📞 +91 98200 30685 ✉️
RERA: A51800043517

The Trees, Residential Phase 1

by Godrej Properties Limited Company
Certificate Signed P51800000165
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51800000165
Registration No.
REA51800003088
Registration Date
2021-09-09
Developer
Godrej Properties Limited Company
Architect
Kapadia Associates Design Llp
Project Bank
HDFC BANK
Proposed Possession
2022-06-30
Revised Possession
2022-06-30
Extended Possession
1900-01-01
Units Sold
0
Buildings
10
Project Area
14067.00 sq.m
Total FSI
34305.79
Approved FSI
34305.79
MahaRERA QR
The Trees, Residential Phase 1
MahaRERA — P51800000165
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors10
Sanctioned10
⬇️Basements2
🚗Open Parking6
🅿️Closed Parking28
📅Completion2021-06-30
🏗️Proposed Floors10
Sanctioned10
⬇️Basements2
🚗Open Parking6
🅿️Closed Parking28
📅Completion2021-06-30
🏗️Proposed Floors10
Sanctioned10
⬇️Basements2
🚗Open Parking6
🅿️Closed Parking28
📅Completion2021-06-30
🏗️Proposed Floors10
Sanctioned10
⬇️Basements2
🚗Open Parking6
🅿️Closed Parking26
📅Completion2021-06-30
🏗️Proposed Floors21
Sanctioned21
⬇️Basements2
🚗Open Parking19
🅿️Closed Parking83
📅Completion2021-06-30
🏗️Proposed Floors21
Sanctioned21
⬇️Basements2
🚗Open Parking20
🅿️Closed Parking87
📅Completion2021-06-30
🏗️Proposed Floors15
Sanctioned15
⬇️Basements2
🚗Open Parking8
🅿️Closed Parking35
📅Completion2021-06-30
🏗️Proposed Floors14
Sanctioned14
⬇️Basements2
🚗Open Parking10
🅿️Closed Parking47
📅Completion2021-06-30
🏗️Proposed Floors21
Sanctioned21
⬇️Basements2
🚗Open Parking23
🅿️Closed Parking99
📅Completion2021-06-30
🏗️Proposed Floors21
Sanctioned21
⬇️Basements2
🚗Open Parking20
🅿️Closed Parking90
📅Completion2021-06-30

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
1Bhk 43.06999969482422 0 0 0
0%
1Bhk 43.56999969482422 0 0 0
0%
1Bhk 43.599998474121094 0 0 0
0%
1Bhk 43.709999084472656 0 0 0
0%
1Bhk 44.029998779296875 0 0 0
0%
1Bhk 44.119998931884766 0 0 0
0%
1Bhk 44.61000061035156 0 0 0
0%
1Bhk 44.65999984741211 0 0 0
0%
1Bhk 44.66999816894531 0 0 0
0%
1Bhk 46.5 0 0 0
0%
1Bhk 47.81999969482422 0 0 0
0%
1Bhk 48.27000045776367 0 0 0
0%
1Bhk 48.45000076293945 0 0 0
0%
1Bhk 48.84000015258789 0 0 0
0%
1Bhk 50.91999816894531 0 0 0
0%
1Bhk 52.06999969482422 0 0 0
0%
2Bhk 60.97999954223633 0 0 0
0%
2Bhk 64.30999755859375 0 0 0
0%
2Bhk 64.95999908447266 0 0 0
0%
2Bhk 65.4000015258789 0 0 0
0%
2Bhk 65.47000122070312 0 0 0
0%
2Bhk 65.94999694824219 0 0 0
0%
2Bhk 66.06999969482422 0 0 0
0%
2Bhk 67.18000030517578 0 0 0
0%
2Bhk 75.72000122070312 0 0 0
0%
2Bhk 75.79000091552734 0 0 0
0%
2Bhk 77.5 0 0 0
0%
2Bhkcompact 60.68000030517578 0 0 0
0%
3Bhk 94.61000061035156 0 0 0
0%
3Bhk 96.5199966430664 0 0 0
0%
3Bhk 97.52999877929688 0 0 0
0%
3Bhk 98.55999755859375 0 0 0
0%
3Bhkcompact 76.91999816894531 0 0 0
0%
3Bhkcompact 77.97000122070312 0 0 0
0%
3Bhkcompact 78.06999969482422 0 0 0
0%
3Bhkcompact 79.66000366210938 0 0 0
0%
3Bhkcompact 81.30999755859375 0 0 0
0%
3Bhkcompact 81.9800033569336 0 0 0
0%
3Bhkcompact 92.62000274658203 0 0 0
0%
4Bhkcompact 120.0 0 0 0
0%
4Bhkcompact 122.16999816894531 0 0 0
0%
4Bhkcompactduplex 138.02000427246094 0 0 0
0%
5Bhkcompact 144.33999633789062 0 0 0
0%
Penthouse 193.32000732421875 0 0 0
0%
Penthouse 199.0399932861328 0 0 0
0%
Penthouse 202.38999938964844 0 0 0
0%
Penthouse 205.97000122070312 0 0 0
0%
Penthouse 207.25999450683594 0 0 0
0%
Penthouse 208.16000366210938 0 0 0
0%
Penthouse 209.08999633789062 0 0 0
0%
Penthouse 212.80999755859375 0 0 0
0%
Shop 11.5600004196167 0 0 0
0%
Shop 14.399999618530273 0 0 0
0%
Shop 14.75 0 0 0
0%
Shop 15.260000228881836 0 0 0
0%
Shop 16.280000686645508 0 0 0
0%
Shop 16.68000030517578 0 0 0
0%
Shop 17.299999237060547 0 0 0
0%
Shop 17.799999237060547 0 0 0
0%
Shop 18.399999618530273 0 0 0
0%
Shop 18.559999465942383 0 0 0
0%
Shop 18.760000228881836 0 0 0
0%
Shop 18.81999969482422 0 0 0
0%
Shop 20.790000915527344 0 0 0
0%
Shop 21.450000762939453 0 0 0
0%
Shop 21.59000015258789 0 0 0
0%
Shop 22.93000030517578 0 0 0
0%

A

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 43.6 6 6 0
100%
1 BHK 44.12 20 20 0
100%
3 BHKCOMPACT 78.07 1 1 0
100%
SHOP 18.4 1 0 1
0%
SHOP 18.56 1 0 1
0%
SHOP 18.76 1 0 1
0%
SHOP 20.79 1 0 1
0%

B

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 43.6 6 6 0
100%
1 BHK 43.71 6 6 0
100%
1 BHK 44.66 14 14 0
100%
3 BHKCOMPACT 77.97 1 1 0
100%
SHOP 11.56 1 0 1
0%
SHOP 14.4 1 0 1
0%
SHOP 15.26 1 0 1
0%
SHOP 16.28 1 0 1
0%
SHOP 16.68 1 0 1
0%

C

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 43.07 6 6 0
100%
1 BHK 43.57 6 6 0
100%
1 BHK 44.67 14 13 1
93%
3 BHKCOMPACT 76.92 1 1 0
100%
SHOP 11.56 1 0 1
0%
SHOP 17.8 1 0 1
0%
SHOP 21.45 1 0 1
0%
SHOP 22.93 1 0 1
0%

D

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 44.03 19 17 2
89%
1 BHK 44.61 7 6 1
86%

E

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 48.27 1 1 0
100%
2 BHK 65.4 13 13 0
100%
2 BHKCOMPACT 60.68 1 1 0
100%
3 BHKCOMPACT 79.66 15 14 1
93%
3 BHKCOMPACT 81.98 16 16 0
100%
PENTHOUSE 207.26 1 1 0
100%
PENTHOUSE 209.09 1 1 0
100%
SHOP 14.75 1 0 1
0%
SHOP 17.3 1 0 1
0%
SHOP 18.82 1 0 1
0%
SHOP 21.59 1 0 1
0%

F

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 65.47 14 14 0
100%
2 BHK 75.72 1 1 0
100%
3 BHK 94.61 14 14 0
100%
3 BHK 97.53 16 16 0
100%
3 BHKCOMPACT 81.31 1 1 0
100%
4 BHKCOMPACTDUPLEX 138.02 1 1 0
100%
PENTHOUSE 193.32 1 1 0
100%
PENTHOUSE 202.39 1 1 0
100%

G

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 46.5 11 11 0
100%
1 BHK 47.82 11 11 0
100%
1 BHK 52.07 1 1 0
100%
2 BHK 60.98 1 1 0
100%
2 BHK 64.31 11 11 0
100%

H

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 48.84 1 1 0
100%
1 BHK 50.92 1 1 0
100%
2 BHK 64.96 12 12 0
100%
2 BHK 65.95 11 11 0
100%
2 BHK 75.79 11 11 0
100%

I

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 48.45 1 1 0
100%
2 BHK 67.18 14 14 0
100%
2 BHK 77.5 1 1 0
100%
3 BHK 96.52 15 15 0
100%
3 BHK 98.56 16 16 0
100%
PENTHOUSE 199.04 1 1 0
100%
PENTHOUSE 205.97 1 1 0
100%

J

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 66.07 17 17 0
100%
3 BHKCOMPACT 92.62 1 1 0
100%
4 BHKCOMPACT 120.0 15 15 0
100%
4 BHKCOMPACT 122.17 14 14 0
100%
5 BHKCOMPACT 144.34 1 1 0
100%
PENTHOUSE 208.16 1 1 0
100%
PENTHOUSE 212.81 1 1 0
100%

Construction Progress

A

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

B

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

C

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

D

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

E

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

F

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

G

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

H

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

I

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

J

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space 100%
Community Buildings 100%
Electrical Meter Room, Sub-Station, Receiving Station 100%
Energy management 100%
Fire Protection And Fire Safety Requirements 100%
Landscaping & Tree Planting 100%
Open Parking 100%
Sewerage (Chamber, Lines, Septic Tank , STP) 100%
Solid Waste Management And Disposal 100%
Storm Water Drains 100%
Street Lighting 100%
Treatment And Disposal Of Sewage And Sullage Water 100%
Water Conservation, Rain water Harvesting 100%
Water Supply 100%
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.