28 6 22
21%
3 BHK 130.177 2 1 1
50%

M Wing

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 75.539 28 8 20
29%
2 BHK 75.676 28 10 18
36%
3 BHK 130.177 2 1 1
50%

N Wing

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 75.539 28 11 17
39%
2 BHK 75.676 28 14 14
50%
3 BHK 130.177 2 1 1
50%

Construction Progress

A-WING

Basement (if any)90%

A-Wing

Excavation100%

A-WING

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

A-Wing

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

A-WING

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

A-Wing

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing16%

A-WING

Plinth90%
Podiums (if any) 0%

A-Wing

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

A-WING

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure31%

A-Wing

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

A-WING

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks27%

A-Wing

Stilt Floor90%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth60%
X number of Podiums0%
X number of Slabs of Super Structure0%

B-WING

Basement (if any)90%

B-Wing

Excavation100%

B-WING

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

B-Wing

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

B-WING

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

B-Wing

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing16%

B-WING

Plinth90%
Podiums (if any) 0%

B-Wing

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

B-WING

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure25%

B-Wing

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

B-WING

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks25%

B-Wing

Stilt Floor90%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth60%
X number of Podiums0%
X number of Slabs of Super Structure0%

C WING

Basement (if any)90%

C Wing

Excavation100%

C WING

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

C Wing

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

C WING

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

C Wing

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing12%

C WING

Plinth90%
Podiums (if any) 0%

C Wing

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

C WING

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure25%

C Wing

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

C WING

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks25%

C Wing

Stilt Floor90%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth20%
X number of Podiums0%
X number of Slabs of Super Structure0%

D WING

Basement (if any)25%

D Wing

Excavation100%

D WING

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

D Wing

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

D WING

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

D Wing

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing10%

D WING

Plinth25%
Podiums (if any) 0%

D Wing

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

D WING

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%

D Wing

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

D WING

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

D Wing

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

E WING

Basement (if any)90%

E Wing

Excavation100%

E WING

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

E Wing

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

E WING

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

E Wing

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%

E WING

Plinth90%
Podiums (if any) 0%

E Wing

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

E WING

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%

E Wing

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

E WING

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

E Wing

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth5%
X number of Podiums0%
X number of Slabs of Super Structure0%

F WING

Basement (if any)90%

F Wing

Excavation100%

F WING

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

F Wing

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

F WING

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

F Wing

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing10%

F WING

Plinth90%
Podiums (if any) 0%

F Wing

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

F WING

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%

F Wing

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

F WING

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

F Wing

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth5%
X number of Podiums0%
X number of Slabs of Super Structure0%

G WING

Basement (if any)0%

G Wing

Excavation100%

G WING

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

G Wing

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

G WING

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

G Wing

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing4%

G WING

Plinth0%
Podiums (if any) 0%

G Wing

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

G WING

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%

G Wing

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

G WING

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

G Wing

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

H WING

Basement (if any)0%

H Wing

Excavation80%

H WING

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

H Wing

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

H WING

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

H Wing

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing2%

H WING

Plinth0%
Podiums (if any) 0%

H Wing

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

H WING

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%

H Wing

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

H WING

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

H Wing

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

I WING

Basement (if any)0%

I Wing

Excavation0%

I WING

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

I Wing

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

I WING

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

I Wing

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%

I WING

Plinth0%
Podiums (if any) 0%

I Wing

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

I WING

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%

I Wing

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

I WING

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

I Wing

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

J WING

Basement (if any)0%

J Wing

Excavation0%

J WING

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

J Wing

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

J WING

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

J Wing

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%

J WING

Plinth0%
Podiums (if any) 0%

J Wing

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

J WING

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%

J Wing

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

J WING

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

J Wing

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

K WING

Basement (if any)0%

K Wing

Excavation0%

K WING

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

K Wing

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

K WING

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

K Wing

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%

K WING

Plinth0%
Podiums (if any) 0%

K Wing

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

K WING

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%

K Wing

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

K WING

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

K Wing

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

L WING

Basement (if any)0%

L Wing

Excavation100%

L WING

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

L Wing

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

L WING

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

L Wing

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%

L WING

Plinth0%
Podiums (if any) 0%

L Wing

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

L WING

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%

L Wing

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

L WING

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

L Wing

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

M WING

Basement (if any)5%

M Wing

Excavation100%

M WING

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

M Wing

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

M WING

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

M Wing

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing5%

M WING

Plinth5%
Podiums (if any) 0%

M Wing

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

M WING

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%

M Wing

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

M WING

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

M Wing

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

N WING

Basement (if any)5%

N Wing

Excavation100%

N WING

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

N Wing

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

N WING

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

N Wing

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing9%

N WING

Plinth5%
Podiums (if any) 0%

N Wing

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

N WING

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%

N Wing

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

N WING

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

N Wing

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.