GAYATRI NIWAS
by RANJANA CONSTRUCTION PRIVATE LIMITED
Company
Project Information
RERA Certificate No.
P51800052812
Registration No.
REA51800141146
Registration Date
2023-10-05
Developer
RANJANA CONSTRUCTION PRIVATE LIMITED Company
Architect
Umesh Bhatt
Project Bank
ICICI BANK LIMITED
Proposed Possession
2026-12-31
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Units Sold
0
Buildings
2
Project Area
1809.20 sq.m
Total FSI
1915.76
Approved FSI
1915.76
GAYATRI NIWAS
MahaRERA — P51800052812
MahaRERA — P51800052812
Scan to verify on MahaRERA portal
Wing-wise Details
🏗️Proposed Floors11
✅Sanctioned11
🅿️Closed Parking18
📅Completion2026-12-31
Apartment Configurations
None
| Type | Carpet (sq.ft) | Total | Booked | Available | Status |
|---|---|---|---|---|---|
| 1Bhk | 23.030000686645508 | 0 | 0 | 0 | 0% |
| 1Bhk | 27.260000228881836 | 0 | 0 | 0 | 0% |
| 1Bhk | 29.040000915527344 | 0 | 0 | 0 | 0% |
| 1Bhk | 32.040000915527344 | 0 | 0 | 0 | 0% |
| 1Bhk | 33.33000183105469 | 0 | 0 | 0 | 0% |
| 1Bhk | 33.7599983215332 | 0 | 0 | 0 | 0% |
| 1Bhk | 35.70000076293945 | 0 | 0 | 0 | 0% |
| 1Rk | 14.300000190734863 | 0 | 0 | 0 | 0% |
Gayatri Niwas
| Type | Carpet (sq.ft) | Total | Booked | Available | Status |
|---|---|---|---|---|---|
| 1 BHK | 23.03 | 1 | 1 | 0 | 100% |
| 1 BHK | 27.26 | 1 | 0 | 1 | 0% |
| 1 BHK | 29.04 | 2 | 0 | 2 | 0% |
| 1 BHK | 32.04 | 10 | 5 | 5 | 50% |
| 1 BHK | 33.33 | 10 | 0 | 10 | 0% |
| 1 BHK | 33.76 | 10 | 4 | 6 | 40% |
| 1 BHK | 35.7 | 8 | 0 | 8 | 0% |
| 1RK | 14.3 | 1 | 1 | 0 | 100% |
Construction Progress
GAYATRI NIWAS
RERA Registered Amenities
✅
Aggregate area of recreational Open Space
10%
✅
Common area Lighting
⬜
Community Buildings
✅
Completion of Terraces with waterproofing of the Building
90%
✅
Door & Window to each of the each Flats / Premises
40%
✅
Electric Fittings within the Flats / Premises
25%
✅
Electrical fittings to Common Areas, water pumps,electro- mechanical equipment???s
✅
Electrical Meter Room, Sub-Station, Receiving Station
50%
✅
Energy management
✅
Excavation
100%
✅
External Plaster Elevation
100%
✅
External Plumbing
25%
✅
Finishing of entrance lobby/s, paving of areas appurtenant to Building, Compound Wall & all other re
✅
Fire Protection And Fire Safety
Requirements
✅
Flooring Within Flats Premises
70%
✅
Installation of Car Parking
✅
Installation of Fire Fighting System Provision Fittings and Equipment???s as per CFO NOC
40%
✅
Installation of Lifts
50%
✅
Internal Brick Block Wall
100%
✅
Internal Plaster
100%
⬜
Landscaping & Tree Planting
⬜
Open Parking
✅
Overhead Water Tanks
100%
✅
Painting
10%
✅
Plinth
100%
✅
RCC Slab of Super Structure
100%
✅
Sanitary Fittings within the Flats / Premises
✅
Sewerage (Chamber, Lines, Septic Tank , STP)
70%
✅
Side margin pavement
✅
Solid Waste Management And Disposal
50%
✅
Staircases, Lifts Wells, Lobbies at each Floor level connecting Staircases, Lifts
100%
✅
Stilt Floor
75%
✅
Storm Water Drains
70%
⬜
Street Lighting
⬜
Treatment And Disposal Of Sewage And Sullage Water
✅
Underground Water Tank
100%
✅
Water Conservation, Rain water Harvesting
100%
✅
Water Supply