Godrej Urban Park

by Godrej Properties Limited Company
Certificate SignedP51800028364

Project Information

RERA Certificate No.
P51800028364
Registration No.
REA51800084735
Registration Date
2021-09-08
Developer
Godrej Properties Limited Company
Project Bank
AXIS BANK
Proposed Possession
2026-09-30
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Units Sold
0
Buildings
9
Project Area
10984.01 sq.m
Total FSI
38088.93
Approved FSI
33307.07
MahaRERA QR
Godrej Urban Park
MahaRERA — P51800028364
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors19
Sanctioned19
⬇️Basements3
🅿️Closed Parking81
📅Completion2026-03-31
🏗️Proposed Floors19
Sanctioned19
⬇️Basements3
🚗Open Parking1
🅿️Closed Parking76
📅Completion2026-03-31
🏗️Proposed Floors19
Sanctioned19
⬇️Basements3
🅿️Closed Parking78
📅Completion2026-03-31
🏗️Proposed Floors19
Sanctioned19
⬇️Basements3
🅿️Closed Parking75
📅Completion2026-03-31
🏗️Proposed Floors19
Sanctioned19
⬇️Basements3
🅿️Closed Parking76
📅Completion2026-03-31
🏗️Proposed Floors19
Sanctioned19
⬇️Basements3
🅿️Closed Parking112
📅Completion2026-03-31
🏗️Proposed Floors19
Sanctioned19
⬇️Basements3
🅿️Closed Parking89
📅Completion2026-03-31
🏗️Proposed Floors19
Sanctioned19
⬇️Basements3
🅿️Closed Parking79
📅Completion2026-03-31
🏗️Proposed Floors15
Sanctioned15
⬇️Basements3
🅿️Closed Parking95
📅Completion2026-03-31

Apartment Configurations

None

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1Bhk36.83000183105469000
0%
1Bhk37.54999923706055000
0%
1Bhk38.95000076293945000
0%
1Bhk39.81999969482422000
0%
1Bhk40.16999816894531000
0%
1Bhk40.33000183105469000
0%
1Bhk40.470001220703125000
0%
1Bhk40.47999954223633000
0%
1Bhk41.5099983215332000
0%
1Bhk41.65999984741211000
0%
2Bhk55.47999954223633000
0%
2Bhk55.5099983215332000
0%
2Bhk55.52000045776367000
0%
2Bhk55.66999816894531000
0%
2Bhk55.7599983215332000
0%
2Bhk56.33000183105469000
0%
2Bhk56.40999984741211000
0%
2Bhk57.15999984741211000
0%
2Bhk58.779998779296875000
0%
2Bhk58.810001373291016000
0%
2Bhk58.84000015258789000
0%
2Bhk58.959999084472656000
0%
2Bhk61.15999984741211000
0%
2Bhk61.75000
0%
3Bhk82.83999633789062000
0%
3Bhk83.36000061035156000
0%
3Bhk83.88999938964844000
0%
3Bhk83.91000366210938000
0%
3Bhk84.12999725341797000
0%
3Bhk84.41000366210938000
0%
3Bhk85.97000122070312000
0%
3Bhk86.06999969482422000
0%
3Bhk86.5199966430664000
0%
3Bhk86.62000274658203000
0%
3Bhk86.6500015258789000
0%
3Bhk86.9000015258789000
0%
3Bhk87.04000091552734000
0%
3Bhk87.19000244140625000
0%
3Bhk87.22000122070312000
0%
3Bhk87.66000366210938000
0%
3Bhk87.70999908447266000
0%
Shop9.109999656677246000
0%
Shop9.449999809265137000
0%
Shop9.930000305175781000
0%
Shop11.319999694824219000
0%
Shop12.180000305175781000
0%
Shop12.300000190734863000
0%
Shop12.449999809265137000
0%
Shop13.260000228881836000
0%
Shop13.550000190734863000
0%
Shop14.489999771118164000
0%
Shop14.6899995803833000
0%
Shop15.319999694824219000
0%
Shop15.34000015258789000
0%
Shop15.529999732971191000
0%
Shop16.18000030517578000
0%
Shop16.360000610351562000
0%
Shop17.110000610351562000
0%
Shop17.530000686645508000
0%
Shop17.540000915527344000
0%
Shop17.940000534057617000
0%
Shop17.979999542236328000
0%
Shop18.0000
0%
Shop18.020000457763672000
0%
Shop18.1200008392334000
0%
Shop18.709999084472656000
0%
Shop19.399999618530273000
0%
Shop20.110000610351562000
0%
Shop20.520000457763672000
0%
Shop20.59000015258789000
0%
Shop20.889999389648438000
0%
Shop20.940000534057617000
0%
Shop20.950000762939453000
0%
Shop20.989999771118164000
0%
Shop21.31999969482422000
0%
Shop21.579999923706055000
0%
Shop21.600000381469727000
0%
Shop21.729999542236328000
0%
Shop21.770000457763672000
0%
Shop21.8700008392334000
0%
Shop22.020000457763672000
0%
Shop22.530000686645508000
0%
Shop23.020000457763672000
0%
Shop23.31999969482422000
0%
Shop23.40999984741211000
0%
Shop23.690000534057617000
0%
Shop24.649999618530273000
0%
Shop25.040000915527344000
0%
Shop25.81999969482422000
0%
Shop25.84000015258789000
0%
Shop26.049999237060547000
0%
Shop26.280000686645508000
0%
Shop26.579999923706055000
0%
Shop26.6200008392334000
0%
Shop26.940000534057617000
0%
Shop27.860000610351562000
0%
Shop28.360000610351562000
0%
Shop28.450000762939453000
0%
Shop28.809999465942383000
0%
Shop29.010000228881836000
0%
Shop29.389999389648438000
0%
Shop29.829999923706055000
0%
Shop30.540000915527344000
0%
Shop31.600000381469727000
0%
Shop31.75000
0%
Shop32.150001525878906000
0%
Shop32.77000045776367000
0%
Shop32.880001068115234000
0%
Shop32.97999954223633000
0%
Shop36.34000015258789000
0%
Shop37.04999923706055000
0%
Shop38.45000076293945000
0%
Shop38.9900016784668000
0%
Shop40.97999954223633000
0%
Shop61.720001220703125000
0%
Shop62.040000915527344000
0%
Shop77.66000366210938000
0%
Shop94.61000061035156000
0%
Shop94.91999816894531000
0%
Shop108.30000305175781000
0%
Shop111.30000305175781000
0%
Shop123.0199966430664000
0%
Shop141.30999755859375000
0%
Shop142.0000
0%
Studio25.75000
0%
Studio31.15999984741211000
0%

Tower 1

TypeCarpet (sq.ft)TotalBookedAvailableStatus
3 BHK83.9113130
100%
3 BHK84.1315150
100%
3 BHK85.9714113
79%
Shop22.53110
100%
Shop26.05110
100%
Shop94.61110
100%
Shop141.31110
100%

Tower 2

TypeCarpet (sq.ft)TotalBookedAvailableStatus
3 BHK86.07110
100%
3 BHK86.6212111
92%
3 BHK86.65110
100%
3 BHK86.914131
93%
3 BHK87.2212120
100%
Shop20.11110
100%
Shop21.87110
100%
Shop25.82110
100%
Shop26.28110
100%
Shop28.36110
100%
Shop32.98110
100%
Shop40.98110
100%

Tower 3

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK40.4715150
100%
2 BHK55.5112120
100%
2 BHK55.6712120
100%
2 BHK55.7612120
100%
2 BHK56.33110
100%
2 BHK56.41110
100%
Shop9.45110
100%
Shop11.32110
100%
Shop17.53110
100%
Shop17.54110
100%
Shop21.32110
100%
Shop21.6110
100%
Shop21.73110
100%
Shop23.02110
100%
Shop25.84110
100%
Shop29.01110
100%
Shop31.6110
100%
Shop108.3110
100%
Shop123.02110
100%

Tower 4

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK40.4814140
100%
2 BHK55.481486
57%
2 BHK58.7813130
100%
2 BHK58.9613130
100%
Shop9.93110
100%
Shop12.3110
100%
Shop15.32110
100%
Shop15.34110
100%
Shop22.02220
100%
Shop27.86110
100%
Shop29.39110
100%
Shop38.45110
100%
Shop38.99110
100%
Studio31.16110
100%

Tower 5

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK40.4814131
93%
2 BHK55.4814113
79%
2 BHK58.7813130
100%
2 BHK58.9613130
100%
Shop12.45110
100%
Shop15.53110
100%
Shop16.18110
100%
Shop17.98110
100%
Shop18.12110
100%
Shop19.4110
100%
Shop20.59110
100%
Shop20.89110
100%
Shop61.72110
100%
Shop62.04110
100%
Studio31.16110
100%

Tower 6

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK40.1714113
79%
1 BHK40.3312120
100%
1 BHK40.4712120
100%
1 BHK40.4813130
100%
1 BHK41.51101
0%
1 BHK41.66211
50%
2 BHK55.5225241
96%
2 BHK57.16110
100%
Shop9.11110
100%
Shop12.18110
100%
Shop13.26110
100%
Shop13.55110
100%
Shop14.49110
100%
Shop14.69110
100%
Shop16.36110
100%
Shop17.11110
100%
Shop17.94110
100%
Shop17.98110
100%
Shop18.0110
100%
Shop20.52110
100%
Shop20.94110
100%
Shop32.88110
100%
Shop36.34110
100%
Shop94.92110
100%
Shop111.3110
100%

Tower 7

TypeCarpet (sq.ft)TotalBookedAvailableStatus
2 BHK58.8128253
89%
3 BHK82.84110
100%
3 BHK83.3612120
100%
3 BHK87.19101
0%
3 BHK87.7112111
92%
Shop20.95220
100%
Shop21.77110
100%
Shop23.41110
100%
Shop23.69110
100%
Shop26.58110
100%
Shop28.45110
100%
Shop30.54110
100%
Shop32.15110
100%
Shop32.77110
100%
Shop37.05110
100%

Tower 8

TypeCarpet (sq.ft)TotalBookedAvailableStatus
3 BHK83.89110
100%
3 BHK84.4112120
100%
3 BHK86.52101
0%
3 BHK87.0412111
92%
3 BHK87.6614131
93%
Shop18.02110
100%
Shop18.71110
100%
Shop20.99110
100%
Shop21.58110
100%
Shop24.65110
100%
Shop26.62110
100%
Shop26.94110
100%
Shop28.45110
100%
Shop28.81110
100%
Shop29.39110
100%
Shop29.83110
100%
Shop31.75110
100%

Tower 9

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK36.8313211
15%
1 BHK37.55110
100%
1 BHK38.9515510
33%
1 BHK39.8215114
7%
2 BHK58.841367
46%
2 BHK61.161358
38%
2 BHK61.75110
100%
Shop23.32110
100%
Shop25.04110
100%
Shop77.66110
100%
Shop142.0110
100%
Studio25.75101
0%

Construction Progress

Tower 1

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing80%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

Tower 2

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing95%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

Tower 3

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing79%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing90%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

Tower 4

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate70%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.70%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises50%
Overall Percentage of Completion of the work done For the entire Building /Wing59%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing70%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

Tower 5

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate70%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.70%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises50%
Overall Percentage of Completion of the work done For the entire Building /Wing59%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing70%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

Tower 6

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.65%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate70%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.70%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises80%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing65%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

Tower 7

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.10%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate40%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.40%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises40%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.45%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks45%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing10%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

Tower 8

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.10%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate30%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.30%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises30%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises30%
Overall Percentage of Completion of the work done For the entire Building /Wing41%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.40%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks40%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing10%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

Tower 9

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure56%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.20%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks20%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure56%

RERA Registered Amenities

Aggregate area of recreational Open Space90%
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station90%
Energy management75%
Fire Protection And Fire Safety Requirements85%
Landscaping & Tree Planting85%
Open Parking70%
Sewerage (Chamber, Lines, Septic Tank , STP)95%
Solid Waste Management And Disposal70%
Storm Water Drains80%
Street Lighting50%
Treatment And Disposal Of Sewage And Sullage Water80%
Water Conservation, Rain water Harvesting85%
Water Supply80%
CallWhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.