Proposed Possession
2024-12-25
Revised Possession
2024-12-25
Extended Possession
1900-01-01
Total Units
180
Units Sold
33 (18%)
Buildings
3
Project Area
4390.30 sq.m
Total FSI
23901.71
Approved FSI
14156.00
MahaRERA QR
GARUDA SHATRUNJAY
MahaRERA — P51800011329
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors44
Sanctioned44
🏠Habitable34
🔢Total Units180
🏡Residential180
⬇️Basements1
🅿️Closed Parking96
📅Completion2024-12-25
🏗️Proposed Floors24
Sanctioned24
🏠Habitable24
📅Completion2024-12-25
🏗️Proposed Floors9
Sanctioned9
🏠Habitable3
⬇️Basements1
🅿️Closed Parking30
📅Completion2024-12-25

Apartment Configurations

Garuda Shatrunjay

Type Carpet (sq.ft) Total Booked Available Status
1.5 BHK 49.12 27 6 21
22%
1.5 BHK 50.52 1 0 1
0%
1.5 BHK 50.74 31 5 26
16%
2 BHK 72.43 5 0 5
0%
2.5 BHK 72.67 27 7 20
26%
2.5 BHK 80.09 32 3 29
9%
2.5 BHK 80.37 26 3 23
12%
2.5 BHK 82.7 26 8 18
31%
3.5 BHK 99.44 5 1 4
20%

Rehab Building

Type Carpet (sq.ft) Total Booked Available Status
COMMERCIAL 9.25 1 0 1
0%
COMMERCIAL 11.15 1 0 1
0%
COMMERCIAL 11.17 1 0 1
0%
COMMERCIAL 17.01 1 0 1
0%
RESI CUM COMMERCIAL 25.0 3 0 3
0%
RESI CUM COMMERCIAL 31.78 1 0 1
0%
RESIDENTIAL 25.16 218 0 218
0%

Reservation Building

Type Carpet (sq.ft) Total Booked Available Status
LODGINGROOM 453.55 1 0 1
0%

Construction Progress

GARUDA SHATRUNJAY

Basement (if any)100%

Garuda Shatrunjay

Excavation100%

GARUDA SHATRUNJAY

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Garuda Shatrunjay

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

GARUDA SHATRUNJAY

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Garuda Shatrunjay

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%

GARUDA SHATRUNJAY

Plinth100%
Podiums (if any) 100%

Garuda Shatrunjay

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

GARUDA SHATRUNJAY

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Garuda Shatrunjay

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

GARUDA SHATRUNJAY

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Garuda Shatrunjay

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

REHAB BUILDING

Basement (if any)0%

Rehab Building

Excavation0%

REHAB BUILDING

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Rehab Building

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

REHAB BUILDING

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

Rehab Building

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%

REHAB BUILDING

Plinth0%
Podiums (if any) 0%

Rehab Building

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

REHAB BUILDING

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%

Rehab Building

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.5%

REHAB BUILDING

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

Rehab Building

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure10%

RESERVATION BUILDING

Basement (if any)100%

Reservation Building

Excavation100%

RESERVATION BUILDING

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Reservation Building

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

RESERVATION BUILDING

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

Reservation Building

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%

RESERVATION BUILDING

Plinth100%
Podiums (if any) 100%

Reservation Building

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

RESERVATION BUILDING

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure24%

Reservation Building

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

RESERVATION BUILDING

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks5%

Reservation Building

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

RERA Registered Amenities

Aggregate area of recreational Open Space
BMS ROOM
Community Buildings 100%
DG SETS
Electrical Meter Room, Sub-Station, Receiving Station 95%
Energy management
ENTRANCE LOBBY
Fire Protection And Fire Safety Requirements 100%
FITNESS AREA
Landscaping & Tree Planting
Open Parking
PUMP ROOM
Sewerage (Chamber, Lines, Septic Tank , STP) 100%
Solid Waste Management And Disposal 100%
Storm Water Drains 100%
Street Lighting 30%
Treatment And Disposal Of Sewage And Sullage Water 100%
Water Conservation, Rain water Harvesting 80%
Water Supply 100%
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.